Miami-Dade Metropolitan Planning Organization
This is the text version of the page titled Downloads.
Click here
for the formatted version.
Three options: Menu | Submenu | Contents
Menu: Home |
Resources | Boards and
Committees | Plans and Programs |
Studies | Downloads (you are here) |
Mini-Sites |
About Us
Downloads Submenu: Downloads
(you are here) | Past Meeting Minutes /
Agendas |
Resolutions |
Library Index
Contents: A | B |
C | D | E | F
| G | H | I | J
| K | L | M | N
| O | P | Q | R
| S | T | U | V
| W | X | Y | Z |
Search | Translate
A. (Next 15 items below have
links to Adobe PDF documents and may have items of their own.)
- Access to SW 137th Avenue to and from SR 874 (Don Shula Expressway)
Study (Next 2 items below.)
-
Executive Summary
-
Final Report
- Adding Turbo Lanes to T-intersections Study 2009 (Next 4 items below.)
-
Executive Summary, May 2010
-
Final Report, May 2010
-
TPC Presentation, May 2, 2010
-
Volume II: Appendices, May 2010
- Aesthetics Guidelines for Transportation Projects in Miami-Dade County
2009 (Next item below.)
-
Aesthetic Guidance and Action Plan, November 2011
- Aesthetics section of the MPO Library Index.
- Air Quality section of the MPO Library Index.
- Airport section of the MPO Library Index. (Next 3 items below.)
- 1977-1990
- 1991-1995
- 1996-2000
-
Airport Area Multimodal Access Study, Final Report April 1992 (Download
at SkyDrive)
-
Alternatives for Intermodal Improvements in Miami-Dade County Final Report,
June 1998 (Download
at SkyDrive)
- American Recovery and Reinvestment Act (Federal Stimulus) (Next 5 items
below.)
-
2009-2013 TIP document with Approved ARRA Projects
-
ARRA Administrative Amendments to 2010 TIP
-
ARRA Amendments to 2010 TIP
-
ARRA Local projects approved in 2009 TIP
-
ARRA State projects approved in 2009 TIP
- Annual Newsletters. See "Newsletters".
- Annual
Report 2011
- Annual Report of Miami-Dade Countywide ITS Efforts by Agency. See "ITS".
- Area Planning Studies section of the MPO Library Index.
- Arterial Grid Network Analysis 2006 (Next 3 items below.)
-
Executive Summary, March 2007
-
Final Report, March 2007
-
Presentation, 2007
-
Assessment of the Miami Urban Watch Alternative for Rebuilding I-395, July
2002. Get more at "I-395 Alternatives Review &
Development (and Financial Assessment) Study".
B. (Next 26 items below have
links to Adobe PDF documents and may have items of their own.)
- Bay Link (Next 2 items below.)
-
Bay Link Presentation of July 29, 2004
-
Rolling Along: Bay Link Completes Phase II newsletter, Fall 2004.
Get more at "Newsletters".
- Bicycle and Pedestrian Traffic Count Program 2006 (Next item below.)
-
May 2008 Report
- Bicycle Boulevard Planning Study 2009 (Next 2 items below.)
-
Field Review, April 2010
-
Final Report, December 2009
-
Bicycle Facilities map (Miami-Dade
Bicycle Facilities). Get at "maps".
-
Bicycle Facilities Plan 2001
-
Bicycle Facilities Plan 1997, Executive Summary (Download at SkyDrive)
-
Bicycle Parking Ordinance
- Bicycle Parking Plan for Miami-Dade Transit 2002 (Next 2 items below.)
-
Presentation
-
Report
-
Bicycle Pedestrian Program brochure, revised 2008
- Bicycle Project Feasibility Evaluation 2003 (Next item below.)
-
Final Report, November 2003
- Bicycle Safety Program Plan (Next 2 items below.)
-
Executive Summary, March 2006
-
Final Report, March 2006
-
Bicycle Safety: What Every Parent Should Know brochure
-
Bicycle Suitability map (Miami-Dade
County Bicycle Suitability). Get at "Maps".
-
Bicycle/Pedestrian Mobility Plan for the Miami Downtown Development
Authority 2009. (Next item below.)
-
Final Report, March 2011
- Bicycle/Pedestrian section of the MPO Library Index. (Next 5 items below.)
- Bike/Ped: Plans and Programs
- Bike/Ped: Studies 1995-1999
- Bike/Ped: Studies 2000-2010
- Bottom Shelf #2
- Bottom Shelf #3
- Bicycle/Pedestrian Plan Update 2007 (Next item below.)
-
Final Report (April 23, 2009)
- Bicyclist injuries and fatalities report. See the "Pedestrian/Bicyclist
Injuries & Fatalities Report 2008".
- Black Creek Trail Segment B Study 2006 (Next 2 items below.)
-
Executive Summary, October 2007
-
Final Report, October 2007
-
BPAC By-Laws, revised November 2009
-
BPAC
Vacancies List, revised March 28, 2012
- Brochure for the MPO. See the "MPO
Brochure, revised July 2011".
- Brochures (Next 21 items below.)
-
Bicycle Pedestrian Program brochure, revised 2008
-
Bicycle Safety: What Every Parent Should Know brochure
-
Buying a Bicycle brochure
-
Call for Ideas brochure 2012 (October
8, 2011)
-
City Cycling brochure
-
Easy Steps to Properly Fit a Bicycle Helmet; also available in
Spanish.
-
Efficient Transportation Decision Making brochure
-
Find the 12 Hazards brochure
-
How to Fit & Wear Your Bicycle Helmet brochure; also available in
Spanish.
-
How to Ride at Night brochure
-
How to "Talk" to People in Cars brochure
-
"Just Where Do I Belong?" brochure
-
Kids and Bicycle Safety brochure, also available in
Spanish.
-
Miami-Dade Intermodal Centers 2001 brochure
-
MPO Brochure (revised July 2011)
-
Prevent Bicycle Crashes: Parents and Caregivers brochure
-
Road Riders Are Drivers brochure
-
Safety Tip for Pedestrians brochure, in Haitian Creole
-
South Dade Greenway Network Everglades Trail brochure
-
South Dade Greenway Network Southern Glades Trail brochure
-
What You Need to Know About Group Riding brochure
- Bus-on-Shoulders Service Evaluation Study 2007 (Next 2 items below.)
-
Executive Summary, January 2009
-
Final Report, January 2009
- Bus Rapid Transit (BRT) (Next 4 items below.)
-
Technical Memorandum 1: Bus Rapid Transit Corridor Selection, October
2004
-
Technical Memorandum 2: Literature Review & Recommended Bus, February
2005
-
Technical Memorandum 3: Bus Rapid Transit, April 2005 Conceptual Design
-
What is BRT? (presentation)
- Business Plan. See the "MPO
Business Plan, November 25, 2009".
-
Buying a Bicycle brochure
C. (Next 49 items below have
links to Adobe PDF documents and may have items of their own.)
-
Call for Ideas brochure 2012 (October
8, 2011)
- Central Dade Transport Zone Study 2007 (Next 2 items below.)
-
Executive Summary, August 2008
-
Final Report, August 2008
- Certification documents. See "Federal MPO Certification 2011".
- Certification: Federal section of the
MPO Library Index.
- Citizen Advisory Committee Appointment Form (see
MPO Governing Board Citizens Advisory Committee Appointment Form)
- Citizen's Guide to Transportation 2010. Officially called "On
the Move... Miami-Dade County Pocket Guide to Transportation, Summer 2010".
Also available in
Spanish and
Haitian Creole.
- Citizen's Guide to Transportation 2007. Officially called "On
the Move... Miami-Dade County Pocket Guide to Transportation, Summer 2007".
Also available in
Spanish and
Haitian Creole.
- Citizen's Guide to Transportation 2004. Officially called "On
The Move... Miami-Dade County Pocket Guide to Transportation, Summer 2004".
-
City Cycling brochure
-
City of Aventura Municipal Public Transit Study Phase III: Transit
Enhancement, Expansion and Improvement Plan, November 2002
- City of Aventura Municipal Transit Study 1998 (Next 2 items below.)
-
Final Report, June 1998 (Download at SkyDrive)
- City of Doral Transportation Master Plan 2005 (Next 2 items below.)
