DCSIMG
Pending Transportation Studies at Miami-Dade MPO
Text only

Residents

Transportation Partners

MPO Staff
 

Governing Board

Committees

Plans

Programs

Studies

Downloads

 

InteracTIP 2010

TIP with Google Maps!

My Neighborhood

LRTP 2035

Civic Center/Health District

Intermodal Database

Integrated Transportation Information System
 

Cars and Vanpools

Buses, Trains, and Movers

Bicycling and Walking

Freight

Maritime and Aviation
 

Stay current. Subscribe>

Install Viewers.

 
 
Custom MPO Search
 
About Us   Contact Us
 
     
 

Aesthetic Guidelines for Transportation Projects in Miami-Dade County 2009

PENDING. Develop a set of countywide aesthetic guidelines and best practices to assist transportation agencies, project managers and consultants, as to how aesthetics can be incorporated into transportation projects. Study schedule to be determined. Contact Susan Schreiber at 305.375.4507 for complete details.

  • The approximate cost is $80,000.
  • STATUS: Pending scope revision.

Automated Bicycle Rental System and Parking Plan 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Study schedule to be determined.
  • The budgeted cost is approximately $55,000.
  • STATUS: General Planning Consultants (GPC) to be selected. (October 2009)

Bay Harbor Islands Pedestrian and Bicycle Master Plan 2009

PENDING. A description of this study is forthcoming. Contact Larry Foutz at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • Work by the Town of Bay Harbor Islands.
  • The budgeted cost is $18,665.
  • STATUS: Pending contract negotiation. (October 2009)

Bicycle/Pedestrian Mobility Plan for the Miami Downtown Development Authority 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Study schedule to be determined.
  • The budgeted cost is approximately $60,000.
  • STATUS: General Planning Consultant (GPC) to be selected. (October 2009)

Bicycle Safety Education Program 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Study schedule to be determined.
  • Work by University of Miami.
  • The budgeted cost is approximately $50,000.
  • STATUS: Pending contract negotiation. (October 2009)

City of Doral Transportation Master Plan Update 2009

PENDING. A description of this study is forthcoming. Contact Oscar Camejo at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • Work by the City of Doral.
  • Budgeted cost is approximately $40,000.
  • STATUS: Pending contract negotiation.

City of Miami Feasibility Study to Implement Car-Sharing Programs 2009

PENDING. Conduct a feasibility study to implement car-sharing program in the City of Miami. Contact Jesus Guerra at 305.375.4507 for complete details.

  • Study schedule is to be determined.
  • Work may be performed by the City of Miami or a consultant or through the Miami-Dade County's Equitable Distribution Program (EDP).
  • The approximate cost is $25,000.
  • STATUS: Funding not available. Conductor of study to be determined. (November 2009)

Comprehensive Parking Study for Freight Transport in Miami-Dade County Study 2009

PENDING. A description of this study is forthcoming. Contact Larry Foutz at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • The budgeted cost is approximately $65,000.
  • STATUS: General Planning Consultant (GPC) to be selected.

Countywide High-Crash Location Safety Study 2009

PENDING. A description of this study is forthcoming. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • Work by Miami-Dade Public Works.
  • The budgeted cost is approximately $75,000.
  • STATUS: Pending contract negotiation. (October 2009)

Countywide Park and Ride Facilities Study 2009

PENDING. A description of this study is forthcoming. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Study schedule is to be determined.
  • The budgeted cost is approximately $35,000.
  • STATUS: Equitable Distribution Program (EDP) firm to be selected. (October 2009)

Evaluation of Miami-Dade Transit's Trunk and Feeder Bus System Study 2009

PENDING. The objective of this study is to evaluate the Trunk and Feeder Bus System to be implemented by Miami-Dade Transit (MDT). Contact Jesus Guerra at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • The budgeted cost is approximately $85,000.
  • STATUS: On-hold until February 2010, awaiting route changes by MDT. (November 2009)

Hialeah Transit System Express Service Feasibility Study 2009

PENDING. A description of this study is forthcoming. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • Work by the City of Hialeah.
  • STATUS: Pending contract negotiation. (October 2009)

Improving Regional Transportation Planning 2009

PENDING. This study would document the traffic impacts of both the recent and forecast growth within the Health District/Civic Center Area. Contact Susan Schreiber at 305.375.4507 for complete details.

InteracTIP Project Tracking System 2010

PENDING. The proposed system would supplement the on-line capabilities of the InteracTIP to allow users to see the status of projects that are in previous TIPs. The application would be integrated with the existing InteracTIP process. It would be capable of: 1) identifying capacity related construction projects over $500,000 that appeared programmed on the first year of the FY 2005 TIP and have yet to begin deployment phases; 2) identifying a maximum of 30 projects to be included in this process that are still pending for completion; 3) monitoring the status of the selected projects on a quarterly basis or as determined by the MPO project manager; and, 4) providing a tool for listing the reasons for projects delay. Contact Carlos Roa at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • The budgeted cost is approximately $58,000.
  • STATUS: General Planning Consultant (GPC) to be selected. (October 2009)

Medley NW 116th Way Corridor Study 2009

PENDING. A description of this study is forthcoming. Contact Larry Foutz at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • Work by the Town of Medley.
  • The budgeted cost is $31,335.
  • STATUS: Pending contract negotiations. (October 2009)

Miami Springs 36th Street District Traffic Impact Study 2010

PENDING. Analyze impacts on traffic in Miami Springs along NW 36th Street. Study schedule to be determined. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • The budgeted cost is approximately $20,000.
  • STATUS: Pending consultant negotiation.

Miami-Dade Most Dangerous Locations for Elderly Pedestrians 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

Online Safe Routes to School Pilot Program 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Study schedule to be determined.
  • Work by Florida International University.
  • The budgeted cost is approximately $75,000.
  • STATUS: Pending contract negotiation. (October 2009)

Opa-Locka Sound Barrier Alternatives Study 2008

PENDING. This study will evaluate sound barrier alternatives for alleviating noise conditions along the South Florida rail corridor within the City of Opa-Locka. Contact Jesus Guerra at 305.375.4507 for complete details.

  • Study schedule to be determined.
  • Budgeted cost is approximately $65,000.
  • STATUS: Pending funds from FDOT.

Safe Routes to School Program Study 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Study schedule to be determined.
  • Work by the Village of Palmetto Bay.
  • The budgeted cost is approximately $40,000.
  • STATUS: Pending contract negotiation. (October 2009)

Web-based Bicycle Route Planning Tool 2009

PENDING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Study schedule to be determined.
  • Work by the Florida International University.
  • The approximate cost was $50,000.
  • STATUS: Pending contract negotiation. (October 2009)

Update of the Miami-Dade County GIS Crash Data System 2009

PENDING. To update the crash data system with the 2009 Florida Department of Highway Safety and Motor Vehicles crash data. Miami-Dade County receives data and scanned images of crash reports on monthly basis. The University of Florida (UF) team will obtain, cleanse, standardize, map and upload the 2009 crash data into the Miami-Dade crash data system. All crash data, including bicycle and pedestrian, will be processed. In addition, the UF team will train county personnel in the aforementioned processes as well as update the crash data system with any new features that may be available as system is improved. Contact Carlos Roa at 305.375.4507 for complete details.