Table of Contents. (Next 211 items are links to the List of
Transportation Studies also located on this page.)
- 79th Street Corridor Neighborhood Initiative 2002
- 107th Avenue Pedestrian and Transit Greenways
Corridor Study 2002
- 137th Avenue Corridor Study 2005
- Access to SW 137th Avenue to and from SR 874
Study
- Adding Turbo Lanes to T-Intersections Study 2009
- Aesthetic Guidelines for Transportation Projects
in Miami-Dade County 2009
- Arterial Grid Network Analysis 2006
- Arterial Investment Study: 107th Avenue
- Automated Bicycle Rental System and Parking Plan
2009
- Bay Link (Miami-Miami Beach Transportation Corridor
Study 2002)
- Bicycle/Pedestrian Mobility Plan for the Miami
Downtown Development Authority 2009
- Bicycle/Pedestrian Plan Update 2007
- Bicycle and Pedestrian Traffic Count Program 2006
- Bicycle Boulevard Planning Study 2009
- Bicycle Facilities Plan 1997
- Bicycle Parking Plan for Miami-Dade Transit 2002
- Bicycle Project Feasibility Evaluation 2003
- Bicycle Safety Education Program 2009
- Bicycle Safety Program Plan 2005
- Bikes-on-Bus Service Delivery in Dade County
Study 1995
- Black Creek Trail Segment B Study 2006
- Bus Rapid Transit Opportunities Study 2003
- Bus-on-Shoulder Service Evaluation Study 2007
- Central Dade Transport Zone Study 2007
- Citizen's Guide to Transportation 2004 (also known as
Pocket Guide)
- Citizen's Guide to Transportation 2007 (also
known as Pocket Guide)
- City of Aventura Municipal Transit Study 1998
- City of Coral Gables Circulator System Study 1996
- City of Doral Transportation Master Plan 2005
- City of Doral Transportation Master Plan Update
2009
- City of Hialeah Circulator Study 1997
- City of Homestead Downtown Area Transportation
Plan Update 2003
- City of Miami Beach Municipal Mobility Plan 1998
- City of Miami Car-Sharing Feasibility Study 2009
- City of Miami Gardens Transportation Master Plan
2004
- City of Miami Health District Bicycle and
Pedestrian Mobility Study 2011
- City of Miami Springs 36th Street District
Traffic Impact Study 2008
- City of Miami Springs Traffic Circulation and
Parking Study for Westward Drive 2010
- City of North Miami Beach Community Mobility
Program 2002
- City of North Miami Beach Fulford City Center
Geometric Roadway Design Study 2003
- City of North Miami Beach Pedestrian & Bicycle
Safety Analysis Study 2004
- City of North Miami Bike, Park and Ride Study
2007
- City of South Miami Hometown Intermodal
Transportation Study 2002
- City of South Miami Trolley/Circulator
Feasibility Study 2006
- City of South Miami US-1 Pedestrian Overpass
Study 2000
- City of Sunny Isles Bridge to Link a
Pedestrian/Bicycle Greenway Study 2003
- Civic Center TMO Commuter Characteristics Study
1994
- Civic Center TMO Pedestrian Amenities and Safety
Study
- Coastal Communities Transportation Master Plan 2006
- Coconut Grove Planning Study 1996
- Compare Transit Survey Results Study 2010
- Comprehensive Parking Study for Freight
Transport in Miami-Dade County Study 2009
- Community Characteristics Project Phase V 2008
- Community Characteristics Project Phase VI 2009
- Congestion Intersection Improvement Study Phase
II 2006
- Congestion Management Process (CMP) Update 2009
- Congestion Management System Update Study 2003
- Coral Gables Trolley Route Expansion Study 2005
- Countywide High-Crash Location Safety Study 2009
- Countywide Park and Ride Facilities Study 2009
- Countywide Parking Policy Study for Miami-Dade
County 1999
- Countywide Traffic Safety Program 2008
- CSX Corridor Evaluation Study 2008
- Curtiss Parkway/NW 36 Street Traffic Study 2005
- Cutler Bay Town-Wide Bicycle and Pedestrian
Master Plan 2010
- Dadeland Regional Activity Center Study 1997
- Develop Procedures and Criteria for Establishing
School Crossing Guard Locations 2010
- Development of a Service Plan for Waterborne
Transportation Services in Miami-Dade County 2004
- Doral Circulator Study 2006
- Downtown Kendall Transportation Study 2002
- East West Corridor Study
- Economic Impact of Parking Policy Options 1986
- Effects of Transportation Plan Development on
Minority and Impoverished Urban Communities 1998
- Electric Transit Circulator Feasibility Study 2000
- Electrowave Shuttle Report 1998
- Evaluation of Current Methodology to Determine
Traffic Concurrency 2010
- Feasibility of Implementing Tech Centers in
Miami-Dade County 2004
- Feasibility of Utilizing Miami-Dade County
Waterways for Urban Commuter Travel 2002
- Feasibility Study: A Public-Private Partnership
for Transit Vehicle Purchasing and Leasing 1998
- Feasibility Study: Northside Intermodal Terminal
1985
- Fiber Optic Communications Concept Plan for
Miami-Dade County's Intelligent Transportation Infrastructure 1998
- Freight Movement Study 1996
- Flagler Street Reversible Flow Study 1992
- Florida East Coast (FEC) Transit Connection Study
2009
- Golden Glades Multimodal Transportation Facility
Feasibility Study 1994
- Health District Comprehensive Traffic Study 2008
- Hialeah Transit System Express Service
Feasibility Study 2009
- Hialeah Transit System Services And Opportunities
Study 2003
- I-395 Alternatives Financial Assessment Study
2002
- Implementation of Advanced Warning in
School Speed Zones Study 2011
- Improving Access in FIU Biscayne Bay Campus
Area 2010
- Improving Regional Transportation Planning 2011
- Indirect Left Turns Study 2007
- Integrated Transportation Information System (ITIS)
2010
- Integrated Transportation Management System (ITMS)
1998
- Intelligent Transportation System Plan for Dade
County 1996
- Intelligent Transportation System Plan Update
for Miami-Dade County 1999
- InteracTIP 2003
- Interactive Transportation Information Systems
(Kiosk) 1997
- Investigation of Alternative TMAs 1994
- Kendall Drive Mobility Enhancement Study 2002
- Kendall-Link Alternatives Analysis Study 2005
- LeJeune Road Corridor Traffic Impact Study 1996
- Local Municipal Transit Circulator Policy Study
2002
- Locate Sites for Bus Shelter Installations Study
2008
- Ludlam Trail Non-Motorized Corridor Planning
Environmental Study 2003
- Metro-Dade Road Pricing Study 1994
- Metropolitan Dade County Comprehensive Bicycle
Plan 1986
- Metropolitan Planning Organization Congested
Intersections Study 1999
- Metrorail M-Path Master Plan 2006
- Metrorail/Coconut Grove Connection Study Phase
II 2004
- Miami Beach Intermodal Feasibility Study 1999
- Miami Beach Master Plan for the 16th Street
Corridor Study 2004
- Miami Civic Center Circulator Study 2005
- Miami Civic Center Circulator Study Phase II
2007
- Miami Downtown Transportation Master Plan 2001
- Miami Gardens Circulator Feasibility Study 2006
- Miami River Corridor Multimodal Transportation
Plan 2006
- Miami Springs Transit System Service and
Opportunity Study 2004
- Miami Surface Shuttle Services Technical
Assistance 2000
- Miami-Dade County Bicycle and Pedestrian
Facility Maintenance Program 2008
- Miami-Dade County Grade Separation Feasibility
Study 2004
- Miami-Dade County Typical Roadway Section
and Zoned Right-of-Way Update Study 2007
- Miami-Dade Freight Plan 2007
- Miracle Mile Traffic Circulator Study 1993
- Mobility Management Process/Congestion Management
System 1996
- Model Validation to Cube Voyager 2007
- Modeling Support for Near Term Transportation
Improvements Study 2010
- Near-Term Plan for Improved Transportation
Services Study 2010
- North Dade Greenways Master Plan 1997
- North Miami Community Transit Circulator Study
2000
- North Ponce de Leon Boulevard Median Evaluation
2002
- Northeast Corridor Traffic Flow Implementation
Plan Study 2008
- Northeast Miami-Dade Traffic Flow Study 2006
- NW 7th Avenue Traffic and Pedestrians Study 2009
- NW/NE 36th Street Study 2006
- On the Waterfront: Implementation Plan to
Finish 15 Mile 2011
- Opa-Locka Circulator/Transit Improvement
Feasibility Study 2008
- Origin Destination Study for the 95 Express 2010
- Palmetto Bay Transportation Master Plan Study 2004
- Palmetto Corridor Light Rail Transit Feasibility
Study 1996
- Pedestrian Safety Around High Risk Schools Study
2010
- Pedestrian/Bicycle Safety Study 2007
- Port of Miami City Street Improvements 2000
- Port of Miami Freight Access Study 2006
- Post Hurricane Short Range Transportation Study
1995
- Public Involvement Effectiveness Evaluation Program
2001
- Rail Convertibility Study 2003
- Railroad Rights-Of-Way Assessment Study 1993
- Regional Freight Plan 2008
- Regional Long Range Transportation Plan 2007
- Safe Routes to Parks Study 2009
- Safe Routes to School Online Map System Pilot
Program 2009
- Safe Routes to School Program Study 2003
- Safe Routes to School Program Study 2006
- Safe Routes to School Program Study 2007
- Senior High School Student Safety Campaign 2008
- School Zone Traffic Congestion Study 2002
- Service Enhancements to the Hialeah Transit System
2007
- Short Range Truck Traffic Study for the Airport
West Area 2002
- Simulation and Analysis of Potential Mass
Evacuation of Miami-Dade Residents 2006
- Snake Creek Bike Trail Planning and Feasibility
Study 2004
- Snapper Creek Park & Ride Feasibility Study 1998
- Snapper Creek Trail Segment A Planning Study 2007
- Sociocultural Effects Program 2003
- South Beach Bicycle and Pedestrian Study 1994
- South Dade Greenway Network Master Plan 1994
- South Dade Managed Lanes 2007
- South Florida Clean Energy and Greenhouse Gas
Emission Reduction Program 2009
- South Link (South Miami-Dade Transit Corridor Study
2004)
- Special Use Lane Study 2004
- Special Use Lanes Study: Transit Use of
Shoulder By-Pass Lanes 2005
- SR-826 and Biscayne Boulevard Pedestrian &
Bicycle Safety Study 2007
- Strategies for Integration of Sustainability and
the Transportation System 2010
- Superarterial Network Study 1996
- SW 152nd Street Corridor Transportation Study
2007
- Town of Cutler Bay Transportation Master Plan 2008
- Town of Medley NW 116th Way Corridor Study
2009
- Town of Medley NW South River Drive Corridor
Study 2003
- Town of Medley NW South River Drive Corridor
Area Expansion Study 2005
- Town of Medley Transit Circulator Services
Implementation Study 2005
- Town of Miami Lakes Transportation Master Plan
2004
- Traffic Calming for Pedestrians at Miami-Dade
Community College Wolfson Campus Study 2003
- Traffic Safety Plan for Elderly Pedestrians in
Miami-Dade County 2010
- Traffic Signs Research Study for Miami-Dade
County 2006
- Transit Center Connections Study 2003
- Transit Contraflow Feasibility Study 2002
- Transit Corridors Transitional Study 1994
- Transit Hub Evaluation Study 2008
- Transit On-Board Survey 2008
- Transit Oriented Development Master Plans for
Exclusive Busway Corridors Study 2003
- Transit Service Evaluation Study 2009
- Transportation and Economic Impact Analysis for
Freight Industry 2010
- Transportation Data Management System (TDMS) 2001
- Transportation Demands of the 21st Century 2007
- Transportation Financial Analyses and Assessments
Study 1997
- Transportation System Hurricane Emergency
Preparedness Plan 1995
- Transportation System Performance Monitoring 2007
- Trends in Heavy Truck Traffic Management Study
2003
- Truck Route System for Miami-Dade County 2006
- Update of the Miami-Dade County GIS Crash Data
System 2009
- US-1 Intersection Improvements Study 2007
- US-1 Reversible Flow Lane Study 2006
- US-1/SR-878 Intersection Sub-Area Traffic
Study 2009
- Vanpool Demonstration Program 1996
- Village of Palmetto Bay Bicycle and Pedestrian
Master Plan 2008
- Village of Palmetto Bay Safe Routes to School
Program Study 2009
- Village of Pinecrest Safe Routes to School Study
2010
- Web-based Bicycle Route Planning Tool 2010
- Welfare to Work: Transportation Issues and
Opportunities in Miami-Dade County 1998
- West Flagler Street Corridor Study 1997
- Westchester Traffic Impact Study 2007
List of Transportation Studies. (Next 212 items listed
alphabetically below have
links to Adobe PDF documents, web pages and/or websites.)