-
Executive Summary, May 2007
-
Final Report, May 2007
- City of Coral Gables Circulator System Study 1996 (Next item below.)
-
Report, May 2001
- City of Coral Gables Trolley Route Expansion Study 2005 (Next 3 items
below.)
-
Executive Summary, 2006
-
Feasibility Report, March 2006
-
Presentation, 2006
- City of Hialeah Circulator Study 1997 (Next item below.)
-
Final Report, October 1998 (Download at SkyDrive)
- City of North Miami Beach Community Mobility Program 2002 (Next 2 items
below.)
-
Final Report, 2003
-
Project Bank and Work Plan, 2003
- City of Miami Beach Municipal Mobility Plan 1998 (Next 2 items below.)
-
Executive Summary (Download at SkyDrive)
-
Vision Statement (Download at SkyDrive)
- City of Miami Gardens Transportation Master Plan 2004. See the "Miami
Gardens Transportation Master Plan 2004".
- City of North Miami Beach Fulford City Center Geometric Roadway Design
Study 2003 (Next item below.)
-
Report of April 2003
- City of North Miami Beach Pedestrian and Bicycle Safety Analysis 2004
(Next item below.)
-
Report of December 20, 2004
-
City of North Miami Beach Pedestrian/Bicycle Safety Study, March 2008
- City of North Miami Bike, Park and Ride Study 2007. Formerly called
"North Miami Bicycle Parking and Transit Circulator Feasibility Study".
(Next item below.)
-
Final Report, June 2009
Presentation, June 2009
- City of South Miami Hometown Intermodal Transportation Study 2002 (Next
2 items below.)
-
Executive Summary, 2002
-
Final Report, August 2002
- City of South Miami Trolley/Circulator Feasibility Study 2006 (Next
items below.)
-
Executive Summary, August 2007
- City of South Miami US-1 Pedestrian Overpass Study 2000 (Next item
below.)
-
Report (Download at SkyDrive)
- City of Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway Study
2003 (Next item below.)
-
Final Report, September 2004
-
City of Sweetwater 107th Avenue Transit Greenways Corridor Final Report,
December 2003
- Civic Center TMO Commuter Characteristics Study 1994 (Next 2 items
below.)
-
Executive Summary, February 1998 (Download at SkyDrive)
-
Final Report, December 1997 (Download at SkyDrive)
- Coastal Communities Transportation Master Plan 2006 (Next item below.)
-
Final Report, August 2008
- Community Characteristics Project Phase VI 2009 (Next item below.)
-
Scope of Services 2006-07
- Community Urban Centers or CUC Ordinances. Officially called "Transit
Oriented Development Implementing Regulations for Perrine and Palmetto Bay -
South Dade Community Urban Centers Along The Busway".
- Compare Transit Survey Results 2010 (Next item below.)
- [to Actual Count Data]
Final Report, September 30, 2010
-
Completed Studies for Fiscal Year 2006-2007
-
Comprehensive Bicycle Plan, August 1986 (Download at SkyDrive)
-
Comprehensive Parking Study for Freight Transport in Miami-Dade County,
September 20, 2010
- Congested Intersection Improvement Phase 2 2006 (Next 4 items below.)
-
Executive Summary, March 2008
-
Volume I: Action Plan, March 2008
-
Volume II: Selected Data and Analysis, March 2008
-
Presentation, 2008
- Congestion Management Process (CMP) Update 2009 (Next 2 items below.)
-
Executive Summary, October 2009
-
Final Report, October 2009
- Congestion Management System Update 2003 (Next item below.)
-
Report, November 2004
- Congestion section of the MPO Library Index. (Next 6 items below.)
- 1990-1994
- 1995-1999
- 2000-2005
- 2006-2008
- 2009-2014
- Congestion: Superarterial Network
-
Continuity of Operations Plan (COOP) 2010
- Converting Rails to Transit, Bike & Pedestrian Facilities Study.
Officially called "Rail
Convertibility Study, November 2004"
- Corridor Studies section of the MPO Library Index. (Next
6 items below.)
- 1990-1995
- 1996-2000
- 2001-2002
- 2003-2004
- 2005-2008
-
2009-Present
- Countywide High-Crash Location Safety Study 2009
-
Appendices, February 2011
-
Final Report, February 2011
- Countywide Parking Policy Study for Miami-Dade County 1999 (Next 2 items
below.)
-
Executive Summary, October 1999 (Download at SkyDrive)
-
Final Report, August 1999 (Download at SkyDrive)
- Countywide Park and Ride Facilities Study 2009 (Next item below.)
-
Final Report, October 2010
- CSX Corridor Evaluation Study 2008 (Next 2 items below.)
-
Final Report, August 2009
-
Presentation, January 27, 2009
- CTAC documents (Next 5 items below.)
-
CTAC By-Laws, revised
June 2011 (Final)
-
CTAC Report 2008
-
CTAC Report 2006
-
CTAC Report 2005
-
CTAC Report 2004
-
CTAC presentations (Next 42 items below.)
-
April 11, 2012: MDAD's Public Wi-Fi Status Update
-
March 28, 2012: MDX's US-1 Express Lanes Project Development and
Environmental Study
-
February 29, 2012: 95 Express Progress Report
-
February 29, 2012: SR968/SW 1 Street Bascule Bridge at Miami River PD&E
Study
-
January 25, 2012: The Florida 511 Mobile App
-
November 2, 2011: MDAD's Public Wi-Fi Status Update
-
October 19, 2011: FDOT's Interstate I-75/SR 826 Managed Lanes
-
October 19, 2011: South Florida Regional Transportation Authority Fall
2011 Status Report to Partner Agencies
-
September 21, 2011: FDOT Downtown Miami Parking
-
September 7, 2011: FDOT Golden Glades Interchange PD&E
-
September 7, 2011: MSNA SW 17th Avenue
-
July 27, 2011: MDX Financial Planning Visioning Workshop Summary
-
July 13, 2011: Southeast Florida Intelligent Transportation Systems
-
June 29, 2011: City of Miami Trolley Program
-
June 29, 2011: Five Year Implementation Plan of the PTP
-
May 25, 2011: MDT Draft Transportation Development Plan
-
May 25, 2011: MIA Airbus A380 Preparedness
-
May 16, 2011: MDT TDP Annual Report (Download at SkyDrive)
-
May 11, 2011: Port of Miami Intermodal and Rail Reconnection Project
Update
-
May 11, 2011: Port of Miami Tunnel Analysis of Impacts presentation to
CTAC Maritime Subcommittee
-
May 11, 2011: Port of Miami Tunnel Update presentation to CTAC Maritime
Subcommittee
-
April 27, 2011: MDX's US-1 Express, The Role of Transit in Managed Lanes
-
March 16, 2011: MDX's presentation to CTAC Special Committee
-
February 23, 2011: NW 25 Street West Segment-Viaduct
-
February 9, 2011: Flights over Residential Neighborhoods South of SR-112
-
February 9, 2011: MIA Mover Progress
-
January 12, 2011: FEC Transit Connection Study
-
December 15, 2010: MDX's Visioning Workshop, Session 1
-
December 15, 2010: Port of Miami Tunnel
-
October 6, 2010: Port of Miami Freight Rail Access
-
October 6, 2010: Port of Miami Tunnel presentation to CTAC Maritime
Subcommittee
-
July 28, 2010: Homestead Extension of Florida's Turnpike Widening
-
July 28, 2010: Marlins Ballpark (Preliminary Transit Service Plans)
-
July 7, 2010: ATMS's Modernizing Miami-Dade's Signal System
-
July 7, 2010: MDPW's Utilizing GIS for Signage Location Updates
-
June 9, 2010: MIA's Central Boulevard Briefing
-
June 9, 2010: MIA's Mover Progress Briefing
-
June 9, 2010: MIA's Opa-Locka Air Traffic Control Tower Update
-
May 26, 2010: 2060 Florida Transportation Plan
-
May 26, 2010: I-95 Transportation Alternatives Study Project Update
-
May 12, 2010: MDT New Vehicle Procurement
-
July 22, 2009: CSX Corridor Evaluation Study
-
Current Traffic Crash Trends in Miami-Dade
- Curtiss Parkway/NW 36 Street Traffic Study 2005 (Next item below.)
-
Final Report, May 2006
D. (Next 7 items below have
links to Adobe PDF documents and may have items of their own.)
