Adding Turbo Lanes to T-Intersections
Study 2009
ONGOING.
Evaluate T-intersections that can be converted to turbo
lanes within the county boundaries. Contact
Jesus Guerra at 305.375.1647 for complete
details.
- Started May 2009. Expected completion is January 2010.
- Work by
David Plummer & Associates.
- The budgeted cost
is approximately $83,000 including 10% for contingencies.
- STATUS: 70% complete.
|
 |
Bicycle/Pedestrian Plan Update 2007
ONGOING. This will prepare an update to the MPO’s Bicycle and Pedestrian plans including a vision,
measurable goals and objectives, long range element and
short range element. Topics include on- and off-road
networks, prioritized pavement and trail projects, bike
parking, Bike & Ride, safe routes to school, municipal
coordination, encouragement and safety. Contact David Henderson at 305.375.1647 for
complete details.
- Started in September 2007.
Expected completion was October
2008.
- Work by
Gannett Fleming.
- The budgeted cost is $98,711.
|
 |
Bicycle Boulevard Planning Study 2009
ONGOING.
This study will
look at ways to improve conditions for bicycling through
the development of “bicycle boulevards” within the
county. Contact
David Henderson at 305.375.1647 for complete details.
- Started December 2008.
Expected completion was
October 2009.
- Work by
Kimley-Horn & Associates.
- The budgeted cost is
approximately $85,000.
|
 |
Community Characteristics Project
Phase VI 2009
ONGOING.
The objective is to review the social, economic, and
geographic characteristics of an area before public
involvement (PI) outreach is initiated. Contact
Elizabeth Rockwell
at 305.375.4507 for complete details.
|
 |
Congestion Management Process (CMP)
Update 2009
ONGOING.
This study will
update the Congestion Management System (CMS) to reflect
the new Federal requirement established under
SAFETEA-LU.
This update will be incorporated in the 2035 LRTP, as a
planning tool, as recommended in the 2007 Miami-Dade MPO
Federal Certification. It was expected to end during May
2009, but is still ongoing. Contact
Jesus Guerra
at 305.375.4507 for complete details.
- Started in September 2008.
- Work by
Gannett Fleming.
- The approximate cost is $79,439.
- STATUS: 90%
complete.
|
 |
Countywide Traffic Safety Program 2008
ONGOING.
A description of
this study is forthcoming. Contact David Henderson at 305.375.1647 for complete
details.
- Started January 2008. Expected
completion was December 2008.
- Work by the
University of Florida.
- The budgeted cost is approximately
$100,000.
|
 |
Cutler Bay Transportation Master Plan
2008
ONGOING.
Study the
existing and future conditions of the transportation
system within the
Town of Cutler Bay.
Contact Wilson
Fernandez at 305.375.4507 for complete details.
- Started September 2008. Expected
completion was April 2009.
- The approximate cost is
$100,000.
|
 |
CSX Corridor Evaluation Study 2008
ONGOING.
This study will evaluate the
feasibility of re-directing rail freight traffic outside
the urbanized Kendall area and examine various concepts
to introduce rapid transit service along the CSX rail
corridors south of the Oleander Junction. Contact Wilson Fernandez at 305.375.4507 for
complete details.
|
 |
Florida East Coast (FEC) Transit
Connection Study 2009
ONGOING.
This study will
provide a status report on recent developments and
evaluate the feasibility of implementing transit
services along
FEC corridor from
MIA to the Dadeland
area to complement a planned bicycle trail facility also
known as the Ludlam Trail project. Contact Wilson Fernandez at 305.375.4507 for
complete details.
- Started July 2008.
- Work by
Kimley-Horn & Associates.
- Expected completion was April 2009.
(Ongoing.)
- The approximate cost is $70,000.
- STATUS: 85%
complete.
|
 |
Locate Sites for Bus Shelter
Installations 2009
ONGOING.
Identify sites
suitable for the immediate installation of bus shelters.
Contact
Larry Foutz at
305.375.4507 for complete details.
- Started November 2008. Expected
completion was July 2009.
- Work by
David Plummer & Associates.
- The approximate cost was
$56,448.
- STATUS:
95% complete.
|
 |
Miami Beach Master Plan for the 16th
Street Corridor Study 2004
ONGOING.
A description of
this study is forthcoming. Contact
Wilson Fernandez
at 305.375.4507 for complete details.
- Started
September 2004.
Expected completion
during 2008.
|
 |
Miami Civic Center Circulator Study
Phase II 2007
ONGOING.
As a continuation of Phase I, it will focus in more
detail on implementation, routes and cost estimates,
contractual management and operation options analysis,
and financing plan. Contact
Larry Foutz at 305.375.4507 for
complete details.
- Started in April 2007.
Expected completion was
December 2008.
- Work by The Corradino
Group and the
City of Miami's
Office of Grant
Administration.
- The approximate cost is
$48,000. Part of the
Municipal Grant
Program.
|
 |
Miami-Dade County Bicycle and Pedestrian
Facility Maintenance Program 2008
ONGOING. It's to develop a
comprehensive maintenance program to ensure the
longevity and safety of greenway trails within the
county. Contact
David Henderson
at 305.375.1647 for complete details.