- 79th Street Corridor Neighborhood Initiative 2002
- Also called 79th Street Corridor
Redevelopment Plan or 79th Street Corridor Urban Study. To transform the
portion of the 79th Street between NW 22nd Avenue and NW 42nd Avenue into a
cohesive neighborhood. This includes a mixed-use transit oriented
development, dedicated bus facilities, a kiss-and-ride facility, parking and
the relocation of the
Amtrak station, and a redevelopment of the Northside Shopping Center.
The work was directed by the 79th Street Corridor Neighborhood Initiative, a
partnership of non-profit economic development agencies. Started September 2002 and completed December 2003.
Work by Zyscovich, Inc. Download the
Transportation Analysis Draft Report (September 6, 2002),
Final Report (December 2003) and
Presentation (October 2005). Contact
Susan Schreiber at 305-375-1887
for complete details.
- 107th Avenue Pedestrian and Transit Greenways Corridor Study 2002
- Explore the construction of a pedestrian transit greenway along 107th avenue
from Flagler Street to SW 8th Street, in the
City of Sweetwater. Started December 2002 and completed
August 2003. Work by Florida International
University. Download the
Final Report. Contact David Henderson
at 305-375-1647 for complete details.
- 137th Avenue Corridor Study 2005 - Feasibility of making SW 137th Avenue
into a major north/south corridor between the
City of Homestead and central
Miami-Dade County. Started in 2005 and
completed June 2007. Work by The
Corradino Group. Download the
Executive Summary (2007) and
Final Report (June 2007). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Access to SW 137th Avenue to and from SR 874
Study - Feasibility of creating a connection between SW 137th Avenue and
State Road 874 also known as the Don Shula Expressway. Work by
Kimley-Horn & Associates.
Download the
Executive Summary (April 2002) and
Final Report (April 2002). Contact
Jesus Guerra at 305-375-2069 for complete details.
- Adding Turbo Lanes to T-Intersections Study 2009
- The objective of this study is to evaluate T-intersections that can be
converted to turbo lanes within the county boundaries. Started May 2009 and
completed March 2010. Work by David
Plummer & Associates. The budgeted cost is approximately $83,000
including 10% for contingencies. Download the
Executive Summary (May 2010),
Final Report (May 2010),
Appendices (May 2010), and
Presentation (May 2, 2010). Contact
Jesus Guerra at 305-375-2069 for complete details.
- Aesthetic Guidelines for Transportation Projects
in Miami-Dade County 2009 - Develop a set of countywide
aesthetic guidelines and best practices to assist transportation agencies,
project managers and consultants, as to how aesthetics can be incorporated
into transportation projects. Started March 2010. Expected
completion was December 2010. Work by HTNB.
The approximate cost is $64,931. Download the
Action Plan (November 2011).
Contact Susan Schreiber
at 305-375-1887 for complete details.
- Arterial Grid Network Analysis 2006 - Intended to
determine whether improvements could be made to the grid system as a
long-term traffic congestion relief measure, rather than stop-gap
improvements that may slightly improve traffic flow in one corridor while
potentially “shifting” the problem to a different corridor. Started April 2006 and completed March 2007. Work by
Kimley-Horn & Associates.
Download the
Executive Summary (March 2007),
Final Report (March 2007), and
Presentation (2007). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Arterial Investment Study: 107th Avenue - In conjunction with
FDOT, a pilot Arterial Investment
Study for SW/NW 107th Avenue was conducted to evaluate multimodal solutions.
This study was considered as a pre-PD&E study, which resulted in a wide
range of recommendations. Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for complete details.
- Automated Bicycle Rental System and Parking Plan
2009 - This study will evaluate the feasibility of implementing
a self-service bicycle rental system and a bicycle parking transit center.
The scope of work also includes development of uniform design standards for
bicycle racks. Started December 2009 and completed November 2011. Work by Kimley-Horn &
Associates. The budgeted cost is $55,000. Download the
Automated Bicycle Rental and Parking Plan 2011. Contact
David Henderson at 305-375-1647
for complete details.
- Bay Link (Miami-Miami Beach Transportation Corridor Study 2002)
- This
would study a double tracked, street-level light rail alignment that would
serve downtown Miami, Watson Island, and the southern portion of Miami
Beach. Two rounds of public meetings (each) were held separately in
Miami and
Miami Beach. One to outline the
system and the other to get comments and concerns. Completed August 2004. Work by
Parsons Brinckerhoff. Download the
Presentation to the MPO (July 29, 2004). RESULTS: Systems planning was
completed October 2002. Alternatives Analysis/Draft Environmental Impact
Statement was done May 2003. A Locally Preferred Alternative (LPA) was
adopted by the MPO on September 26, 2003. And PE/Final Environmental Impact
Statement was completed August 2004. Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Bicycle/Pedestrian Mobility Plan for the Miami Downtown Development
Authority 2009 - This study will analyze existing street conditions,
traffic crash data, pedestrians and bicyclist counts and a user survey to
recommended improvements and implement strategies for improving walking and
bicycling conditions within Miami's
Downtown Development Authority (DDA) area. Started December 2009. Scheduled completion was
September 2010. Work by Kimley-Horn
& Associates. The budgeted cost is approximately $60,000. Download
the
Final Report (March 2011). Contact
David Henderson at 305-375-1647
for complete details.
- Bicycle/Pedestrian Plan Update 2007 - This will
prepare an update to the MPO’s Bicycle and Pedestrian plans including a
vision, measurable goals and objectives, long range element and short range
element. Topics include on- and off-road networks, prioritized pavement and
trail projects, bike parking, Bike & Ride, safe routes to school, municipal
coordination, encouragement and safety. Started in
September 2007 and completed October 2008. Work by
Gannett Fleming. The budgeted
cost was $98,711. Download the
Final Report (April 23, 2009). Contact
David Henderson at 305-375-1647 for complete details.
- Bicycle and Pedestrian Traffic Count Program 2006
- Provide information on the current usage of bicycling and walking at
selected locations around the county for use in identifying and prioritizing
improvements, performing “before-and-after” evaluations of programs and
facilities and provide a baseline to monitor long-term trends. Started August 2006 and completed May 2008. by
David Plummer & Associates. The
approximate cost was $64,075. Download the
Report (May 2008). Contact
David Henderson at 305-375-1647
for complete details.
- Bicycle Boulevard Planning Study 2009 - This
study will look at ways to improve conditions for bicycling through the
development of “bicycle boulevards” within the county. Started December
2008 and completed October 2009. Work by
Kimley-Horn & Associates. The
budgeted cost was $85,000. Download the
Final Report (December 2009) and
Field Review (April 2010). Contact
David Henderson at 305-375-1647 for complete details.
- Bicycle Facilities Plan 1997 The plan examined
existing roadway conditions relating to bicycle travel and proposed a set of
improvements of both on- and off-road facilities to incorporate into the
TIP. Completed in 1997. Work by Barton-Aschman Associates.
Download the
Executive Summary (1997). (SkyDrive)Contact
David Henderson at 305-375-1647
for complete details.
- Bicycle Parking Plan for Miami-Dade Transit 2002
- The purpose of this
study was to develop recommendations for new and improved bicycle parking
facilities at Miami-Dade
Transit
Metrorail stations, park-and-ride lots and other transit hubs. Started in 2002. Work by by
Center for Urban Transportation Research
(CUTR) of the University of South Florida.
Download the
Final Report (2002) and
Presentation (2002). RESULTS: Phase 1 racks installed in 2006 (Dadeland
South – Earlington Heights
Metrorail
Stations). Phase 2 racks (Brownsville-Palmetto Stations and other
transit hubs) to be installed in Fall, 2008. Phase 3 (bike locker
replacement in Winter, 2009). Contact
David Henderson at 305-375-1647
for complete details.
- Bicycle Project Feasibility Evaluation 2003 -
This study (Work Order No. GPC11-02) was to evaluate seven high-priority
bicycle project through Miami-Dade County: the Commodore, Bird Road, NW 11th
Street, Palm Avenue, Red Road, North Federal Highway, and M-Path trails. Started August 2003 and completed March 2004. Work by
Kimley-Horn & Associates.
Download the
Final Report (November 2003). RESULTS: Under design. $1 million
programmed for design and construction in fiscal years 2008-2010 (GOB #127).
Public workshop on design scheduled for 6/30. Contact
David Henderson at 305-375-1647
for complete details.
- Bicycle Safety Education Program 2009 - Through this project staff from
the University of Miami's
Miller School of Medicine will
develop, evaluate and implement on-going and effective bicycle safety
education programs for middle school children and adults in cooperation with
Miami-Dade Park and Recreation. Started November 2009 and completed
August 2010. Work by University of Miami
and Miami-Dade Park and Recreation.
The budgeted cost is approximately $50,000. Download the
Final Report (October 2010). Contact David Henderson
at 305-375-1647 for complete details.
- Bicycle Safety Program Plan 2005 - This study used Pedestrian and Bicycle
Crash Analysis Tool (PBCAT) software developed for the
Federal Highway Administration (FHWA)
to identify common crash types occurring at locations throughout the County
and develop countermeasures to address the same. Completed March 2006. Work by
Cambridge Systematics. Download the
Executive Summary (March 2006) and
Final Report (March 2006). RESULTS: "Share the Road" and "Steer Clear"
public information material distributed. Washington Ave shared-use lane
marking evaluation underway by Miami
Beach. Contact
David Henderson at 305-375-1647
for complete details.
- Bikes-on-Bus Service Delivery in Dade County Study 1995
- The purpose of this study was to determine how a bike-on-bus program for
Dade County can enhance transit service and to identify ways to make such a
program successful and efficient. Please
visit our office to view or receive a copy of the report. Contact
David Henderson at 305-375-1647 for complete details.
- Black Creek Trail Segment B Study 2006 -
Complete a feasibility and planning study to develop a single non-motorized
multi-use trail and linear park for "Segment B" within the right-of-way
along Black Creek Canal. Started August 2006 and completed October
2007. Work by Kimley-Horn &
Associates. The approximate cost was $56,000. Download the
Executive Summary (October 2007) and
Final Report (October 2007). RESULTS: $900,000 programmed for
construction in fiscal year 2011 (FM #4209161). Contact David Henderson
at 305-375-1647 for complete details.
- Bus Rapid Transit Opportunities Study 2003 -
This project will explore the potential for implementing relatively low-cost
BRT service in the major and secondary corridors and arterial streets that
are anticipated to have substantial bus service in place, and to identify
the most feasible types of BRT improvements that can be made. Started October 2003 and completed March 2005. Work by
the Center for Urban Transportation
Research (CUTR). Download the
Technical Memorandum No. 1 (October 2004),
Technical Memorandum No. 2 (February 2005), and
Technical Memorandum No. 3 (April 2005). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Bus-on-Shoulder Service Evaluation Study 2007 -
This study will evaluate the operation of the “Bus on Shoulder” pilot
project implemented along SR-874 (Don Shula Expressway) and SR-878 (Snapper
Creek Expressway). Started September 2007 and completed January 2009. Work by
Parson Transportation Group. The approximate cost was $70,000. Download the
Executive Summary (January 2009) and
Final Report (January 2009). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Central Dade Transport Zone Study 2007 - This study looks at upgrading the
infrastructure along the Miami River,
Miami International Airport, the
FEC Rail Yard, the Warehouse District,
the Free-Trade Zone and look at expansion of road facilities throughout the
district. Started September 2007 and completion
August 2008. Work by Kimley-Horn &
Associates. The approximately cost was $80,000. Download the
Executive Summary (August 2008) and
Final Report (August 2008). Contact Larry Foutz
at 305-375-1522 for complete details.