-
Dade County ITS Plan Element for the Intelligent Corridor System of
Southeast Florida (Download at SkyDrive). Get more at "ITS".
- Dadeland Regional Activity Center for Improving Mobility Study 1997
(Next 2 items below.)
-
Improving Mobility Report, September 1996 (Download at SkyDrive)
-
Implementation Measures Report, September 1998 (Download at SkyDrive)
- Demography section of
the MPO Library Index.
- Development of a Service Plan for Waterborne Transportation Services in
Miami-Dade County 2004 (Next 3 items below.)
-
Executive Summary, 2005
-
Final Report, 2005
-
Presentation, 2005
- Doral Circulator Study 2006 (Next item below.)
-
Final Report, May 2007
- Downtown Studies section of the MPO Library Index. (Next 4 items below.)
- 1970-1989
- 1990-1994
- 1995-1999
-
2000-2004
- Downtown Transportation Master Plan. Officially called "Miami Downtown
Transportation Master Plan 2001".
E. (Next 8 items below have
links to Adobe PDF documents and may have items of their own.)
- East-West section of the MPO Library Index. (Next 2 items below.)
- East-West: Corridor
- East-West: MIC
- Economic Impact of Parking Policy Options 1986 (Next item below.)
-
Final Report, October 1986 (Download at SkyDrive)
-
Efficient Transportation Decision Making brochure
- e-Government section of the
MPO Library Index.
- Electric Transit Circulator Feasibility Study 2000 (Next 2 items below.)
-
Final Report, 2001
-
Presentation, 2001
- Environmental section
of the MPO Library Index.
-
Evaluation of the Miami-Dade Pedestrian Safety Demonstration Project, June
2008
- Expressways section of the
MPO Library Index.
F. (Next 24 items below have
links to Adobe PDF documents and may have items of their own.)
-
FDOT District Six Tentative 5-Year Transportation Plan for Miami-Dade
County, 2005-2010
- Feasibility of Implementing Tech Centers in Miami-Dade County 2004 (Next
2 items below.)
-
Executive Summary, July 2006
-
Final Report, July 2006
- Feasibility of Utilizing Miami-Dade County Waterways for Urban Commuter
Travel 2002 (Next item below.)
-
Final Report, January 2003
- Feasibility Study: A Public-Private Partnership for Transit Vehicle
Purchasing and Leasing 1998 (Next item below.)
-
Report, January 1999 (Download at SkyDrive)
- Federal MPO Certification 2011
(Next 5 items below.)
-
Certification Report, revised November 2011
-
Media Advisory: FHWA & FTA Public Review, March 28, 2011
-
TMA Certification Public Comment Website Form
-
TMA Certification Review Public Input Meeting presentation, April 27,
2011
-
TMA Certification Review Public Meeting Agenda, April 27, 2011
- Federal MPO Certification 2007 (Next 7 items below.)
-
Federal MPO Certification 2007 (August 24, 2007)
-
2007 Transportation Management Area Certification, Review Questions for
Miami-Dade County
-
FHWA and FTA Conduct Public Review of Miami-Dade MPO Summary of Minutes,
May 16, 2007
-
FHWA and FTA Conduct Public Review of Miami-Dade MPO Public Meeting
Agenda, May 16, 2007
-
FHWA and FTA Conduct Public Review of Miami-Dade MPO Public Meeting
advertisement
-
Miami-Dade TMA Certification Review Agenda, May 16-17, 2007
-
Transportation Management Area Certification for Miami-Dade MPO, Comment
Form
-
Federal MPO Certification 2004 (May 24, 2004)
-
Federal Obligations Report for FDOT District 6, Fiscal Year 2009-2010
-
Federal Obligations Report for FDOT District 6, Fiscal Year 2008-2009
-
Federal Obligations Report for FDOT District 6, Fiscal Year 2007-2008
-
Federal Obligations Report for FDOT District 6, Fiscal Year 2006-2007
-
Federal Obligations Report for FDOT District 6, Fiscal Year 2005-2006
-
Federal Obligations Report for FDOT District 6, Fiscal Year 2004-2005
- Federal Stimulus. See "American Recovery and Reinvestment Act".
- Fiber-Optic Communications Concept Plan for Dade County's Intelligent
Transportation Infrastructure 1998 (Next item below.)
-
Report, June 1998 (Download at SkyDrive)
- Finance section of the
MPO Library Index.
-
Find the 12 Hazards brochure
- Flagler Street Reversible Flow Study 1992 (Next item below.)
-
Final Report, May 1992 (Download at SkyDrive)
- Florida East Coast (FEC) Transit Connections Study 2009 (Next 2 items
below.)
-
Executive Summary, December 2009
-
Final Report, December 2009
- Freight Movement Study 1996 (Next 2 items below.)
-
Executive Summary, December 1996 (Download at SkyDrive)
-
Final Report, December 1996 (Download at SkyDrive)
-
Freight newsletter, May 2002. Get more at "Newsletters".
- Freight section of the MPO Library Index. (Next 3 items below.)
- 1990-1999
- 2000-2008
- 2009-Present
- FSUTMS data files (Contact Carlos Roa
at 305.375.1833)
-
FTAC By-Laws, signed September 23, 2009
G. (Next 6 items below have
links to Adobe PDF documents and may have items of their own.)
-
General Planning Consultant: Studies Conducted under the GPC for FY
2004-2006
- GIS section of the MPO Library Index.
-
Glossary of Transportation Terms, revised August 2010
- Golden Glades Multimodal Transportation Facility Feasibility Study 1994
(Next 2 items below.)
-
Executive Summary, March 1994
-
Final Report, March 1994
-
Grade Separation Study, July 2005. Officially called "Miami-Dade County
Grade Separation Study".
-
Greenways Management and Maintenance Study report, October 2000
H. (Next 12 items below have
links to Adobe PDF documents and may have items of their own.)
-
Health District Comprehensive Traffic Study Final Report, May 2009
- Health District/Civic Center Transportation Area documents (Next 17
items below.)
-
12th Avenue Proposed Signage
-
Camillus House Center, July 18, 2008
-
Campus Master Plan presentation of September 12, 2007
-
Civic Center Transportation Management Organization, An Overview
-
Florida Dept. of Health, Miami-Dade Health Center for Excellence
-
Health District Bicycle and Pedestrian Mobility Plan, January 2012
-
Health District map book
-
Health District Transportation Meeting Minutes of September 12, 2007
-
Miami Civic Center Circulator draft final report, February 2006
-
Miami Health District Partnership Meeting presentation, July 21, 2008
-
Miami Health District Regional Activity Center presentation
-
Miami Health District Streetscape, Gateway, and Signage Improvements
Basis of Design final report, April 2008
-
Miami Health District Traffic Study presentation
-
Miller School of Medicine World Class Campus, June 2008
-
Miller World Class Campus Timeline presentation
-
NW 17th Avenue Bridge Reconstruction brochure
-
UM Miller School of Medicine Goldschmidt presentation
-
Hialeah Transit System Services and Opportunities Study Final Report,
December 2003
- High Occupancy Vehicle (HOV) Lanes section of the
MPO Library Index.
- High Speed Rail section of the MPO Library Index. (Next 2 items below.)
- 1986-1990
- 1991-1995
- Highway Bidirectional Volume maps. See "Maps".
- Highway Bidirectional Volume-to-Capacity maps. See "Maps".
- Historical section of the MPO Library Index.
-
How to Fit & Wear Your Bicycle Helmet brochure; also available in
Spanish.
-
How to Ride at Night brochure. Get more at "Brochures".
-
How to "Talk" to People in Cars brochure. Get more at "Brochures".
- Hurricane section of the MPO Library Index. (Next 2 items below.)
- Hurricane 1994
- Hurricane 1995
I. (Next 8 items below have
links to Adobe PDF documents and may have items of their own.)
- I-395 Alternatives Review & Development (and
Financial Assessment) Study
(Next 2 items below.)
-
Assessment of the Miami Urban Watch Alternative for Rebuilding I-395,
July 2002 (a pre-study review)
-
Final Report, April 2004
- Implementation of Advanced Warning in School Speed Zones Study 2011
(Next 2 items below.)
-
Executive Summary, March 2012
-
Final Report, March 2012
- Indirect Left Turns Study 2007
(Next 3 items below.)