- Started in
December 2008.
Expected completion
was September 2009.
- Work by
Florida
International University.
- The
approximately cost
$80,000.
- STATUS:
70% complete.
|
 |
NE Corridor Traffic Flow
Implementation Plan Study 2008
ONGOING.
This study will
implement the improvements specified by the
Northeast Miami-Dade Traffic Flow
Study 2006. Contact
Larry Foutz at
305.375.4507 for complete details.
- Started in December 2008. Expected
completion was September 2009.
- Work by
Kimley-Horn & Associates.
- The approximate cost is $75,000.
- STATUS: 85%
complete.
|
 |
North Miami Beach US-1/NE 163rd Street Intersection
Study 2007
ONGOING.
A description
of this study is forthcoming. Contact Oscar Camejo at 305.375.4507 for
complete details.
|
 |
NW 7th Avenue Traffic and Pedestrians Study 2009
ONGOING.
A description
of this study is forthcoming. Contact
Larry Foutz at
305.375.4507 for complete details.
- Started May 2009. Expected
completion is January 2010.
- Work by
The
Corradino Group.
- The budgeted cost is approximately
$90,000.
- STATUS: 75%
complete.
|
 |
Opa-Locka Circulator/Transit
Improvement Feasibility Study 2008
ONGOING.
Develop a transit
system within the limits of the
City of Opa-Locka. Alternatives
should be developed considering different modes. Contact
Wilson Fernandez
at 305.375.4507 for complete details.
- Started in
December 2008.
Expected completion
was July 2009.
- Work by the
City of Opa-Locka.
- The approximate
cost is $70,000.
- STATUS:
50% complete.
|
 |
Pedestrian Safety at Miami-Dade
Regional Parks Study 2009
ONGOING.
A description
of this study is forthcoming. Contact
David Henderson at 305.375.1647 for
complete details.
- Started in
May 2009.
Expected completion
is January 2010.
- Work by
David Plummer & Associates.
- The cost
is $56,496.
- STATUS:
25% complete.
|
 |
Pedestrian/Bicycle Safety Study 2007
ONGOING.
This study will document existing traffic operations
conditions and alternative modes of transportation (bus
transit, pedestrian ways, bicycle connections, etc.) at
NE 163rd Street and Biscayne Boulevard; and develop
feasible alternatives. Contact
David Henderson
at 305.375.1647 for complete details.
-
Started
October
2007.
Expected
completion
was
September
2008
-
Work by the
City of North Miami Beach.
-
The
projected
cost
is
approximately
$20,000.
|
 |
Regional Freight Plan 2008
ONGOING.
This study will analyze existing and new data and, in
conjunction with the regional visioning process, develop
a regional freight strategy and make implementation
recommendations. Expected completion is December 2009. Contact
Larry Foutz at 305.375.4507 for complete details.
- Started in May 2008.
- Work by
Kimley-Horn & Associates (via
FDOT).
- The approximate cost is $33,000 (the MPO's
share of a tri-regional effort totaling
$198,791).
- STATUS: 95%
complete.
|
 |
Regional Long Range Transportation
Plan 2007
ONGOING.
A description of
this study is forthcoming. Contact
Wilson Fernandez
at 305.375.4507 for complete details.
- Started
December 2007.
Expected
completion is
March 2010.
- Work by
Kittelson and Associates (via
FDOT).
- The
estimated cost
to the MPO is
approximately $150,000 (share of a tri-regional effort totaling
$450,000).
- STATUS:
85% complete.
|
 |
Senior High School Student Safety
Campaign 2008
ONGOING.
This study will develop a
student pedestrian and vehicular safety campaign program
targeting senior high school students. Contact David Henderson
at 305.375.1647 for complete details.
|
 |
Service Enhancements to the Hialeah Transit System 2007
ONGOING. This study examines potential HTS
express transit service by examining the existing
service with the intention of providing services on less
congested roads on the periphery of the city and linking
key attractions and destinations. Contact
David Henderson at
305.375.1647 for complete details.
|
 |
South Florida Clean Energy and
Greenhouse Gas Emission Reduction Program 2009
ONGOING. It will
accelerate the
growth and development of alternative fuel fleets, fuel
suppliers and awareness in the four county regions.
Contact
Susan Schreiber
at 305.375.4507 for complete details.
|
 |
Transportation Innovations in the 21st Century 2007
ONGOING. This study will develop a menu of
innovative cutting edge strategies for enhancing the
county's transportation system in order to meet current
and future transportation needs using strategies that
employ state-of the art concepts in the areas of land
use, safety, technology and environmental protection.
The November 2007 completion not reached due to a
scope revision, and remains ongoing. Contact
Jesus Guerra at
305.375.4507 for complete details.
|
 |
US-1/SR-878 Intersection Sub-Area
Traffic Study 2009
ONGOING.
A description of
this study is forthcoming. Contact
Wilson Fernandez
at 305.375.4507 for complete details.
- Started May 2009. Expected completion is
November 2009.
- Work by
David Plummer & Associates.
- The budgeted cost is approximately $62,000.
- STATUS: 70% complete.
|
 |
|
|
| |
|
|