- Citizen's Guide to Transportation 2004 (also known as Pocket Guide)
- Created by FIU Metropolitan Center.
“On the Move... Miami-Dade County’s Pocket Guide to Transportation” is the
citizen's guide that provides transportation information to transit
services, various highway services, bikes on trains and buses, greenways,
ParaTransit and small mass transit services including vanpools, taxis,
airport shuttles, carpooling, etc., and the ports. Download the
Pocket Guide. Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- Citizen's Guide to Transportation 2007 (also known as Pocket Guide)
- Created by FIU Metropolitan Center.
“On the Move... Miami-Dade County’s Pocket Guide to Transportation” is the
citizen's guide that provides transportation information to transit
services, various highway services, bikes on trains and buses, greenways,
ParaTransit and small mass transit services including vanpools, taxis,
airport shuttles, carpooling, etc., and the ports. Download the
Pocket Guide, the
Spanish Edition, and the
Haitian Creole Edition. Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- City of Aventura Municipal Transit Study 1998 - The objective was to
implement a municipal public transit system to serve it's 3.2 square mile
area which was previously serviced by
Miami-Dade Transit,
Broward County
Transit, and private shuttle systems. The study would recommend a system
with universal access to all residents of the
City of Aventura. Completed in 1998. Work by
Bermello Ajamil & Partners, Inc.
Download the
Final Report (June 1998). (SkyDrive) Contact
Oscar Camejo at 305-375-1837 for
complete details.
- City of Coral Gables Circulator System Study 1996
- Investigate the
feasibility of a transit circulator along Ponce de Leon Boulevard corridor
which would provide connectivity to the Downtown/Miracle Mile area, SW 8th
Street, and the
Metrorail. Completed in 2001. Work by
David Plummer & Associates. Download
the
Report (May 2001). Contact Larry Foutz
at 305-375-1522 for complete details.
- City of Doral Transportation Master Plan 2005 - This report identified
existing and future multi-modal transportation deficiencies and establish a
program of transportation improvements in the
City of Doral. Started March 2005 and completed May 2007. Work by the
The Corradino Group. Download the
Executive Summary (May 2007) and
Final Report (May 2007). Contact
Oscar Camejo at 305-375-1837 for
complete details.
- City of Doral Transportation Master Plan Update 2009
- To study the
existing and future conditions of the transportation system within the
City of Doral, including the
roadway network, the transit system, the pedestrian and bicycle network and
to determine how each interacts with the existing and future land uses. Started in February 2010 and completed August 2010.
Work by the City of Doral.
Budgeted cost at $40,000. (Includes an MPO award of $40,000 and
Doral's contribution of $66,000.)
Download the
Plan Update (2010). Contact Oscar Camejo
at 305-375-1837 for complete details.
- City of Hialeah Circulator Study 1997 - The objective of this study was to
explore the feasibility of implementing a local bus service for the
City of Hialeah. The service would
be coordinated with other public transportation providers in the area.
Additionally, the study included available funding sources to implement the
service. Download the
Final Report, October 1998. (SkyDrive) Contact Larry Foutz
at 305-375-1522 for complete details.
- City of Homestead Downtown Area Transportation Plan Update 2003
- Updates
the 1997 Homestead Traffic and Mobility Study, to resolve numerous
transportation planning issues in
Homestead's congested urban core. Specific measures to alleviate
congestion have been recommended, but consensus has not been reached on
methods of traffic calming, location for truck routes within the historic
district, and bicycle lane placement vs. parking needs. Also, new
transportation planning projects such as the Urban Transit Village and the
new busway stop locations need to be incorporated in the existing plan. Started November 2003 and completed
December 2005. Please
visit our office to view or receive a copy of this report. Contact Larry Foutz
at 305-375-1522 for complete details.
- City of Miami Beach Municipal Mobility Plan 1998
- The establishment of a
transportation master plan for the
City of Miami Beach. Completed December 1998. Work by
The Corradino Group. Download the
Executive Summary and
Vision Statement. (SkyDrive) Contact Amelia Lopes-Johnson,
City of Miami Beach, at
305.673.7550 for complete details.
- City of Miami Car-Sharing Feasibility Study 2009
- Also known as the Feasibility Study to Implement Car-Sharing Programs.
Evaluate the feasibility of implementing a car sharing program in the
City of Miami,
identify the benefits and the costs to the community. Started March 2010 and
completed July 2011.Work by the
City of Miami. The
approximate cost is $25,000. Download the
Final Report (September 2011) and
Presentation (September 2011).Contact
Thomas Rodrigues at
305.416.1020 or Lilia I. Medina
at 305.416.1080 for complete details.
- City of Miami Gardens Transportation Master Plan 2004
- This study will
develop Miami Gardens' first
transportation master plan as part of their Comprehensive Development Master
Plan. Completed March 2006. Work by
The Corradino Group. Download the
Executive Summary (April 2006) and
Full Report (May 2006). Contact Larry Foutz
at 305-375-1522 for complete details.
- City of Miami Health District Bicycle and
Pedestrian Mobility Study 2011 - PENDING. A description for this study
is forthcoming. Contact project manager below for information. Started
January 2011. Scheduled completion is January 2012. Work by the
City of Miami. The budget is
approximately $48,000. STATUS: 90% complete. (September 2010) Contact
Larry Foutz at 305-375-1522 for
complete details.
- City of Miami Springs 36th Street District Traffic Impact Study 2008
- Analyze impacts on traffic in
Miami Springs along NW 36th Street. Study schedule to be determined. Started January 2009 and completed
December 2009. Work by David Plummer &
Associates, for the City of
Miami Springs. The budgeted cost was approximately $20,000. Download the
Final Report (April 2009). Contact Wilson Fernandez
at 305-375-1886 for complete details.
- City of Miami Springs Traffic Circulation and Parking Study for Westward
Drive 2010 - ONGOING . To perform a traffic circulation and parking
analysis to support the City of
Miami Spring’s initiative of revitalization and renewal of its downtown
commercial core. The analysis will include examination of collecting
current conditions data, assessment of vehicular, bicycle and pedestrian
conflicts, identification of deficiencies and evaluate potential
improvements. Started January 2011 and scheduled to complete January 2012. Work by the City of Miami
Springs. The budget is approximately $16,000. STATUS: Awaiting final
report. (September 2011) Contact
Wilson Fernandez at 305-375-1886
for complete details.
- City of North Miami Beach Community Mobility Program 2002
- A logical
extension of the S.R. 826 Study and City Center Design Charrettes. It
defines relationships between previous studies and provides a detailed work
program for implementation. Work done by
Chatterton Consulting. Download the
Final Report (2003), and
Project Bank and Work Plan (2003). Contact
Jesus Guerra at 305-375-2069 for complete details.
- City of North Miami Beach Fulford City Center Geometric Roadway Design
Study 2003 - A look at creating a town center environment in an area called Fulford City Center within the
City of North Miami Beach. Started April 2003 and
completed May 2004. Work by Glatting
Jackson Kercher Anglin Lopez Rinehart, Inc. Download the
Final Report (April 2003). Contact
Larry Foutz at 305-375-1522 for complete details.
- City of North Miami Beach Pedestrian & Bicycle Safety Analysis Study
2004 - This study lays the groundwork for a network of trails and bikeways in
North Miami Beach,
including the existing Snake Creek Trail. Studied from March 2004 to December 2004. Work by
Dover, Kohl and Partners (under
contract to the City of North
Miami Beach). Download the
Final Report (December 20, 2004). Contact
David Henderson at 305-375-1647
for complete details.
- City of North Miami Bike, Park and Ride Study 2007
- Formerly called North Miami Bicycle Parking and Transit Circulator
Feasibility Study. This will complete a comprehensive bicycle planning and
transit circulator feasibility study to provide better bicycle facilities
and identify strategies that will create greater connectivity between
bicycle and public transit systems. Started October 2007 and completed June
2009. Work by the City of North Miami
and Kimley-Horn & Associates.
The approximate cost was $55,258 as part of the
Municipal Grant Program. Download the
Final Report (June 2009) and
Presentation (June 2009). Contact David Henderson
at 305-375-1647 for complete details.
- City of South Miami Hometown Intermodal Transportation Study 2002
- Reevaluate earlier transit-related studies concerning the
City of South Miami central
business district and immediate surrounding area (Hometown District) and
develop a multimodal mobility plan. Completed in August 2002. Work by
Kimley-Horn & Associates.
Download the
Executive Summary (2002) and
Final Report (August 2002). Contact
Susan Schreiber at 305-375-1887
for complete details.
- City of South Miami Trolley/Circulator Feasibility Study 2006
- Develop a
plan for the establishment of a pilot service program that would integrate
the City of South Miami's
trolley service with other area shuttle and trolley services. Started August 2006 and completed August 2007. Work by
Parsons Transportation Group. The
approximate cost was $75,000. Download the
Executive Report (August 2007)
and
Final Report (August 2007).Contact
Larry Foutz at 305-375-1522 for
complete details.
- City of South Miami US-1 Pedestrian Overpass Study 2000
- Completed by
McHarry Associates. Investigate and
document the potential locations and configurations for a pedestrian
overpass across US-1 (South Dixie Highway). Download the
Report. (SkyDrive) Contact
David Henderson at 305-375-1647
for complete details.
- City of Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway Study
2003 - Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway on North
Bay Road at NE 172 Street. Studied from December
2003 to December 2004. Work by
Calvin Giordano & Associates (under contract with the
City of Sunny Isles Beach). Download the
Final Report (September 2004). Contact David
Henderson at 305-375-1647 for complete details.
- Civic Center TMO Commuter Characteristics Study
1994 - This study's main purpose was to investigate current pedestrian
activities within the Civic Center area and to develop a Pedestrian
Amenities Plan. This plan included safety issues that were also addressed in
the plan. Completed in December 1997. Work by
Center for Urban Transportation Research
(CUTR) of the University of South Florida.
Download the
Executive Summary and
Final Report. (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Civic Center TMO Pedestrian Amenities and Safety
Study - To identify travel characteristics of employees, students, and
visitors in the Civic Center area, locate transportation facilities within
the area, develop a commuter characteristics data file, and prepare an
action plan to implement short and long term TDM strategies. Work by Barton-Aschman Associates. Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Coastal Communities Transportation Master Plan 2006
- Produce short-, mid- and long-term multimodal solutions to transportation
issues to the barrier island communities. Study the existing and future
sub-regional transportation network through data collection, analysis and
public involvement. Develop a multimodal list of projects and costs
estimates. Prioritize projects into an implementable 10-year plan. Started February 2006 and completed June 2007. The final
cost was $111,546. Download the
Final Report (August 2007). Contact
Wilson Fernandez at 305-375-1886
for more details.
- Coconut Grove Planning Study 1996 - For the
development of a master plan for the Coconut Grove area which preserves the
historical background of this community, reduce the negative impact of
traffic flow, improve parking conditions and enhance the landscaping of the
area. A review of land use policy and regulations is also included. Started April 1996 and completed October 1997. Work by
Andres Duany and Elizabeth Plater-Zybeck, Architects, Inc.; Carr Smith and
Associates; etc. Please
visit our office to view or receive a copy of this report. Contact
Larry Foutz at 305-375-1522 for
complete details.
- Compare Transit Survey Results Study 2010 - To
present the analysis of the Metrorail survey results in terms of riders'
trip making characteristics and the spatial distribution of Metrorail trips
in the region. Started February 2010 and completed September 2010. Work
by Gannett Fleming. The budget
is $79,832. Download the
Final Report (September 30, 2010). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Comprehensive Parking Study for Freight
Transport in Miami-Dade County Study 2009 - This study will look at the
provision of overnight parking for long-haul truckers and for locals
independent truckers who need a location to store their trucks when not in
use. Started December 2009 and completed September 2010. Work
by Marlin Engineering. The
budgeted cost is approximately $65,000. Download the
Final Report (September 30, 2010). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Community Characteristics Project Phase V 2008 -
This involves the creation of a web-based application that enables
transportation planners and public involvement offices (PIOs) to create an
effective PI program and accomplish stated Title VI goals that will
ultimately allow the identification of the attitudes and issues facing that
particular community. Started January 2008 and completed
January 2009. Work by Florida International
University. The approximate cost was $60,000. RESULTS:
Miami-Dade Transportation and Community
Mapping website. Contact Elizabeth Rockwell
at 305-375-1881 for complete details.