-
Executive Summary, December 2008
-
Final Report, December 2008
-
Presentation of 2009
- InteracTIP 2003 (Next 3 items below.)
-
Executive Summary
-
Final Report
-
Presentation
- Intermodal & Multimodal section of the
MPO Library Index.
- Intermodal & Multimodal 1985-1995
- Intermodal & Multimodal 1996-Present
- Input data sets, transportation modeling. Contact
Carlos Roa at 305.375.1833 to get more information.
- ITS (Intelligent Transportation System) (Next 5 items
below.)
-
2006 Annual Report of Countywide ITS Efforts by Agency
-
2005 Annual Report of Countywide ITS Efforts by Agency
-
2004 Annual Report of Miami-Dade Countywide ITS Efforts by Agency
- Intelligent Transportation Plan for Dade County July 1996 (see
Dade County ITS Plan Element for the Intelligent Corridor System of
Southeast Florida) (Download at SkyDrive)
-
Intelligent Transportation System (ITS) Plan Update for Miami-Dade
County, June 1999 (Download at SkyDrive)
- ITS section of the MPO Library Index.
J. (Next 2 items below have
links to Adobe PDF documents and may have items of their own.)
-
Jitneys section of the
MPO
Library Index.
-
"Just Where Do I Belong?" brochure
K. (Next 3 items below have
links to Adobe PDF documents and may have items of their own.)
-
Kendall Drive Mobility Enhancement Study Final Report, September 2002
- Kendall-Link (Next 18 items below.)
-
Alternatives 2006
-
Alternatives A-1 to A-4, Kendall Drive (Bus Rapid Transit,
BRT/Metrorail) presentation of April 24, 2007
-
Alternative B-1, Turnpike Corridor (Metrorail) presentation of April 24,
2007
-
Alternatives C-2 to C-5, CSX Corridor (Diesel Multiple Unit, DMU)
presentation of April 24, 2007
-
Alternative D-1, SW 137th Avenue Corridor (Bus Rapid Transit, BRT)
presentation of April 24, 2007
-
Kendall-Link Final Report, September 2007
-
Kendall-Link Tier 1 Evaluation presentation of November 9, 2006
-
Kendall-Link Tier 2 Evaluation presentation of April 24 & 25, 2007
(revised)
-
Miami Area Employment Origins chart, April 2006
-
Miami-Dade & Kendall Area Population Growth charts, April 2006
-
Press Release, June 13, 2007
-
Press Release, March 30, 2007
-
Press Release, October 23, 2006
-
Press Release, March 17, 2006
-
Project Timeline 2006
-
Public Transportation Technology Review
-
Purpose, Need, Goals and Objectives (Final - July 2006)
-
Study Area Corridors 2006
-
Kids and Bicycle Safety brochure, also available in
Spanish.
L. (Next 12 items below have
links to Adobe PDF documents and may have items of their own.)
- Land Use section of the MPO Library Index.
(Next 2 items below.)
- Land Use 1994-2004
- Land Use 2005-Current
- Legislation/Regulation section of the
MPO Library Index.
- LeJeune Road Corridor Traffic Impact Study 1996 (Next item below.)
-
Draft Final Report, July 1996 (Download at SkyDrive)
- Local Coordinating Board (LCB) documents (Next 7 items
below.)
-
Florida Commission for the Transportation Disadvantaged Flowchart,
December 2011
-
Florida Transportation Disadvantaged Flowchart, December 2011
- LCB
By-Laws, September 13, 2011
-
LCB Membership Roster, December 2011
-
PIO/ADA People First Language presentation, June 2010
-
Transportation Disadvantaged Grievance Committee Appointments, 2010-2012
-
Transportation Disadvantaged Grievance Procedures, 2010-2011
- Local Municipal Transit Circulator Policy Study 2002
(Next 2 items below.)
-
Executive Summary, 2002
-
Final Report, 2002
- Locate Sites for Bus Shelter Installation Study 2008 (Next 2 items
below.)
-
Executive Summary, November 2009
-
Final Report, November 2009
-
Logo, MPO (This is a compressed Zip file containing various image file
formats.)
- Long Range Transportation Plan (LRTP) 2035. Get
more at "LRTP 2035
Website". (Next 5 items below.)
-
2035 Miami-Dade Transportation Plan Executive Summary, April 2010
-
Miami-Dade 2035 Long Range Transportation Plan Final Report, October 29,
2009
-
Miami-Dade 2035 Long Range Transportation Plan Presentation, October 29,
2009
-
Miami-Dade 2035 LRTP Revenue and Cost Summary, November 15, 2011
-
Summary of Amendments to the Miami-Dade Year 2035 Transportation Plan,
March 31, 2012
- Long Range Transportation Plan (LRTP) 2030 (Next
10 items below.)
-
Air Quality Conformity Determination Report, December 2004 Final report
-
Directional Trip Distribution Report, January 2005
-
Miami-Dade Long-Range Transportation Plan Update to the Year 2030
Steering Committee Meeting No. 1 presentation, May 28, 2003
-
Miami-Dade Transportation Plan to the Year 2030 Summary Document,
October 2004
-
Miami-Dade County Historical Selected Transportation Data 1980-2030
-
Miami-Dade Transportation Plan to the Year 2030, January 7, 2005, Final
Draft
-
Public Involvement Report, Long Range Transportation Plan Update to the
Year 2030
-
Summary of Proposed Amendments to the Miami-Dade Year 2030
Transportation Plan, October 2008
-
Summary of Proposed Amendments to the Miami-Dade Year 2030
Transportation Plan, February 2007
-
Summary of Proposed Amendments to the Miami-Dade Year 2030
Transportation Plan, May 28, 2009
- Long Range Transportation Plan (LRTP) 2025 (Next
4 items below.)
-
Miami-Dade Transportation Plan for the Year 2025, December 2001
-
Miami Urban Area Transportation Study (MUATS) & Year 2025 Plan Update,
Air Quality Conformity Determination Report, December 6, 2001
-
Summary of Amendments to the Miami-Dade Year 2025 Transportation Plan,
April 24, 2003
-
Summary of Amendments to the Miami-Dade Year 2025 Transportation Plan,
December 19, 2003
- Long Range Transportation Plan (LRTP) section of the
MPO Library Index. (Next 10 items
below.)
- LRTP 2000
- LRTP 2005
- LRTP 2010
- LRTP 2010 Model Validation
- LRTP 2015
- LRTP 2015 Model Validation (Box 1)
- LRTP 2015 Model Validation (Box 2)
- LRTP 2020
- LRTP 2025
- LRTP 2030
-
Ludlam Trail Non-Motorized Corridor Planning and Environmental Study Phase 1
Final Report, March 2003
M. (Next 39 items below have
links to Adobe PDF documents and may have additional items of their own.)
- Maps (Next 22 items below.)
-
Bicycle Suitability Map, October 2001
-
Colleges and Universities
-
Commission Districts & Municipalities (11" x 17")
-
Commission Districts 1 through 13,
revised November 2011 (This map book includes roads,
rail, ports, schools, public safety, and more!)
-
Highway Bidirectional Volume 1999
-
Highway Bidirectional Volume 2025
-
Highway Bidirectional Volume to Capacity 1999
-
Highway Bidirectional Volume to Capacity 2025
-
Major Neighborhoods (2008)
-
Metrobus Routes (countywide)
-
Metromover System
-
Metrorail System
-
Miami-Dade Bicycle Facilities,
revised January 17, 2012
-
Mountain Biking in Miami-Dade County (Unpaved Trails), revised March
7, 2011
-
Municipalities (This map book includes roads, rail, ports, schools,
public safety, and more!)
-
Oleta State Recreation Area Trail, 2001
-
Public Safety (This map book includes locations for all county and
municipal police and fire stations, and major hospitals.)
-
Planning Zones
-
South Link Alternatives 1-7 maps, May 2005
-
Subdivisions
- TAZ maps:
Letter-size (8.5" x 11");
Ledger-size (11" x 17"); and
D-size (22" x 34"). Contact
Carlos Roa
at 305.375.1833 for actual TAZ numbers.
-
Tri-Rail
-
MDTP 2025- Plans for a Better Transportation System newsletter, February
2002. Get more at "Newsletters".
-
Medley Sub-Area Freight Study Final Report, March 2009
-
Meeting Minutes
-
Metro-Dade Road Pricing Study Final Report, May 1995 (Download at
SkyDrive). Also called "Road Pricing Study".
- Metrorail M-Path Master Plan 2006. (Next 2 items below.)
-
Executive Summary, July 2007
-
Final Report, July 2007
- Miami Civic Center Circulator Study 2005. (Next item below.)
-
Final Report, February 2006
- Miami Downtown Transportation Master Plan 2001.
(Next 3 items below.)
-
Executive Summary, 2003
-
Final Report, April 2003
-
Presentation, 2001
- Miami Gardens Circulator Feasibility Study 2006. (Next 3 items below.)
-
Executive Summary, 2008
-
Final Report, January 2008
-
Presentation, 2008
- Miami Gardens Transportation Master Plan 2004. (Next 2 items below.)
-
Executive Summary, April 2006
-
Full Report, May 2006
- Miami Lakes Transportation Master Plan Final Report. See the "Town
of Miami Lakes Transportation Master Plan".
- Miami River Corridor Multi-modal Transportation Plan 2006. (Next 3 items
below.)
-
Executive Summary, August 2007
-
Final Report, August 2007
-
Appendices, August 2007
- Miami Springs 36th Street District Traffic Impact Study 2008. (Next item
below.)
-
Final Report, April 2009
- Miami Springs Transit System Services and Opportunity Study 2004. (Next
item below.)
-
Final Report, November 2004
- Miami Urban Area Transportation Study (MUATS) & Year 2025 Plan Update.
See "LRTP 2025".
- Miami-Dade County Grade Separation Study Final Report, July 2005. Also
called "Grade
Separation Study, July 2005".
-
Miami-Dade County & The Upper and Middle Keys 2005 Park and Ride Lot Plan
(FDOT study)
- Miami-Dade Countywide Consolidated Park-and-Ride Facilities Plan. See
the "Countywide Park and Ride Facilities Study 2009".
- Miami-Dade Freight Plan 2007. (Next 2 items below.)
-
Executive Summary, March 2009
-
Final Report, March 2009
-
Miami-Dade Intermodal Centers 2001 brochure
-
Miami-Dade Metropolitan Planning Organization 2008 Public Involvement
Outreach Events
-
Miami-Dade Metropolitan Planning Organization 2007 Public Involvement
Outreach Events
- Miami-Dade Transportation Plan for the Year 2025. See "LRTP
2025".
- Miami-Dade Transportation Plan to the Year 2030. See "LRTP
2030".
- Miracle Mile Traffic Circulation Study 1993. (Next item below.)
-
Final, May 1994 (Download at SkyDrive)
- Modeling data sets. Contact
Carlos Roa at 305.375.1833 for more information.
- Modeling section of the MPO Library Index.
(Next 3 items below.)
- Modeling
- Modeling: Southeast Regional
- Modeling: Stage 1 Rapid Transit
-
Modeling Support for Near-Term Public Transportation, November 30, 2010
- MPO Certification. See
"Federal MPO Certification 2011".
-
MPO Brochure (revised July 2011)
-
MPO Business Plan, November 25, 2009
-
MPO Governing Board Citizens Advisory Committee Appointment Form
-
MPO Governing Board Member Poster (revised
January 24, 2012)
-
MPO Logo (This is a compressed Zip file containing various image file
formats.)
-
MPO
Prospectus for Transportation Improvements, January 2010 Update
-
MPO Staff Organizational Chart (revised January 6, 2012)
- MUATS (Pre-LRTP) section of the MPO Library Index.
-
Municipal Grant Program (MGP) Summary List, FY 2008
- Municipal Master Plans section of the
MPO Library Index. (Next 3 items
below.)
- 1996-2000
- 2001-2005
- 2006-2012
N. (Next 14 items below have
links to Adobe PDF documents and may have items of their own.)
- Near-Term Plan for Improved Transportation Services Study 2010 (Next 3
items below.)
-
Final Report, October 2010
-
"Get Going" Brochure, December 2010
-
"Get Going" booklet, December 2010
- Newsletters (Next 42 items below.)
-
Fall 2011, Transportation Voice: Bicycling: A Viable Commuting Option;
also available in
Spanish.
-
Summer
2011, Transportation for a New Century annual newsletter; also
available in
Spanish and
Haitian Creole.
-
Spring 2011, Transportation Voice: Supporting Active Transportation;
also available in
Spanish and
Haitian Creole.
-
Winter 2010-11, Transportation Voice: Special Edition, Call for Ideas;
also available in
Spanish and
Haitian Creole.
-
Fall 2010, Transportation Voice: Municipal Transit Circulators; also available
in
Spanish and
Haitian Creole.
-
Summer
2010, Transportation for a New Century annual newsletter; also
available in
Spanish and
Haitian Creole.
-
Spring 2010, Transportation Voice: 2035 Long Range Transportation Plan;
also available in
Spanish and
Haitian Creole.
-
Winter 2009-10, Transportation Voice: Students Walk Safe with the "Safe
Routes to School" Program; also available in
Spanish and
Haitian Creole.
-
Fall 2009, Transportation Voice: Increasing the Use of Our Rail
Corridors to Move People and Freight; also available in
Spanish and
Haitian Creole.
-
Summer
2009, Transportation for a New Century annual newsletter; also
available in
Spanish and
Haitian Creole.
-
Spring 2009, Transportation Voice: South Florida Vanpool Program;
also available in
Spanish and
Haitian Creole.
-
Winter 2008-09, Transportation Voice: Regional Coordination; also
available in
Spanish and
Haitian Creole.
-
Fall 2008, Transportation Voice: Alternative Transportation Options;
also available in
Spanish and
Haitian Creole.
-
Summer 2008, Transportation for a New Century annual newsletter;
also available in
Spanish and
Haitian Creole.
-
Spring 2008, Transportation Voice: Transportation Safety; also
available in
Spanish and
Haitian Creole.
-
Winter 2007-08, Transportation Voice: Freight Transportation; also
available in
Spanish and
Haitian Creole.
-
Fall 2007, Transportation Voice: Tolling in Miami-Dade County; also
available in
Spanish and
Haitian Creole.
-
Summer 2007, Transportation for a New Century annual newsletter;
also available in
Spanish and
Haitian Creole.
-
Spring 2007, Transportation Voice: Transit Oriented Development;
also available in
Spanish and
Haitian Creole.
-
Winter 2006, Transportation Voice: The MPO's Unified Planning Work
Program; also available in
Spanish and
Haitian Creole.
-
Fall 2006, Transportation Voice: Waterborne Transportation in Miami-Dade
County; also available in
Spanish and
Haitian Creole.
-
Summer 2006, Transportation for a New Century annual newsletter;
also available in
Spanish and
Haitian Creole.
-
Spring 2006, Transportation Voice: The Bicycle Issue; also available
in
Spanish and
Haitian Creole.
-
Winter 2005-2006, Volume 6, South Miami-Dade Corridor Alternatives
Analysis newsletter. Get more at "South Link".
-
Winter 2006, Transportation Voice: The MPO Office; also available in
Spanish and
Haitian Creole.
-
Fall 2005, Transportation Voice: Public Involvement; also available
in
Spanish and
Haitian Creole.
-
Summer 2005, South Miami-Dade Transit Corridor Alternatives Analysis
newsletter. Get more at "South Link".
-
Summer 2005, Transportation for a New Century annual newsletter;
also available in
Spanish and
Haitian Creole.
-
March 2005, South Miami-Dade Corridor Alternatives Analysis newsletter.
Get more at "South Link".
-
Spring 2005, Transportation Voice: LRTP; also available in
Spanish and
Haitian Creole.
-
Winter 2005, Transportation Voice: Citizen Committees; also
available in
Spanish and
Haitian Creole.
-
Fall 2004, Rolling Along: Bay Link Completes Phase II newsletter.
Get more at "Bay Link".
-
Fall 2004, Transportation Voice: Bus Rapid Transit. Get more at "BRT".
-
Summer 2004, Miami-Dade Transportation Plan to the Year 2030; also
available in
Spanish and
Haitian Creole; and the mini-editions:
Beach/Downtown Edition,
Central Edition,
North Edition,
Northwest Edition,
South Edition, and
West Edition.