- Community Characteristics Project Phase VI 2009
- The objective is to review the social, economic, and geographic
characteristics of an area before public involvement (PI) outreach is
initiated. The next cycle (phase) will be called Integrated Transportation
Information System 2009. Started January 2009. Expected completion in March
2010. Work by Florida International University.
The approximate cost is $63,000. Download the
Scope of Services 2006-07. RESULTS: A
ITIS website was developed to
replace the Miami-Dade Transportation
and Community Mapping website. Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- Congestion Intersection Improvement Study Phase II
2006 - Evaluate congested intersections and recommend short-term traffic
operational improvements for alleviating traffic congestion. Started August 2006 and completed March 2008. Work by
David Plummer & Associates. The
approximate cost was $97,900. Download the
Executive Summary (March 2008),
Volume I (March 2008),
Volume II (March 2008), and the
Presentation (March 2008). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Congestion Management Process (CMP) Update 2009 - This study will update
the Congestion Management System (CMS) to reflect the new Federal
requirement established under
SAFETEA-LU. This
update will be incorporated in the 2035 LRTP, as a planning tool, as
recommended in the 2007 Miami-Dade MPO Federal Certification. Started September 2008 and completed November 2009. Work
by Gannett Fleming. The
approximate cost is $79,439. Download the
Executive Summary (October 2009) and
Final Report (October 2009). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Congestion Management System Update Study 2003 - This updates the CMS/MMP.
It also establishes a Study Advisory Committee and web-based nationwide
research regarding activities conducted in other cities to alleviate traffic
congestion. Based on these findings,
Kimley-Horn developed criteria
to determine the congested corridors within the county, and identified
strategies to improve mobility there. Started October 2003 and completed November 2004. Work by
Kimley-Horn & Associates.
Download the
Final Report (November 2004). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Coral Gables Trolley Route Expansion Study 2005
- Assess the feasibility
of routes that connect the Coral
Gables Trolley to the Flagler Street corridor, the MacFarlane
Homestead Historic District,
the University of Miami, and the Riviera Business District. And identify
preliminary trolley stops/spacing. Completed in early 2006. Work by
David Plummer & Associates. Download
the
Executive Summary (2006),
Feasibility Report (March 2006), and
Presentation (2006). Contact
Irma San Roman at 305-375-4507 for
complete details.
- Countywide High-Crash Location Safety Study 2009
- Identify traffic safety concerns and recommend countermeasures to improve
the operational safety of twenty high-crash locations county wide. Started March 2010. Scheduled completion is February
2011. Work by Miami-Dade Public
Works. The budgeted cost is approximately $75,000. Download the
Final Report (February 2011) and
Appendices (February 2011). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Countywide Park and Ride Facilities Study 2009 -
Also known as Miami-Dade Countywide Consolidated Park-and-Ride Facilities
Plan. Examine planned and future Park & Ride facilities at express and
priority transit lines. Started January 2010 and completed October 2010. Work
by David Plummer & Associates. The
budgeted cost is $35,000. Download the
Final Report (October 2010). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Countywide Parking Policy Study for Miami-Dade
County 1999 - This phase is a very comprehensive study which includes a
set of recommended parking policies and strategies by area of action, from
coordination to enforcement. Completed in August 1999. Work by Barton-Aschman
Associates, Inc; Parsons Transportation
Group. Download the
Executive Summary (October 1999) and
Final Report (August 1999). (SkyDrive) Contact Jesus Guerra
at 305-375-2069 for complete details.
- Countywide Traffic Safety Program 2008 - ONGOING.
To adopt a GIS-based, countywide crash data system that will allow traffic
engineers to analyze crashes on all county roads to determine priority
locations and predominant crash types to identify appropriate engineering
solutions. The system will allow users to identify and map the high crash
locations based on aggregation of crashes to intersection and street
segments using crash counts, rates and severity index. In addition, the
system will provide diagrams, tables, charts and summarized reports. Started January 2008. Expected completion was December
2008. Work by the University of Florida.
The budgeted cost is approximately $100,000. Contact
David Henderson at 305-375-1647
for complete details.
- CSX Corridor Evaluation Study 2008 - This study
will evaluate the feasibility of re-directing rail freight traffic outside
the urbanized Kendall area and examine various concepts to introduce rapid
transit service along the CSX rail corridors south of the Oleander Junction. Started July 2008 and completed June 2010. Work by
Parsons Transportation Group.
The cost was approximately $138,500. Download the
Final Report (August 2009) and
Presentation (January 27, 2009). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Curtiss Parkway/NW 36 Street Traffic Study 2005
- A study to assess the
impact on traffic flow at the intersection of Curtiss Parkway and NW 36th
Street that would be caused by the
City of Miami Springs' proposed redevelopment of that area. Started December 2005 and completed May 2006. Work by
David Plummer & Associates. Download
the
Final Report (May 2006). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Cutler Bay Town-Wide Bicycle and Pedestrian Master Plan 2010
- Create a vision for non-motorized transportation within of
Town of Cutler Bay and develop
projects or policies and performance measures to accomplish that vision. The
report developed will serve as the non-motorized component of
Cutler Bay's transportation and
capital improvement elements to its Growth Management Plan (comprehensive
plan). Started January 2011 and completed August 2011. Work to be performed by the
Town of Cutler Bay. The cost is approximately $40,000.
Download the Master Plan (August 2011). Contact Oscar Camejo at 305-375-1837
for complete details.
- Dadeland Regional Activity Center Study 1997 - The objective of this study
is to develop a set of planning activities to be implemented for improving
mobility in the Dadeland Regional Activity Center area. Download the
Improving Mobility Report (September 1996) and
Implementation Measure Report (September 1998). (SkyDrive) Contact
Susan Schreiber at 305-375-1887
for complete details.
- Develop Procedures and Criteria for Establishing School Crossing Guard
Locations 2010 - ONGOING. Develop a tool to assist local police
departments to objectively rank locations for crossing guards around schools
based on factors such as the characteristics of roadways, traffic and the
student population. Started August 2011. Completion date set in 2012. Work
by HTNB. The approximate
cost was $89,989. STATUS: 25% completed. (September 2011) Contact
David Henderson at 305-375-1647
for complete details.
- Development of a Service Plan for Waterborne Transportation Services in
Miami-Dade County 2004 - This study would develop a water transit service plan
that would offer alternatives to local commuters driving single occupant
private automobiles, and provide viable and attractive mobility options for
visitors. Contact Jesus Guerra at
305-375-2069 for complete details. Completed January 2005. Work by
Kimley-Horn & Associates.
Download the
Executive Summary (2005),
Final Report (December 2004),
Presentation (2005) RESULTS:
Water Transit Service Executive Summary Report (March 2007).
- Doral Circulator Study 2006 - Examined potential circulator transit in the
City of Doral by examining the
existing service, the population demographics of income and transit
dependency, as well as potential user groups. Started July 2006 and completed June 2007. Work by
The Corradino Group. The approximate
cost was $34,800. Download the
Final Report (May 2007). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Downtown Kendall Transportation Study 2002 - This study provides the
Miami-Dade Planning & Zoning
Department with documented information on the transportation related
impacts associated with modifying roads in the Downtown Kendall Urban Center
District. Work by
Gannett Fleming. Please
visit our office to view or receive a copy of this report. Contact Carlos Roa
at 305-375-4507 for complete details.
- East West Corridor Study - The East-West Corridor is a multimodal solution
for severe traffic congestion along SR 836, the only east-west expressway in
central Miami-Dade County. The project combines highway and transit
improvements, running along SR 836 and connecting the
Florida International University, the
Miami Intermodal Center (MIC), downtown
Miami and the
Port of Miami. The
estimated cost is $1.7 billion. Download the
Airport Area Multimodal Access Study Executive Summary (1992) and
Final Report (1992). (SkyDrive) RESULTS: Construction began January 2003
on the MIC or Orange Line Phase 1 by
Earth Tech. Tentative completion is May 2011. Preliminary engineering for
the Orange Line Phase 3 has begun. Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Economic Impact of Parking Policy Options 1986 - Conducted for the
Miami Downtown Development Authority's
Parking Task Force to present a summary evaluation of the economic impact of
recommended parking policy alternatives for downtown
Miami. Completed October 1986. Work by
Zuchelli, Hunter & Associates. Download
the
Final Report (October 1986). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Effects of Transportation Plan Development on Minority and Impoverished
Urban Communities 1998 - Conducted for the
University of South Florida (USF) to determine the effects of the
transportation plan on minorities and impoverished urban communities. Work by Beverly G. Ward and Eric T. Hill.
Download the
Final Report (June 30, 1998). (SkyDrive) Contact Elizabeth Rockwell
at 305-375-1881 for complete details.
- Electric Transit Circulator Feasibility Study 2000
- Explored possibilities and problems of implementing local transit
circulators that would run on electric or hybrid-electric vehicles. Started in 2000 and completed June 2001. Work by the
Center for Urban Transportation Research
(CUTR). Download the
Final Report (June 2001) and
Presentation (2001). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Electrowave Shuttle Report 1998 - This study summarized the activities and
results of the ELECTROWAVE shuttle service implemented in the
Miami Beach area during 1998. Please
visit our office to view or receive a copy of this report. Contact Judy
Evans, Miami Beach TMA Executive Director, at 305.535.9160 for complete
details.
- Evaluation of Current Methodology to Determine Traffic Concurrency 2010
- ONGOING. The purpose of this study is to assess the current methodology
and recommend a preferred transportation concurrency management system for
Miami-Dade County. Started August 2011. Completion date set in 2012. Work by
Jacobs Engineering. The budget is approximately $65,000.
STATUS: 10% complete. (September 2011) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Feasibility of Implementing Tech Centers in Miami-Dade County 2004
- The objective was to assess the feasibility of implementing technology
centers to alleviate traffic congestion as an alternative means of
maximizing the efficient use and capacity of limited transportation
recourses. Completed in July 2006. Work by the
Center for Urban Transportation Research
(CUTR). Download the
Executive Summary (July 13, 2006) and
Final Report (July 13, 2006). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Feasibility of Utilizing Miami-Dade County Waterways for Urban Commuter
Travel 2002 - This study assesses the feasibility of using the existing
waterways within the Urban Growth Boundary of Miami-Dade County for commuter
travel. Completed January 2003. Work by
Gannett Fleming. Download the
Final Report (January 8, 2003). Contact David Henderson
at 305-375-1647 for complete details.
- Feasibility Study: A Public-Private Partnership for Transit Vehicle
Purchasing and Leasing 1998 - Determine the feasibility of using
Miami-Dade Expressway Authority (MDX)
funds to serve as the local match for federal grants to purchase small
transit vehicles. These vehicles would then be leased to private or public
sector operators to provide additional public transit services that would
complement existing transit services. Started in 1998 and completed January 1999. Download the
Report (January 1999). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for
complete details.
- Feasibility Study: Northside Intermodal Terminal 1985
- It recommends the
construction of an intermodal transportation facility with integrated
parking structure at the
Northside
Metrorail Station. The proposed terminal would accommodate major
Metrobus
operations and a pedestrian overpass. Completed in 1986. Work by the Metro-Dade Transit
Administration (now
Miami-Dade Transit). Download the
Report (February 1986). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for
complete details.
- Fiber Optic Communications Concept Plan for Miami-Dade County's
Intelligent Transportation Infrastructure 1998 - Defining a conceptual
plan for establishing a fiber optic communications network capable to
support Miami-Dade County's intelligent transportation system
infrastructure. Completed in 1998. Work by
Center for Urban Transportation Research
(CUTR). Download the
Final Report (June 1998). (SkyDrive) Contact Carlos Roa
at 305-375-4507 for complete details.
- Freight Movement Study 1996 - Review assumptions made in the original
Freight Movement Study concerning trucks and surface freight movement in the
MPO's urban area travel model; review the status of recommendations made in
the original study; investigate how e-business affects local area freight
movement; and reestablish the
Freight Transportation Advisory Committee (FTAC). Completed in December 1996. Work by
The Corradino Group. Download the
Executive Summary (December 1996) and
Final Report (December 1996). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for
complete details.
- Flagler Street Reversible Flow Study 1992 - This
study would provide a more in-depth analysis of the pros and cons of
providing reversible traffic flow on certain lanes of West Flagler Street
between 27th Avenue and the Palmetto Expressway. Completed in May 1992. Work
by Transport Analysis Professionals, Inc. Download the
Final Report (May 1992). (SkyDrive) Contact Jesus
Guerra at 305-375-2069 for complete details.
- Florida East Coast (FEC) Transit Connection Study 2009
- A status report
on recent developments and evaluate the feasibility of implementing transit
services along FEC corridor from
MIA to the Dadeland area to
complement a planned bicycle trail facility also known as the Ludlam Trail
project. Started July 2008. Expected completion
is July 2010. Work by Kimley-Horn
& Associates. The approximate cost was $70,000. Download the
Executive Summary (December 2009) and
Final Report (December 2009). Contact Wilson Fernandez
at 305-375-1886 for complete details.
- Golden Glades Multimodal Transportation Facility
Feasibility Study 1994 - This study evaluates the feasibility of
different conceptual designs for developing a multimodal facility at the
Golden Glades Interchange, located in north central Miami-Dade County. Completed March 1994. Work by
ICF Kaiser. Download the
Executive Summary (March 1994) and
Final Report (March 1994). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for
complete details.
- Health District Comprehensive Traffic Study 2008
- This study would document the traffic impacts of both the recent and
forecast growth within the Health District/Civic Center Area. Performed between February 2008 and May 2009. Work by
The Corradino Group. The approximate
cost was $170,000. Download the
Final Report (May 2009). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Hialeah Transit System Express Service Feasibility Study 2009
- This study
is an examination of the City of
Hialeah's existing circulator routes to optimize operations, maximizing
its positive impact on the community. Began June 2010 and completed December 2011. Work by
The Corradino Group for the
City of Hialeah. The estimated cost
is $20,000. Download the
Final Report (February
2010). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Hialeah Transit System Services And Opportunities Study 2003
- This study
looked into improving the
Hialeah Transit
Service (HTS) and evaluating performance of the newly implemented system
and recommending any adjustments. Completed December 2003. Work by
The Corradino Group. Download the
Final Report (December 2003). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- I-395 Alternatives Financial Assessment Study 2002
- The objectives were
to review the three alternatives to replace the existing I-395 structure,
develop two new potential alternatives that can more effectively meet the
objectives of the stakeholders involved, and perform a financial analysis to
determine the financing necessary to implement the recommended solution. The
basic goal of this study is to reach a consensus among
FDOT, the MPO, and the
City of Miami as to a viable
alternative, which will allow FDOT’s
I-395 Project Development & Environment (PD&E) study to recommence. Started in 2002 and completed April 2004. Work by
Kimley-Horn & Associates.
Download the
Final Report (April 2004) and the
Pre-study Review (July 25, 2002). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Implementation of Advanced Warning in
School Speed Zones Study 2011 - Formerly called Implementation of
Transitional Speed Zones in School Zones Study. To evaluate the feasibility of
creating an extended school zone to reduce the speed limit of the roadway by
10 miles per hour (MPH) as a buffer zone before the regular 15 mph school
zones. Started February 2011 and completed March 2012.
Work by Marlin Engineering.
The budget is approximately $54,500, including contingencies. Download the
Executive Summary (March 2012) and
Final Report (March 2012). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Improving Access in FIU Biscayne Bay Campus Area 2010
- This
study will evaluate the feasibility of adding another entrance to the
Florida International University (FIU)
Biscayne Bay Campus. Started August 2010.
Expected completion in February 2011. Work to be performed by
Kimley-Horn & Associates. The
estimated cost is $55,000 ($35,000 for Phase I and $20,000 for Phase II).
Download the
Executive Summary,
Final Report, and
Presentation (October 2011). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Improving Regional Transportation Planning 2012 -
PENDING. This study would document the traffic impacts of both the recent
and forecast growth within the Health District/Civic Center Area. Schedule
to be determined. Work by South Florida Regional
Planning Council. The budgeted cost is approximately $25,000. STATUS:
Pending agreement. (September 2011) Contact
Susan Schreiber at 305-375-1887
for complete details.
- Indirect Left Turns Study 2007 - This study will
address the potential of increasing efficiency and capacity at major
intersections in Miami-Dade County through the elimination of left turns and
replacing them with right turn loops. Started in November 2007 and completed
December 2008. Work by David Plummer &
Associates. The approximate cost was $50,000. Download the
Executive Summary (December 2008),
Final Report (December 2008), and
Presentation (2009). Contact Wilson Fernandez
at 305-375-1886 for complete details.
- Integrated Transportation Information System (ITIS) 2010
- ONGOING. Formally known as the Community Characteristics Program (CCP). It
is now a regional web-based tool, that enables transportation planners and
public involvement offices to create an effective public involvement program
and identify the attitudes and issues facing that particular community. PI
strategies are modified according to community characteristics, such as, but
not limited to, literacy rates, income levels, cultural composition and
religious affiliation. ITIS allows staff to tailor its outreach approach to
determine a community’s stand on a project and work with that community to
gather support. Started July 2010. Expected completion is June 2012. Work by Florida International University.
The approximate cost is $120,000. STATUS: 65% completed. (September 2011)
Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- Integrated Transportation Management System (ITMS)
1998 - The ITMS is based on a GIS platform which incorporates different
data sources to generate reports, tables, maps and graphics, as an excellent
working tool in the decision-making process. The ITMS includes the following
management systems: Congestion (CMS), Pavement (PMS), Intermodal (IMS),
Public Transportation (PTMS), Safety (SMS) and the Traffic Monitoring System
for Highways (TMS/H). Work by
David Plummer & Associates. Download
the
Final Report (November 1998). (SkyDrive) Contact Jesus
Guerra at 305-375-2069 for complete details.
- Intelligent Transportation System Plan for Dade
County 1996 - Created to establish a general policy planning process for
ITS projects, and coordinate and integrate all efforts conducted by
different entities in the same area. Completed July 1996. Work by the MPO staff. Download
the
Report (July 1996). (SkyDrive) Contact Carlos Roa
at 305-375-4507 for complete details.
- Intelligent Transportation System Plan Update for
Miami-Dade County 1999 - Indentifies ITS enabling projects that are most
critical in deployment of a regional ITS system, as well as other ITS
"enhancements" to traditional transportation improvement projects and
services that are location specific. Work by the Center
for Urban Transportation Research. Download the
Final Report (June 1999). (SkyDrive) Contact Carlos Roa
at 305-375-4507 for complete details.
- InteracTIP 2003 - This endeavor automated
the annual development of the TIP. Emphasis was made on improving
consistency; making the TIP book more user-friendly; creating special
reports to answer questions from the general public; facilitating the
analysis of the data; and providing easy access to information by the public
on the internet via Miami-Dade's My Neighborhood website. Updates: 2007
update - Completed in July 2007. Resulted in the InteracTIP 2008 website
(defunct). 2008 update - Developed from January 2008 to November 2008. The
approximate cost was $54,700. Resulted in the InteracTIP 2009 website
(defunct), and InteracTIP MAPS website (defunct). 2009 update - Started
March 2009 and completed January 2010. The cost was $55,000. Resulted in the
first version of the InteracTIP 2010 website (defunct). Completed in January 2004. Work by
David Plummer & Associates and
International Development Analysis
Services (IDAS). Download the
Executive Summary (2004),
Final Report (October 2003), and
Presentation (2004). RESULTS: InteracTIP website. Starting with the 2011
Transportation Improvement Program, the InteracTIP Project Tracking Program
will be conducted annually. Contact Carlos Roa
at 305-375-4507 for complete details.
- Interactive Transportation Information Systems
(Kiosk) 1997 - To provide better information to travelers in the trip
decision making process, in order to increase overall mobility in the area.
Completed in December 1997. Work by Center for Urban Transportation Research
(CUTR). Please visit our office to view or receive a copy of this report.
Contact Jesus Guerra at 305-375-2069
for complete details.
- Investigation of Alternative TMAs 1994 - This
study was conducted to investigate alternative Transportation Management
Associations (TMA) whose programs were not solely employer-based. Started in 1994 and completed October 1994. Work by
Barton-Aschman & Associates. Download the
Report (October 1994). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Kendall Drive Mobility Enhancement Study 2002 - This study was to develop
improvement alternatives for potential
FDOT and MDT work
programs along Kendall Drive (SW 88th Street/SR94). Completed September 2002. Work by
Gannett Fleming. Download the
Final Report (September 2002). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Kendall-Link Alternatives Analysis Study 2005 - The study was a
re-evaluation alternative analysis for rapid transit improvements in the
Kendall Corridor area (along Kendall Drive/SW 88th Street from the Dadeland
area to SW 157th Avenue) connecting both to existing and future Metrorail
facilities in the Dadeland and FIU areas. The study will lead to the
selection of a locally preferred alternative which will consist of rapid
transit improvements. Started November 2005
and completed September 2007. Work by
Edwards & Kelcey. The approximate cost was $873,000. Download the
Kendall-Link documents. Contact Wilson
Fernandez at 305-375-1886 for complete details.
- LeJeune Road Corridor Traffic Impact Study 1996
- A study to identify and
evaluate potential low-cost improvements for the area defined by LeJeune
Road, South Royal Poinciana Boulevard, and NW 36th Street. Completed July 1996. Work by
Kimley-Horn & Associates.
Download the
Draft Final Report (July 1996). (SkyDrive) Contact
Oscar Camejo at 305-375-1837 for
complete details.
- Local Municipal Transit Circulator Policy Study
2002 - The objectives of this study are: 1) to develop a set of
guidelines and standards for implementing transit circulators; and 2) to
develop performance measures for evaluating implemented transit circulators. Completed in June 2002. Work by
Kimley-Horn & Associates.
Download the
Executive Summary (2002) and
Final Report (2002). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Locate Sites for Bus Shelter Installations Study
2008 - Identify sites suitable for the immediate installation of bus
shelters. Started November 2008 and completed December 2009.
Expected completion was July 2009. Work by
David Plummer & Associates. The
approximate cost was $56,448. Download the
Executive Summary (November 2009) and
Final Report (November 2009). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Ludlam Trail Non-Motorized Corridor Planning Environmental Study 2003
- The Ludlam Trail is a non-motorized transportation route through the
county's urban core, expanding the traveler’s transportation options,
enhancing the quality of life, and reducing single-occupant automobiles.
Running northward from
Dadeland
North Metrorail Station to NW 12th Street/Perimeter Road next to
MIA, it is 7 miles along the
FEC Railway parallel to and west of
Ludlam Road/67th Ave. Completed in March 2003.
Work by Reynolds, Smith & Hills, Inc.
Download the
Final Report (March 2003). Contact David
Henderson at 305-375-1647 for complete details.
- Metro-Dade Road Pricing Study 1994 - This
studied if the county's congestion could be mitigated through creative
pricing solutions that would provide motorists, particularly single occupant
vehicles (or SOV), with financial incentives sufficient to alter their
travel behavior. Started in 1994 and completed early-1995. Work by
Kimley-Horn & Associates,
Barbara Howard & Associates, and
Kittelson & Associates.
Download the
Final Report (May 1995). (SkyDrive) Contact
MPO Staff at 305-375-4507 for
complete details.
- Metropolitan Dade County Comprehensive Bicycle Plan
1986 - Identifies projects and strategies to meet the most pressing
needs of bicyclists in the urban area. This plan represents the first major
planning effort addressing needed bicycling-related improvements in Dade
County since the publication of the 1972 Dade County Bikeways Plan. Download the
Comprehensive Bicycle Plan (August 1986). (SkyDrive) Contact
David Henderson at 305-375-1647
for complete details.