-
Summer 2004, Transportation for a New Century Annual Newsletter;
also available in
Spanish and
Haitian Creole.
-
Spring 2004, Air Quality and the Long Range Transportation Plan
-
Winter 2004, Transportation Voice: Regional Movements; also in
Spanish and
Haitian Creole.
-
Fall 2003, Quarterly Newsletter: Municipal Grant Program
-
Summer 2003, Transportation for a New Century annual newsletter;
also in
Spanish and
Haitian Creole.
-
Spring 2003, Quarterly Newsletter: Traveler Assistance and Technology:
The Way To Go
-
Spring 2002, Quarterly Newsletter: Freight
-
February 2002, MDTP 2025- Plans for a Better Transportation System.
Get more at "LRTP 2025" and "Newsletters".
-
North Dade Greenways Master Plan, December 1997
- North Miami Beach Pedestrian and Bicycle Safety Analysis. Officially
called "City
of North Miami Beach Pedestrian and Bicycle Safety Analysis, December 20,
2004".
- North Miami Bicycle Parking and Transit Circulator Feasibility Study.
Officially called "City of North Miami Bike, Park and
Ride Study 2007".
- North Miami Community Transit Circulator Study 2000. (Next 2 items
below.)
-
Executive Summary, 2000
-
Final Report, April 26, 2000
- North Ponce de Leon Boulevard Median Evaluation 2002. (Next 2 items
below.)
-
Executive Summary, November 2002
-
Final Report, November 2002
- Northeast Corridor Traffic Flow Implementation Plan Study 2008. Also
known as "Implementation Plan for the Northeast Corridor Traffic Flow
Study". (Next 2 items below.)
-
Executive Summary, January 2010
-
Final Report, January 2010
- Northeast Miami-Dade Traffic Flow Study 2006. (Next 5 items below.)
-
Executive Summary, 2007
-
Task 1 and 2 reports, July 2007
-
Task 3 report, August 2007
-
Task 4 and 5 reports, September 2007
-
Appendix A and B, July 2007
-
Northside Intermodal Terminal Feasibility Study Report, February 1986
(Download at SkyDrive)
- NW 7th Avenue Traffic and Pedestrian Study 2009. (Next item
below.)
-
Final Report, May 2010
- NW/NE 36th Street Study, 2006. (Next 2 items below.)
-
Executive Summary, June 2007
-
Final Report, June 2007
-
NW South River Drive Corridor Study, Volume 1: Engineering Analysis,
December 2003
- NW South River Drive Corridor Area Expansion Study, 2005. (Next 4 items
below.)
-
Volume 1: Engineering Analysis (Master Plan), November 2005
-
Volume 1: Appendix (Master Plan), November 2005
-
Volume 2: Traffic Report, November 30, 2005
-
Volume 2: Appendix (Traffic Report), November 2005
O. (Next 7 items below have
links to Adobe PDF documents and may have items of their own.)
- Oleta State Recreational Area Trails. Get more at "Maps".
-
On the Move... Miami-Dade County Pocket Guide to Transportation, Summer 2007.
Also called the "Citizen's Guide to Transportation 2007". Also available in
Spanish and
Haitian Creole.
-
On The Move... Miami-Dade County Pocket Guide to Transportation, Summer 2004.
Also called the "Citizen's Guide to Transportation 2004".
- Organizational Chart for the MPO. See the
"MPO Staff Organizational Chart".
-
Origin-Destination Surveys for Express Bus Services Final Report, March 12, 2012
- Outreach Events. (Next 2 items below.)
- Outreach Events 2008 (see
Miami-Dade Metropolitan Planning Organization 2008 Public Involvement
Outreach Events)
- Outreach Events 2007 (see
Miami-Dade Metropolitan Planning Organization 2007 Public Involvement
Outreach Events)
- Overview of Bus Rapid Transit Opportunities as Part of an Integrated
Multi-Modal Strategy to Alleviate Traffic Congestion in Miami-Dade County:
Technical Memorandums. See "Bus Rapid Transit".
P. (Next 23 items below have
links to Adobe PDF documents and may have items of their own.)
- Palmetto Bay Bicycle and Pedestrian Master Plan. See the "Village
of Palmetto Bay Bicycle & Pedestrian Master Plan, August 2009".
- Palmetto Bay Community Urban Center or CUC Ordinance. Officially called
"Transit Oriented Development
Implementing Regulations for Perrine and Palmetto Bay - South Dade Community
Urban Centers Along The Busway".
- Palmetto Bay Transportation Master Plan 2004. (Next 3 items below.)
-
Executive Summary
-
Final Report
-
Appendix B: Stakeholders List (Traffic Data Collection & Analysis)
- Palmetto Corridor Light Rail Transit Feasibility Study 1997. (Next item
below.)
-
Final Report, January 1997 (Download at SkyDrive)
- Parking section of the MPO Library Index.
(Next 4 items below.)
- Parking
- Parking: CUTR Studies 1993-1994
- Parking: Park&Ride 1992
- Parking: Park&Ride 1993
-
Pedestrian Plan 2001
-
Pedestrian/Bicyclist Injuries & Fatalities Report 2008
- Perrine District Community Urban Center or CUC Ordinance. Officially
called "Transit Oriented Development
Implementing Regulations for Perrine and Palmetto Bay - South Dade Community
Urban Centers Along The Busway".
- Planning Reviews section of the MPO Library Index.
- Pocket Guide to Transportation. Officially called "On
the Move... Miami-Dade County Pocket Guide to Transportation, Summer 2007";
available in
Spanish and
Haitian Creole.
- Pocket Guide to Transportation. Officially called "On
The Move... Miami-Dade County Pocket Guide to Transportation, Summer 2004".
Port of Miami City Street Improvements, September 2000. Also called
"Seaport Truck Study".
- Port of Miami Freight Access Study 2006. (Next 2 items below.)
-
Draft Executive Summary, January 2007
-
Final Report, February 2007
-
Prevent Bicycle Crashes: Parents and Caregivers brochure
- Prospectus. Officially called "MPO
Prospectus for Transportation Improvements, January 2010 Update".
- Prospectus section of the MPO Library Index.
- PSA Contest, 8th Annual. (Next 4 items below.)
-
Application
-
Brochure
-
Release Form
-
Rules and regulations
- Public Participation Plan (formerly Public Involvement Plan). (Next 7 items below.)
-
2004-2005
-
August 2005
-
March 2007
-
August 2009
-
October 2010
-
May 2011
-
March 2012
- Public Participation Evaluation Report (formerly Public Involvement
Evaluation Report). (Next 3 items below.)
-
2003-2004
-
2003-2006
-
2006-2010
-
Public Involvement Process Effectiveness Evaluation 2001
- Public Involvement Report, Long Range Transportation Plan Update to the
Year 2030. Get more at "LRTP 2030".
- Public Involvement section of the MPO Library Index.
- Public Service Announcement Contest. See "PSA Contest,
8th Annual".
- Public-Private Partnership section of the
MPO Library Index.
Q. (There are no downloads available in this
section.)
R. (Next 8 items below have
links to Adobe PDF documents and may have items of their own.)
-
Rail Convertibility Study, November 2004. Also called "Converting Rails
to Transit, Bike & Pedestrian Facilities Study".
- Railroads section of the MPO Library Index.
(Next 2 items below.)
- Railroads
- Bottom Shelf #2
-
Regional Long Range Transportation Plan 2035 Executive Summary.
Officially called "South Florida Regional Transportation Plan 2035".
- Regional Plans section of the MPO Library Index.
(Next 2 items below.)
- Regional Plans 1965-1999
- Regional Plans 2000-Present
- Resolutions
- Road Pricing Study. Officially called "Metro-Dade
Road Pricing Study Final Report, May 1995" (Download at SkyDrive).
-
Road Riders Are Drivers brochure
-
Rolling Along: Bay Link Completes Phase II newsletter, Fall 2004. Get
more at "Bay Link" and "Newsletters".
S. (Next 36 items below have
links to Adobe PDF documents and may have items of their own.)
- Safe Routes to Parks 2009. (Next 2 items below.)
-
Final Report, March 2010
-
Teen Driver Safety Week Poster, October 2009
-
Safe Routes to School 2008
-
Safe Routes to Pilot Schools Final, September 2005
- Safe Routes to School Program Study 2007. (Next 2 items below.)