- Metropolitan Planning Organization Congested
Intersections Study 1999 - This study was developed to support the
Resourceful Use of Streets and Highways (RUSH) Program recommended in the
Miami-Dade Congestion Management System (CMS). A criteria was developed to
evaluate over 150 intersections. Traffic improvements were recommended for
20 locations. Download the
Report (June 1999). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Metrorail M-Path Master Plan 2006 - It addresses
operational issues and problem areas within the M-Path bicycle/pedestrian
corridor originally created in 1983. The corridor runs from the Miami River
to SW 67th Avenue along US-1 (South Dixie Highway). Started August 2006 and completed July 2007. Performed
by Kimley-Horn & Associates.
The approximate cost was $55,000. Download the
Executive Summary (July 2007) and
Final Report (July 2007). RESULTS: $1.7 million of GOB and FTA funds
available in current year for design and construction of recommended
improvements. Project management to be coordinated by CMO. Contact
David Henderson at 305-375-1647
for complete details.
- Metrorail/Coconut Grove Connection Study Phase II 2004
- This study
examines the feasibility of implementing an exclusive right-of-way transit
connection between the
Metrorail line
and the Coconut Grove Village Center. It looks at possible transit modes,
local systems implemented or planned, national and international research,
and a comparative analysis of transit alternatives for the project. Completed in January 2007. Work by
Reynolds, Smith & Hills, Inc. The
cost was approximately $75,000. Please
visit our office to view or receive a copy of this report. Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Miami Beach Intermodal Feasibility Study 1999 - Requested by the
City of Miami Beach to perform an
intermodal transit center feasibility study for it's electric shuttle (ElectroWave). Completed August 2000. Work by
Corradino. Please
visit our office to view or receive a copy of this report. Contact Susan Schreiber
at 305-375-1887 for complete details.
- Miami Beach Master Plan for the 16th Street Corridor Study 2004
- Identified the needs and ascertain the feasibility of operational
improvements for the implementation of a pedestrian-friendly environment
along 16th Street from Bay Road to Collins Avenue, in the
City of Miami Beach. Started September 2004 and completed March 2007. Work
by McMahon Associates. The study cost
was $75,000. STATUS: Awaiting final report. Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Miami Civic Center Circulator Study 2005 - As part of an economic
development plan developed for the City
of Miami, this study would determine the feasibility of a circulator
system to serve the Civic Center area. Started in 2005 and completed February 2006. Work by
The Corradino Group. Download the
Final Report (February 2006). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Miami Civic Center Circulator Study Phase II 2007
- As a continuation of Phase I, it will focus in more detail on
implementation, routes and cost estimates, contractual management and
operation options analysis, and financing plan. Started in April 2007 and completed
December 2008. Work by The Corradino
Group and the City of Miami's
Office of Grant Administration. The approximate cost was $48,000. Part of
the
Municipal Grant Program. RESULTS: Preparation of a Request for Proposal
(RFP) that was submitted to the Florida Department of Transportation (FDOT)
for consideration and proper action. Contact Larry Foutz
at 305-375-1522 for complete details.
- Miami Downtown Transportation Master Plan 2001 - Cooperatively funded by
the City of Miami, the MPO, and
FDOT. The DTMP will result in a
guide for the city and its
transportation planning partners in planning for the future downtown
transportation system, and provide help in evaluating project proposals at
operational levels, and to allow periodic updates to the transportation
master plan as new development occurs. Completed April 2003. Work by
David Plummer & Associates. Download
the
Executive Summary (2003),
Final Report (April 2003), and
Presentation (2001). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Miami Gardens Circulator Feasibility Study 2006
- Develop a plan for the
establishment of a transit circulator service, in the
City of Miami Gardens, that
would integrate with other transit services in the community. Started August 2006 and completed February 2008. Work by
David Plummer & Associates, The
approximate cost was $50,000. Download the
Executive Summary (February 2008),
Final Report (February 2008), and
Presentation (February 2008). Contact
Carlos Roa at 305-375-4507 for
complete details.
- Miami River Corridor Multimodal Transportation Plan
2006 - This plan identifies means to increase safety and mobility of
freight, pedestrians, transit, and vehicular traffic in the historic Miami
River corridor. Started April 2006 and completed August 2007. Work by
Kimley-Horn & Associates. The
approximate cost was $100,000. Download the
Executive Summary (August 2007),
Final Report (August 2007), and
Appendices (August 2007). Contact
David Henderson at 305-375-1647
for complete details.
- Miami Springs Transit System Service and Opportunity Study 2004
- Formerly
called Miami Springs Mobility Master Plan 2004. This study was part of the
Municipal Grant Program (MGP) to provide a factual basis for
decision-makers seeking to improve the quality of life in the
City of Miami Springs via
improved local transit. Completed November 2004.
Work by The Corradino Group.
Download the
Final Report (November 2004). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Miami Surface Shuttle Services Technical Assistance 2000
- Evaluate the
feasibility of implementing shuttle services for the airport west and
downtown Miami areas. Completed June 2000. Work by
Center for Urban Transportation Research
(CUTR). Download the
Report (June 2000). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Miami-Dade County Bicycle and Pedestrian Facility
Maintenance Program 2008 - ONGOING. It's to develop a comprehensive
maintenance program to ensure the longevity and safety of greenway trails
within the county. Started in December 2008. Expected completion was
September 2009. Work by Florida International
University. The approximately cost $80,000. STATUS: 90% complete.
(February 2010) Contact
David Henderson at 305-375-1647
for complete details.
- Miami-Dade County Grade Separation Feasibility Study 2004
- This study was created to assess if the concept of grade separations and
urban interchanges is viable or fatally flawed for implementation on major
city streets along serving the main county travel corridors. These types of
roadway lanes will allow traffic to bypass sign and/or signal-controlled
intersections. The result is reduced congestion by way of continual traffic
flow through an intersection akin to expressway interchanges. Completed May 2005. Work by
Corradino. Download the
Final Report (July 2005). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Miami-Dade County Typical Roadway Section and
Zoned Right-of-Way Update Study 2007 - To update typical streets section
standards through the County with special emphasis on the urban centers and
review countywide zoned right-of-ways widths, and recommend revised zoned
R-O-W for roadways in the county. Completed December 2007. Work by
Kimley-Horn & Associates. The
approximate cost was $110,000. Download the
Workbook (2007). RESULTS: Draft zoned R-O-W ordinance to be sent to BCC
via Department of Planning and Zoning. Contact Jesus Guerra
at 305-375-2069 for complete details.
- Miami-Dade Freight Plan 2007 - The objective of this study is to develop a
freight master plan that will feed projects into the
Long Range Transportation Plan. Started September 2007 and completed September 2008. Work
by Gannett Fleming. The
approximate cost was $124,929. Download the
Executive Summary (March 2009) and
Final Report (March 2009). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Miracle Mile Traffic Circulator Study 1993 - This study described the
methods that were used to develop traffic and parking improvements plan that
would return Miracle Mile (City of
Coral Gables) to a more pedestrian oriented, shopping friendly
environment. Completed in May 1994. Work by
David Plummer & Associates. Download
the
Report (May 1994). (SkyDrive) Contact Irma San Roman
at 305-375-4507 for complete details.
- Mobility Management Process/Congestion Management System 1996
- In
compliance with ISTEA,
Miami-Dade County developed a MMP/CMS for defining congested corridors and
identifying strategies for alleviating traffic congestion. Work by David Plummer &
Associates. Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Model Validation to Cube Voyager 2007 - To review and validate the
Miami-Dade County model, currently under
FSUTMS and supported with
TRANSPLAN, to the new software engine of
FSUTMS called Cube Voyager. Started December 2007 and completed
September 2008. Work by The Corradino
Group. The approximate cost was $55,000. Download the
User's Guide (September 2008). Contact Larry Foutz
at 305-375-1522 for complete details.
- Modeling Support for Near Term Transportation Improvements Study 2010
- Develop a 2 to 5 year plan for major public transportation
improvements by researching ways to develop new premium public
transportation services in high volume urban travel corridors working in
conjunction with all transportation agencies in the metropolitan area. This
work activity would allow for technical modeling support to complement the
work of a multiagency Near Term Public Transportation Planning Committee
that has been constituted to reassess existing public transportation
services. Started May 2010 and completed November 2010.
Work by Gannett Fleming. The
budget is $104,946. Download the
Report (November 30, 2010). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Near-Term Plan for Improved Transportation Services Study 2010
- Updating the Miami-Dade transportation service plan for the next 2 to 5
years, in conjunction with all transportation agencies in the urban area,
based on the results of the 20-year Transportation Plan. Priorities in the
deployment of future urban transportation services include limited transit
funding for future expansion; raising new revenues through better management
of existing capacity in expressways; and, changing conditions in the
marketplace that require more “green” solutions in urban living. The update
emphasizes ways to establish premium public transportation services that are
cost feasible until it becomes possible to reconsider expansion of urban
rapid rails. This study seeks to use communication experts to work along
with the multiagency Short Term Transportation Improvement Plan Committee. Started March 2010 and completed October 2010. Work by
Jacobs Engineering. The budget is
$54,958. Download the
Final (October 2010),
"Get Going" Brochure (December 2010), and
"Get Going" booklet (December 2010). Contact
Larry Foutz at 305-375-1522 for
complete details.
- North Dade Greenways Master Plan 1997 - To
provide an integrated system of connectors for cyclists, joggers,
equestrians, and pedestrians along more than 300 miles of urban corridors.
It will also seek to reconstruct formerly connected landscapes and create
new ecological corridors among them. This landscape reconciliation will
provide a variety of recreational experiences within an ecologically driven
area. Completed December 1997. Work by
Florida International University. Download
the
Master Plan (December 1997). Contact
David Henderson at 305-375-1647
for complete details.
- North Miami Community Transit Circulator Study 2000
- An analysis of the
need and feasibility of public community transit services using minibuses,
integrated with existing public and private transit services, to serve the
City of North Miami and
neighboring areas. The provision of coordinated community-level transit
service supports the major recommendation of the
Miami-Dade Transit’s
1995 Northeast Dade Transit Improvement Study. Completed April 2000. Work by
PRL & Associates, and North
Meridian, Inc. Download the
Executive Summary (2000) and
Final Report (April 26, 2000). Contact
Oscar Camejo at 305-375-1837 for
complete details.
- North Ponce de Leon Boulevard Median Evaluation 2002
- Development of a
raised median on Ponce de Leon Blvd. between Alcazar Avenue and 8th Street
in Coral Gables. It will review
the capacities and service levels of the existing street cross sections,
crash-prone locations and pedestrian movements. And evaluate the
City of Coral Gables' transit
circulator. Work by
David Plummer & Associates. Download
the
Executive Summary (November 2002) and
Final Report (November 2002). Contact Irma San Roman
at 305-375-4507 for complete details.
- Northeast Corridor Traffic Flow Implementation Plan Study 2008
- This
study will implement the improvements specified by the Northeast Miami-Dade
Traffic Flow Study 2006. Contact Larry
Foutz at 305-375-1522 for complete details. Started December 2008 and
completed January 2010. Work by
Kimley-Horn & Associates. The approximate cost is $75,000. Download the
Executive Summary (January 2010) and
Final Report (January 2010).
- Northeast Miami-Dade Traffic Flow Study 2006 -
Improve traffic flow along the Miami-Dade northeast corridor. It will define
improvements that would accommodate future growth, protect and enhance
mobility and economic prosperity and quality of life within the study area.
It will also help municipalities identify areas of congestion and provide
options to relieve for the same. Started July 2006 and completed
September 2007. Work by the
City of North Miami Beach. The approximate cost was $67,200. Download
the
Executive Summary (2007),
Task 1 and 2 reports (July 2007),
Task 3 report (August 2007),
Task 4 and 5 reports (September 2007), and
Appendix A and B (July 2007). Contact Larry Foutz
at 305-375-1522 for complete details.
- NW 7th Avenue Traffic and Pedestrians Study 2009
- This study is looking at the traffic impacts of the new Immigration
Facility on its immediate vicinity, long range traffic needs to handle the
growth in traffic in the corridor. The study also makes recommendations for
improving pedestrian amenities along the corridor. Started May 2009 and
completed May 2010. Work by The
Corradino Group. The budgeted cost is approximately $90,000. Download
the
Final Report (May 2010). Contact
Larry Foutz at 305-375-1522 for complete details.
- NW/NE 36th Street Study 2006 - Evaluate
traffic flow conditions along 36th Street and adjacent areas. Started August 2006
and completed June 2007. Work by
Kimley-Horn & Associates. The approximate cost was $80,000. Download the
Executive Summary (June 2007) and
Final Report (June 2007). Contact
Larry Foutz at 305-375-1522 for complete details.
- On the Waterfront: Implementation Plan to Finish 15 Mile 2011
- ONGOING. Use ground and aerial pictures to depict the existing conditions,
ownership and potential for promenade development of every parcel on the
route of the Miami River Greenway and Baywalk from the Rickenbacker Causeway
to NW 36th Street. Started January 2011. Expected completion was September
2011. Work by University of Miami. The
approximate cost is $25,000. STATUS: 90% complete. (September 2011) Contact
David Henderson at 305-375-1647
for complete details.
- Opa-Locka Circulator/Transit Improvement Feasibility Study 2008
- Also
known as the City of Opa-Locka Transit Circulator System Study. Develop a
transit system within the limits of the
City of Opa-Locka. Alternatives should be developed considering
different modes. Started November 2008
and completed March 2010. Work by the
City of Opa-Locka through
Kimley-Horn & Associates. The approximate cost is $70,000. Download the
Final Report (March 2010) and
Presentation (May 10, 2010). Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Origin Destination Study for the 95 Express 2010
- ONGOING. This study will survey the riders the
95 Express and
South Dade
Busway express bus routes to determine how they are arriving and how far
they are actually traveling to reach the express bus stop. Miami Dade County
is planning an expansion of express bus service and needed information about
the willingness of commuters to drive beyond a certain distance to access a
park and ride facility and switch modes. This data collection effort will
include operational data from the 95
Express by FDOT to be
reporting to FTA. Started March 2011
and scheduled for a January 2012 completion. Work by
HTNB. The budget
is approximately $90,000. STATUS: 80% complete. (September 2011) Contact
Larry Foutz at 305-375-1522 for complete details.
- Palmetto Bay Transportation Master Plan Study 2004
-
Palmetto Bay has adopted a
master planning strategy to identify its existing and future transportation
system deficiencies. It is expected that thousands of homes will be
developed to the south of the city in the coming years. Started February 2004 and completed in 2004. Work by
The Corradino Group (under contract
with the Village of Palmetto Bay).
Download the
Executive Summary (2004),
Final Report (2004), and its
Appendix B: Stakeholders List (Traffic Data Collection & Analysis) 2004.
Contact
Larry Foutz at 305-375-1522 for
complete details.
- Palmetto Corridor Light Rail Transit Feasibility Study 1996
- Evaluating
the feasibility of implementing a light rail transit project along the
Palmetto Expressway (SR 826). Two alternatives were considered: A)
Dadeland
North Metrorail Station to SR 836 and then to the proposed MIC and; B)
Dadeland
North Metrorail Station to
Okeechobee
Metrorail Station along the Palmetto Expressway. Alternative "A" was
included for consideration in the
LRTP. Completed in January 1997. Work by
Gannett Fleming. Download the
Final Report (January 1997). (SkyDrive) Contact Carlos Roa
at 305-375-4507 for complete details.
- Pedestrian Safety Around High Risk Schools Study 2010
- Prepare school –based Safe Routes to School plans and funding
applications for schools identified as priorities for child safety and
mobility. Started May 2011 and completed February 2012. Work by
Kimley-Horn &
Associates. The budget is approximately $100,000. Download the
Report
(February 2012). Contact
David Henderson at 305-375-1647
for complete details.
- Pedestrian/Bicycle Safety Study 2007 - ONGOING.
This study will document existing traffic operations conditions and
alternative modes of transportation (bus transit, pedestrian ways, bicycle
connections, etc.) at NE 163rd Street and Biscayne Boulevard; and develop
feasible alternatives. Started October 2007. Expected completion
was September 2008 Work by the
City of North Miami Beach. The projected cost is approximately $20,000.
STATUS: Study in progress. (April 2010) Contact David Henderson
at 305-375-1647 for complete details.
- Port of Miami City Street Improvements 2000 -
Also known as Seaport Truck Study. This study evaluated existing truck
traffic movement in and out of the seaport and recommend alternatives to
improve mobility within the downtown area. Completed September 2000. Work by
Beiswenger Hoch & Associates.
Download the
Final Report (September 2009). Contact Jesus Guerra
at 305-375-2069 for complete details.
- Port of Miami Freight Access Study 2006 - Evaluate a variety of intermodal
alternatives for improving freight access to and from the
Port of Miami. Studied from April 2006 to February 2007. Work by
Cambridge Systematics. Download the
Draft Executive Summary (January 2007) and
Final Report (February 2007). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Post Hurricane Short Range Transportation Study
1995 - It was created to define the existing transportation conditions
in the West Miami-Dade Area. Recommendations were made to maintain
acceptable levels of service on roadways that improve mobility options in
the area. Improvements include short and long term projects. Please
visit our office to view or receive a copy of this report. Contact
Carlos Roa at 305-375-4507 for complete details.
- Public Involvement Effectiveness Evaluation Program 2001
- The purpose of
this study was to establish an evaluation program that can measure the
effectiveness of the Miami-Dade MPO Public Involvement Program. The MPO
Board approved and incorporated the program as part of the Miami-Dade
Prospectus for Transportation. Innovative strategies were included as part
of the plan that was fully endorsed by the
Federal Highway Administration
(FHWA). Work by
Gannett Fleming. Download the
Report (November 2001). Contact Elizabeth Rockwell
at 305-375-1881 for complete details.
- Rail Convertibility Study 2003 - Also called Rails to Trails; or
Converting Rails to Transit, Bike & Pedestrian Facilities Study. This study
will provide a comprehensive assessment of abandoned and underutilized rail
right-of-way for potential public transportation uses. Previous related work
can be found in the Railroad Rights-of-Way Assessment
Study (1993). Started October 2003 and
completed September 2004. Work by The
Corradino Group. Download the
Final Report (November 2004). Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Railroad Rights-Of-Way Assessment Study 1993 -
This study would create an inventory of all railroads in Miami-Dade County;
examine for potential use in public transportation; and develop
recommendations for particular corridors to be studied in detail. Completed August 1993. Work by
ICF Kaiser Engineers. Download the
Report (August 1993). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for
complete details.
- Regional Freight Plan 2008 - This study will
analyze existing and new data and, in conjunction with the regional
visioning process, develop a regional freight strategy and make
implementation recommendations. Started May 2008 and completed December 2009. Work by
Kimley-Horn & Associates (via
FDOT). The approximate cost is
$33,000 (the MPO's share of a tri-regional effort totaling $198,791).
Download the
Report (March 2010). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Regional Long Range Transportation Plan 2007 -
This plan provides a prioritized set of highway and transit improvements for
Miami-Dade, Broward, and Palm Beach counties, recognizing the regional
characteristics of many travel needs. Started December 2007. Expected
completion is now May 2010. Work by
Kittelson and Associates. The total estimated cost is approximately
$450,000 (Miami-Dade's share is $150,000 with remaining amount being
provided in equal parts by the Broward and Palm Beach MPOs). STATUS:
Awaiting final report. (December 2010) Contact Wilson Fernandez
at 305-375-1886 for complete details.
- Safe Routes to Parks Study 2009 - Also known as the Pedestrian
Safety at Miami-Dade Regional Parks Study. Improve pedestrian safety around
parks to help create more "walkable" communities and reduce traffic
congestion by developing pedestrian safety plans for the following county
parks: Tropical,
Partners for Youth,
Francisco Human
Rights,
Little River,
Country
Village, and
Goulds.
As well as countermeasures that can be used to guide pedestrian safety
improvements at additional county parks. Started in May 2009 and completed
July 2010. Work by David Plummer & Associates.
The cost is $56,496. Download the
Final Report (March 2010). Contact
David Henderson at 305-375-1647
for complete details.
- Safe Routes to School Online Map System Pilot Program 2009
- ONGOING. Also
known as the Online Safe Routes to School Pilot Program. To develop an
online program for selected public elementary schools. The system will allow
a user to select an individualized walking route between a student’s home
and his/her school based on infrastructure and traffic factors including,
but not limited to, existing sidewalks, crosswalks, school speed zones,
traffic signals, and speed limits. In addition to a printable walking route
map and written directions, students and parents will be able to get
pedestrian safety information from the WalkSafe program developed by the
University of Miami’s
Miller School of Medicine. Started April 2010. Scheduled completion
was April
2011. Work by Florida International
University, College of Engineering and Computing. The cost is $75,000.
STATUS: Awaiting final report. (September 2011) Contact
David Henderson at 305-375-1647
for complete details.
- Safe Routes to School Program Study 2003 - To
identify and propose corrective measures on existing student pedestrian
safety hazards along designated Safe Routes to School in selected high
student pedestrian crash areas. An existing Safe Routes to School Program is
in place, but has not been updated for several years. Started April 2003 and completed September 2006. Work
by Reynolds, Smith & Hills, Inc.
Download the
Executive Summary (September 2005),
Presentation (September 2005), and
Technical Memorandum No. 3 (September 2005). Contact
David Henderson at 305-375-1647
for complete details.
- Safe Routes to School Program Study 2006 - This
would prepare “safe routes to school” plans for elementary schools that
identify a safe route and infrastructure improvements within the attendance
boundary. Completed July 2007. Work by
Reynolds, Smith & Hills, Inc. The
approximate cost was $60,000. Download the
District-wide Traffic Operations Studies No. 25 and
District-wide Traffic Operations Studies No. 26. RESULTS: $2.2 million
programmed for design and construction of 15 Liberty City-area elementary
schools in the current year (FM #4208811). Contact
David Henderson at 305-375-1647
for complete details.
- Safe Routes to School Program Study 2007 - This would prepare “safe routes
to school” plans for elementary schools that identify a safe route and
infrastructure improvements within the attendance boundary. Contact
David Henderson at 305-375-1647
for complete details. Started in October 2007 and completed in July 2008.
Work by The Corradino Group. The
approximate cost was $55,000. Download the
Report (2008). RESULTS: Safe Routes to
School Program to run annually when funds are available. Contact
David Henderson at 305-375-1647
for complete details.
- Senior High School Student Safety Campaign 2008
- ONGOING. This study will develop a student pedestrian and vehicular safety
campaign program targeting senior high school students. Started November
2008. Expected completion was June 2009. Work by
Miami-Dade County Public Schools.
The approximate cost is $25,000. Download the
Teen Driver Safety Week Poster (October 2009). STATUS: 90% complete.
Contact
David Henderson at 305-375-1647 for complete details.
- School Zone Traffic Congestion Study 2002 -
Study the alternatives for transportation operations and design for improved
access and area traffic flow surrounding public schools. Completed in July 2002. Work by
David Plummer & Associates. Download
the
Executive Summary (July 2002),
Final Report (July 2002), and
Presentation (July 2002). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Service Enhancements to the Hialeah Transit System 2007
- Also known as the Hialeah Transit System Express Bus Route and Enhanced
Service. This study examines potential HTS express transit service by
examining the existing service with the intention of providing services on
less congested roads on the periphery of the city and linking key
attractions and destinations. Started January 2007 and completed
March 2008. Work by the City of Hialeah.
The approximate cost is $20,000, part of the
Municipal Grant Program. Download the
Draft Final Report (March 2008). Contact Larry Foutz
at 305-375-1522 for complete details.
- Short Range Truck Traffic Study for the Airport West Area 2002
- Develop a set of standards and an implementation plan to better
accommodate truck traffic and commercial truckers needs in the Airport West
area. Completed in July 2002. Work by
David Plummer & Associates. Download
the
Executive Summary (2002),
Final Report (2002), and
Presentation (July 2002). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Simulation and Analysis of Potential Mass Evacuation of Miami-Dade
Residents 2006 - Requested by
CTAC in response to the mass evacuation that followed Hurricane
Katrina's impact on New Orleans and Hurricane Rita's impact on Houston. Completed June 2007. Work by
Gannett Fleming and
Advanced Transportation Engineering
Consultants. Download the
Final Report (June 2007). Contact Oscar Camejo
at 305-375-1837 for complete details.