-
District-wide Traffic Operations Studies No. 25
-
District-wide Traffic Operations Studies No. 26
- Safe Routes to School Program Study 2003. (Next 3 items below.)
-
Executive Summary, September 2005
-
Presentation, September 2005
-
Technical Memorandum No. 3, September 2005
-
Safety Tip for Pedestrians brochure, in Haitian Creole
- Safety/Emergency section of the MPO Library Index.
- School Zone Traffic Congestion Study. (Next 3 items below.)
-
Executive Summary, July 2002
-
Final Report, July 2002
-
Presentation, July 2002
- Seaport Truck Study. Officially called "Port
of Miami City Street Improvements, September 2000".
- Seaport section of the MPO Library Index.
- SEFTC. Visit the website for "SouthEast
Florida Transportation Council".
- Service Enhancements to the Hialeah Transit System 2007. Also called
"Hialeah Transit System Express Bus Route and Enhanced Service". (Next item
below.)
-
Draft Final Report, March 2008
- Short Range Truck Traffic Study. (Next 3 items below.)
-
Executive Summary, July 2002
-
Final Report, July 2002
-
Presentation, July 2002
-
Simulation and Analysis of Potential Mass Evacuation of Miami-Dade
Residents, June 2007
-
Snake Creek Bike Trail Planning & Feasibility Study Final Report, 2004.
Also called "Snake Creek Canal Bikeway Planning and Feasibility Study".
- Snapper Creek Trail Segment A Planning Study 2007. (Next 2 items below.)
-
Executive Summary, October 2008
-
Final Report, October 2008
-
South Beach Bicycle and Pedestrian Study Report, January 1995 (Download
at SkyDrive)
- South Dade Greenway Network brochures. (Next 2 items below.) Get more at "Brochures".
-
Everglades Trail
-
Southern Glades Trail
-
South Dade Greenways Network Master Plan, November 1994 (Download at
SkyDrive)
- South Dade Managed Lanes Study 2007. (Next 3 items below.)
-
Executive Summary, September 2008
-
Final Report, September 2008
-
Presentation, November 2008
- South Florida Regional Transportation Plan 2035. Also known as "Regional
Long Range Transportation Plan 2035 Executive Summary".
- South Florida Vanpool Program reports. (Next
5 items below.)
-
December 2005
-
June 2006
-
September 2006 (Transition Report)
-
June 2007
-
July 2008
- South Link. (Next 11 items below.)
-
Alternatives Analysis, Executive Summary, June 2006
-
Alternatives Analysis, Final Report, June 2006
-
Alternatives 1-7 maps, May 2005
-
Alternatives 2, 3, 5, 5A and 6 details, May 2006
-
Press Release of August 16, 2005
-
Purpose and Need Report, June 2005
-
Results of Corridor Meetings, Public Involvement Boards, March 2006
-
South Miami-Dade Transit Corridor Alternatives Analysis newsletter,
Winter [March] 2006 Get more at "Brochures".
-
South Miami-Dade Transit Corridor Alternatives Analysis newsletter,
Summer [August] 2005. Get more at "Brochures".
-
South Miami-Dade Transit Corridor Alternatives Analysis newsletter,
March 2005 Get more at "Brochures".
-
Tier II Evaluation matrix
- South Miami Hometown Intermodal Transportation Study, August 2002.
Officially called "City of South Miami Hometown
Intermodal Transportation Study".
-
South Miami Intermodal Transportation Study, June 29, 2001
- South River Drive Corridor Study. See the "Town
of Medley NW South River Drive Corridor Study 2003" and "Town
of Medley NW South River Drive Corridor Area Expansion Study 2005".
- Southeast Florida Transportation Council. Visit the website for "Southeast
Florida Transportation Council".
- Special Use Lane Study 2004. (Next 2 items below.)
-
Brochure, December 2004
-
Executive Summary, December 2004
- Special Use Lanes Study: Transit Use of Shoulder By-Pass Lanes 2005.
(Next item below.)
-
Final Report, December 2005
- Staff organizational chart. Officially "MPO
Staff Organizational Chart".
- Stimulus documents. See "American Recovery and Reinvestment Act".
- Strategies for Integration of Sustainability and the Transportation
System 2010. (Next 3 items below.)
-
Executive Summary, December 2011
-
Final Report, December 2011
-
Appendix, December 2011
-
Summary of Activities (Studies) as of May 15, 2007
- Summary of Amendments to the Miami-Dade Year 2025 Transportation Plan.
Get more at "LRTP 2025". (Next 2 items
below.)
-
April 24, 2003
-
December 19, 2003
- Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway Study. See
"City of Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway Study
2003".
- SW 152nd Street Corridor Transportation Study 2007. (Next 2 items
below.)
-
Executive Summary Report, July 2008
-
Final Report, July 2008
T. (Next 49 items below have
links to Adobe PDF documents and may have items of their own.)
- Table of Organization. See the "MPO
Staff Organizational Chart".
- TAZ or Traffic Analysis Zones. See "Maps".
- TDM/TSM section of the MPO Library Index.
-
Teen Driver Safety Week Poster (October 2009)
- Tentative 5-Year Transportation Plan for Miami-Dade County. Officially
called "FDOT
District Six Tentative 5-Year Transportation Plan for Miami-Dade County,
2005-2010".
- Title VI. (Next 4 items below.)
-
Title VI Report, December 2010
-
Title VI Report, March 2007
-
Title VI Report, February 2004
-
Title VI Review: Action Plan for Miami-Dade MPO, January 2002
- TMA/TMO section of the MPO Library Index.
(Next 2 items below.)
- TMA / TMO 1990-1999
- TMA / TMO 2000-Present
- Town of Medley NW 116th Way Corridor Study 2009.
(Next item below.)
-
Appendix, June 2010
- Town of Medley NW South River Drive Corridor
Area Expansion Study 2005. (Next 4 items below.)
-
Volume 1: Engineering Analysis (Master Plan)
-
Volume 1: Appendix (Master Plan)
-
Volume 2: Traffic Report
-
Volume 2: Appendix (Traffic Report)
- Town of Medley NW South River Drive Corridor
Study 2003. (Next item below.)
-
Volume 1: Engineering Analysis, December 2003
- Town of Medley Transit Circulator Implementation Study 2005. (Next 2
items below.)
-
Executive Summary, 2006
-
Final Report, September 2006
- Town of Miami Lakes Transportation Master Plan 2004.
Also called "Miami Lakes Transportation Master Plan".
(Next item below.)
-
Final Report, February 2004
- Traffic Analysis Zones (TAZ). See "Maps".
- Traffic Calming for Pedestrians at Miami-Dade College Wolfson Campus
2003. (Next 3 items below.)
-
Executive Summary, September 2004
-
Final Report, September 2004
-
Presentation, 2004
- Traffic Safety Plan for Elderly Pedestrians in Miami-Dade County 2010.
(Next item below.)
-
Report, March 2011
- Traffic Signs Research Study for Miami-Dade County 2006. (Next 3 items
below.)
-
Executive Summary, May 2007
-
Final Report, May 2007
-
Presentation, June 2007
- Transit Center Connections Study 2003. (Next 2 items below.)
-
Brochure, 2004
-
Final Report, December 2004
- Transit Contraflow Feasibility Study 2002. (Next 2 items below.)
-
Executive Summary, June 2002
-
Final Report, June 2002
- Transit Corridors section of the MPO Library Index.
(Next 4 items below.)
- Transit Corridors 1977-1989
- Transit Corridors 1990-1999
- Transit Corridors 2000-2009
-
Transit Corridors: Transitional 1992-1993
- Transit Hub Evaluation Study. (Next 2 items below.)
-
Draft Executive Summary, March 2009
-
Final Report, May 2009
- Transit section of the MPO Library Index.
(Next 13 items below.)
- Transit 1975-1985
- Transit 1986-1989
- Transit 1990-1994
- Transit 1995-1999
- Transit 2000-2005
- Transit 2006-Present
- Transit: CUTR Studies 1992
- Transit: CUTR Studies 1993
- Transit: CUTR Studies 1994
- Transit: Municipal 1995-1999
- Transit: Municipal 2000-2004
-
Transit: Municipal 2005-2009
-
Transit: Municipal 2010-Present
- Transit Oriented Development
Implementing Regulations for Perrine and Palmetto Bay - South Dade Community
Urban Centers Along The Busway. (Next 4 items below.)
-
Goulds Community Urban Center Citizens’ Master Plan Final Report, July
23, 2003
-
Goulds
Community Urban Center Zoning District Ordinance, 2007
-
Princeton
Charrette Report, January 2004
-
Princeton Community Urban Center Zoning District Ordinance, 2007
- Transport 2030. See "LRTP 2030".
- Transportation and Economic Impacts of the Freight Industry in
Miami-Dade County 2010. (Next 3 items below.)
-
Executive Summary, December 2011
-
Final Report, December 2011
-
Presentation, December 7, 2011
- Transportation Data Management System (TDMS). (Next 2 items below.)
-
Executive Summary, March 2002
-
Final Report, March 2002
- Transportation Demands of the 21st Century Study. (Next 2 items below.)
-
Executive Summary
-
Final Report
- Transportation Disadvantaged section of the
MPO Library Index. (Next 3 items
below.)
-
Transportation Disadvantaged 1980-1990
-
Transportation Disadvantaged 1991-1995
-
Transportation Disadvantaged 1996-2000
- Transportation Disadvantaged Local Coordinating Board (LCB) and related
documents. See "Local Coordinating Board (LCB) documents".
- Transportation Disadvantaged Safety Plan documents. (Next 2 items below.)
-
Transportation Disadvantaged Service Plan (TDSP) 2012-2016
- TDSP
2012-2016 Reference
- Transportation Enhancement Program (TEP). (Next 2 items below.)
-
Brochure, 2002
-
General Guidelines and Application Form, revised 1999
- Transportation Improvement Program (TIP) 2013.
(Next 2 items below.)
-
Draft Citizen's Version, March 2013
-
Draft Report, March 30, 2013
- Transportation Improvement Program (TIP) 2012.
(Next 2 items below.)
-
Citizen's Version,
July 1, 2011
-
Final Report, June 30, 2011
- Transportation Improvement Program (TIP) 2011.
(Next 3 items below.)
-
Citizen's Version, adopted June 17, 2010
-
Final, adopted June 17, 2010
-
Summary of Amendments, March 1, 2011
- Transportation Improvement Program (TIP) 2010. (Next 5 items below.)
-
Citizen's Version, May 28, 2009
-
Errata Sheet, May 1, 2006
-
Final Draft, May 28, 2009
-
Project Listing, May 19, 2009
-
Roll Forward List, October 29, 2009
- Transportation Improvement Program (TIP) 2009. (Next 2 items below.)
-
Citizen's Version
-
Final Report, May 22, 2008
- Transportation Improvement Program (TIP) 2008. (Next 4 items below.)
-
Citizen's Version
-
Final Report
-
Errata Sheet, April 30, 2007
-
Roll Forward Report, July 18, 2007
- Transportation Improvement Program (TIP) 2007. (Next 2 items below.)
-
Citizens' Version
-
Final Report
- Transportation Improvement Program (TIP) 2006. (Next 3 items below.)
-
Annual Listing of Projects (Federal Obligations Report)
-
Citizen's Version
-
Final Report, June 23, 2005
- Transportation Improvement Program (TIP) 2005. (Next 4 items below.)
-
Air Quality Conformity Determination Report (CDR)
-
Annual Listing of Projects (Federal Obligations Report)
-
Citizen's Version
-
Draft Report, February 5, 2004
- Transportation Improvement Program (TIP) 2004. (Next 3 items below.)
-
Air Quality Conformity Determination Report (CDR)
-
Citizens' Version
-
Final Draft, May 22, 2003
- Transportation Improvement Program (TIP) 2003. (Next 3 items below.)
-
Air Quality Conformity Determination Report (CDR)
-
Annual Listing of Projects (Federal Obligations Report)
-
Citizens' Version
- Transportation Improvement Program (TIP) section of the
MPO Library Index. (Next 11 items
below.)
- TIP 1977-1985
- TIP 1986-1990
- TIP 1991-1995
- TIP 1996-1999
- TIP 2000-2003
- TIP 2004-2005
- TIP 2006-2007
- TIP 2008-2009
- TIP 2010-2011
- TIP: Air
Quality CDR
- TIP: Citizen
Versions
- Transportation modeling data sets. Contact
Carlos Roa at 305.375.1833 for more information.
-
Transportation System Hurricane Emergency Preparedness Plan, 1995
(Download at SkyDrive)
- Transportation Systems Performance Monitoring Study. (Next 2 items
below.)
-
Report
-
State of the County
- Trends in Heavy Truck Traffic Management 2003. (Next 3 items below.)
-
Executive Summary, February 2005
-
Final Report, February 2005
-
Presentation, February 2005
- Tri-Rail section of the
MPO Library Index.
- Truck Route System for Miami-Dade County 2006. (Next 2 items below.)
-
Executive Summary, June 2007
-
Final Report, June 2007
- Turnpike section of the
MPO Library Index.
-
Typical Roadway Section and Zoned Right-of-Way Update Study 2007 Workbook
U. (Next 5 items below have
links to Adobe PDF documents and may have items of their own.)
- Unified Planning Work Program (UPWP) for Transportation. (Next 9 items
below.)
-
2003 UPWP
-
2004 UPWP
-
2005 UPWP
-
2006 UPWP
-
2007 UPWP
-
2008 UPWP
-
2009-2010 UPWP
-
2011-2012 UPWP
-
2013-2014 UPWP
- Unified Planning Work Program (UPWP) for Transportation section of the
MPO Library Index. (Next 6 items
below.)
- UPWP 1970-1980
- UPWP 1981-1989
- UPWP 1990-1995
- UPWP 1996-2000
- UPWP 2001-2006
- UPWP 2007-2014
-
Unpaved (Mountain Bike) Trails 2008. Get more at "Maps".
- US-1 Intersection Improvement Study - Village of
Pinecrest 2007. (Next 2 items below.)
-
Presentation, May 10, 2008
-
Report, April 3, 2008
- US-1 Reversible Flow Lane Study 2006. (Next 3 items below.)
-
Executive Summary, October 2007
-
Final Report, December 2007
-
Presentation, January 7, 2007
V. (Next 4 items below have
links to Adobe PDF documents and may have items of their own.)
- Vanpool Reports. See "South Florida Vanpool Program reports".
- Vanpool section of the
MPO Library Index.
- Village of Palmetto Bay Bicycle & Pedestrian Master Plan 2008. (Next
item below.)
-
Master Plan, August 2009
- Village of Pinecrest US-1 Intersection Improvement Study. See the "US-1
Intersection Improvement Study - Village of Pinecrest".
W. (Next 9 items below have
links to Adobe PDF documents and may have items of their own.)
-
Water Transit Services Executive Summary (March 2007)
- Water Transit section of the MPO Library Index.
- Waterborne Transit Services Study. Officially called "Development
of a Service Plan for Waterborne Transportation Services in Miami-Dade
County 2004".
- Waterways Study. Officially called "Feasibility
of Utilizing Miami-Dade County Waterways for Urban Commuter Travel, January
2003".
-
Welfare to Work: Transportation Issues and Opportunities in Miami-Dade
County, December 4, 1998, Final Report (Download at SkyDrive)
- West Flagler Street Corridor Study 1997. (Next 2 items below.)
-
Final Report, September 1997 (Download at SkyDrive)
-
Implementation Measures, September 1998 (Download at SkyDrive)
-
Westchester Traffic Impact Study Final Report, June 30, 2008
-
What is BRT? (presentation). Get more at "Bus Rapid Transit".
-
What You Need to Know About Group Riding brochure. Get more at
"Brochures".
X. (There are no downloads available in this
section.)
Y. (There are no downloads available in this section.)
Z. (There are no downloads available in this section.)
#. (Next 3 items below have
links to Adobe PDF documents and may have items of their own.)
- 2011 Annual
Report
- 79th Street Corridor Neighborhood Initiative (Redevelopment Plan). (Next
2 items below.)
-
Final Report, December 2003
-
Presentation, October 2005
- 137th Avenue Corridor Study. (Next 2 items below.)
-
Executive Summary
-
Final Report, June 2007
Search
Translate
Copyright © 1977-2010 Metropolitan Planning Organization for the Miami
Urbanized Area