- Snake Creek Bike Trail Planning and Feasibility Study 2004
- Formerly
Snake Creek Canal Bikeway Planning and Feasibility Study. This study will
plan for two segments of a non-motorized trail within the Snake Creek canal
right-of-way. A portion contains the Snake Creek Bike Path and will look at
expanding the bike path to connect similar facilities in
North Miami Beach and the
proposed Florida Turnpike
greenway. Started August 2004 and completed June
2005. Work by Kimley-Horn &
Associates. Download the
Final Report (2005). RESULTS: $3.7 million programmed for design and
construction in fiscal years 2010-2012 (FM #2512003). Contact David Henderson
at 305-375-1647 for complete details.
- Snapper Creek Park & Ride Feasibility Study 1998
- To assess the
feasibility of implementing a park and ride facility at the Snapper Creek
Service Plaza on Florida's
Turnpike. The feasibility considerations include the demand for the
facility, and accessibility and operational impacts on the
Turnpike and the Service
Plaza. Started in 1998 and completed January
1999. Download the
Final Report (January 1999). (SkyDrive) Contact FDOT
at 1.800.435.2368 for complete details.
- Snapper Creek Trail Segment A Planning Study 2007
- This study will help establish ways to bring the existing trail up to
current standards for amenities and crossings safety, improve access, and
determine best side of canal for new trail portions where needed. Started July 2007 and completed March 2009. Work by
Kimley-Horn & Associates. The
approximate cost was $55,000. Download the
Executive Summary (October 2008) and
Final Report (October 2008). Contact
David Henderson at 305-375-1647
for complete details.
- Sociocultural Effects Program 2003 - Formerly Community Impact Assessment
Program. Studied from July 2003 to April 2005 (in two phases) by
FIU Metropolitan Center;
FIU GIS RS Center; and Urbana
Research and Consulting, Inc. Connected to the Community Characteristics
Project (CCP). The CCP is a tool which enables the Public Involvement Office
(PIO) to review the social, economic, and geographic characteristics of an
area before public involvement (PI) outreach is initiated. Phase I is a
rudimentary web-based program utilizing
ArcExplorer
(shareware); while Phase II is program customized with added functionalities
for a customer friendly environment. Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- South Beach Bicycle and Pedestrian Study 1994 - Work by Barton-Aschman
Associates. Undertaken as part of the MPO’s assistance to the South Beach
Transportation Management Association. The traditional grid roadway system,
high percentage of recreational trips, parking demand, short trip distances,
extensive transit services and low income employment are ideal for promoting
programs to encourage cycling and walking. Download the
Report (January 1995). (SkyDrive) Contact
David Henderson at 305-375-1647
for complete details.
- South Dade Greenway Network Master Plan 1994 - Out of the chaos of
Hurricane Andrew, a community desire emerged to create a comprehensive
system of multi-purpose trails in South Dade County that would provide
scenic, recreational and utilitarian corridors to be enjoyed by both
residents and visitors. Contact David
Henderson at 305-375-1647 for complete details. Completed in 1994. Work
by The Redland Conservancy. Download the
Final Report (November 1994). (SkyDrive)
- South Dade Managed Lanes 2007 - The objective of this study is to identify
reasonable alternatives for developing of managed lanes in the right-of-way
of the South Dade Busway and to evaluate the revenue generating potential. Started July 2007 and completed September
2008. Work by Kimley-Horn &
Associates. The approximate cost was $80,000. Download the
Executive Summary (September 2008),
Final Report (September 2008), and
Presentation (November 2008). Contact Larry Foutz
at 305-375-1522 for complete details.
- South Florida Clean Energy and Greenhouse Gas Emission Reduction Program
2009 - ONGOING. It will accelerate the growth and development of
alternative fuel fleets, fuel suppliers and awareness in the four county
regions. Started April 2009. Expected completion
in March 2010. Work by the South Florida
Regional Planning Council (SFRPC). The approximate cost is $50,000.
STATUS: 80% complete. Contact Susan Schreiber
at 305-375-1887 for complete details.
- South Link (South Miami-Dade Transit Corridor Study 2004)
- An alternative
analysis to develop transportation improvements for the corridor that
stretches from the Dadeland South Metrorail Station to Florida City. The
focus was on those projects already funded and under construction, in order
to keep pace with the rapid population growth and forecasted travel needs
for the South Miami-Dade area. Completed January
2006. Work by The Corradino Group.
Download the
South Link documents. Contact
Wilson Fernandez at 305-375-1886 for complete details.
- Special Use Lane Study 2004 - Also called
Reversible Lanes. This study makes a quick examination of freeway facilities
and major arterials that have the potential to accommodate special use
lanes, which could be reversible or could be used by regular traffic,
high-occupancy vehicles (HOV), bus rapid transit, or some mixture of the
three. Completed in 2004. Work by
The Corradino Group and
PMG Associates, Inc. Download
the
Brochure (2004) and
Executive Summary (2004). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Special Use Lanes Study: Transit Use of Shoulder By-Pass Lanes 2005
- This study evaluates the condition of the shoulders along the expressway
system for allowing transit buses to use it as a by-pass lane for traffic
congestion. Segments were identified, as appropriate and an action plan was
developed. A pilot project will be implemented in phases. Completed in November 2005. Work by
The Corradino Group. Download the
Final Report (November 2005). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- SR-826 and Biscayne Boulevard Pedestrian & Bicycle Safety Study 2007
- Also known as the City of North Miami Beach Pedestrian/Bicycle Safety
Study and the North Miami Beach US-1/NE 163rd Street Intersection Study. The
purpose was to investigate and document existing traffic operations
conditions, alternative modes of transportation; i.e., bus transit,
pedestrian ways, bicycle connections, etc, and develop alternative solutions
that are economically and environmentally feasible. Started October 2007 and completed May 2008. Work by
URS Corporation, in conjunction with
the City of North Miami Beach.
The cost is part of the
Municipal Grant Program. Download the
Report (March 2008). Contact
David Henderson at 305-375-1647
for complete details.
- Strategies for Integration of Sustainability and the Transportation
System 2010 - Identify and evaluate several strategies to
improve the sustainability of the county’s transportation system with an
emphasis on accommodating future travel needs using primarily transportation
demand management strategies. A scenario system planning approach will be
employed to assess the effectiveness of various strategies for Miami-Dade
County that have been planned or implemented elsewhere. Started December
2010 and completed November 2011. Work by Jacobs Engineering.
The budget is approximately $112,488. Download the
Executive Summary (December 2011),
Final Report (December 2011), and
Appendix (December 2011). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Superarterial Network Study 1996 - This study identifies corridors and
improvements for developing a superarterial network to alleviate existing
traffic congestion along the expressway system. Completed October 1998. Work by
Parsons, Brinckerhoff, Quade & Douglas,
Inc. Download the
Final Report (October 1998). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for
complete details.
- SW 152nd Street Corridor Transportation Study
2007 - Identify alternatives for improving traffic flow along SW 152nd
Street, from US-1 to 162nd Avenue. Started March 2007 and completed July
2008. Work by Gannett Fleming.
The approximate cost was $80,000. Download the
Executive Summary Report (July 2008) and
Final Report (July 2008). Contact Jesus Guerra
at 305-375-2069 for complete details.
- Town of Cutler Bay Transportation Master Plan 2008
- Study the existing
and future conditions of the transportation system within the
Town of Cutler Bay. Started September 2008 and completed April 2009. Work
by The Corradino Group for the
Town of Cutler Bay. The
approximate cost is $100,000. Download the
Final Report, July 2009. Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Town of Medley NW 116th Way Corridor Study 2009
- As part of the
Municipal Grant Program, the Town
of Medley will have detailed traffic study performed for the major
intersections along the corridor and will identify improvements. Started December 2009 and completed July 2010. Work by the
Town of Medley and
Calvin, Giordano & Associates.
The budgeted cost is $31,335. Download the
Appendix, June 2010. Contact
Larry Foutz at 305-375-1522 for
complete details.
- Town of Medley NW South River Drive Corridor Study 2003
- Also
called South River Drive Corridor. This study was to provide the
Town of Medley and the Miami-Dade
MPO with information on the existing conditions along NW South River Drive,
between NW 107th Avenue and the Palmetto Expressway, and the need for
improvements. Completed December 2003. Work by
Corzo Castella Carballo Thompson Salman, P.A.
Download the
Volume 1 Engineering Analysis (December 2003). Contact Jesus Guerra
at 305-375-2069 for complete details.
- Town of Medley NW South River Drive Corridor Area Expansion Study 2005
- Also called Medley, Phase II or South River Drive Corridor II. This was
created to investigate transportation characteristics and deficiencies
associated with the Town of Medley's
westernmost industrial area and its interaction with SR-25. Completed November 2005. Work by
Corzo Castella Carballo Thompson Salman, P.A.
Download the
Volume 1 Master Plan (November 30, 2005),
Volume 1 Appendix (November 2005),
Volume 2 Master Plan (November 30, 2005) and
Volume 2 Appendix (November 2005). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Town of Medley Transit Circulator Services Implementation Study 2005
- It
provided the Town of Medley and
the MPO with a comprehensive evaluation of existing public transportation
system deficiencies; determine existing and potential transit needs;
recommend a transit circulator system and strategy; and, a preliminary cost
estimate and potential funding sources. Started August 2005 and completed September 2006. Work by
BCC Engineering and Westhorp &
Associates. Download the
Executive Summary (2006) and
Full Report (2006). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Town of Miami Lakes Transportation Master Plan 2004
- This was to develop
a plan for the Town of Miami Lakes
to accommodate local mobility needs. Completed in February 2004. Work by
Kimley-Horn & Associates.
Download the
Final Report (February 2004). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Traffic Calming for Pedestrians at Miami-Dade Community College Wolfson
Campus Study 2003 - Pedestrian-oriented traffic calming and mitigation study
of the area adjacent to and surrounding the downtown Wolfson campus of
Miami-Dade College including mitigating
car and truck traffic impacts accessing the
Port of Miami and
downtown Miami. Started November 2003 and completed June 2004. Work by
HDR, Inc. Download the
Executive Summary (September 2004),
Final Report (September 2004), and
Presentation (2004). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Traffic Safety Plan for Elderly Pedestrians in Miami-Dade County 2010
- Formerly called Miami-Dade Most Dangerous Locations for Elderly Pedestrians.
To investigate the safety of elderly pedestrians at road segments and
intersections. A two-fold approach is proposed: 1) identify the most
dangerous locations using crash, Annual Average Daily Traffic (AADT), and
related data from Miami-Dade
Public Works; and 2) provide engineering or intervention (e.g.,
education) countermeasures towards improving the safety of elderly
pedestrians. Started March 2010 and completed
October 2010. Work by
Miami-Dade Public Works and Florida
International University. The budgeted cost is approximately $67,000. (FIU
will provide $50,000 through
Public Works.) Download the
Report (March 2011). Contact David Henderson
at 305-375-1647 for complete details.
- Traffic Signs Research Study for Miami-Dade County
2006 - Evaluate a set of feasible alternatives for improving
withstanding capabilities, in the event of a hurricane, of the street signs
without making the installation process more difficult. Completed in 2007. Work by
the Center for Urban Transportation
Research and the University of South
Florida. Download the
Executive Summary (May 2007),
Final Report (May 2007), or
Presentation (June 11, 2007). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Transit Center Connections Study 2003 - Also
called Connecting Traffic Generators Study 2003. This study identifies
opportunities for improved intermodal connections and develop a tool for
easy access to information regarding opportunities for such connections. The
intermodal connections or “Transit Centers” are defined as transportation
transfer points, providing access to transportation services, multiple
services or modes. Studied from August 2003 to August 2004. Work by
Cambridge Systematics. Download the
Brochure (2004) and
Final Report (December 2004). Contact
Carlos Roa at 305-375-4507 for
complete details.
- Transit Contraflow Feasibility Study 2002 -
Evaluate the feasibility of a bus transit contra flow facility in Miami-Dade
County, and select and recommend a specific highway or highway corridor for
further study and implementation. Completed in 2002. Work by
Kimley-Horn & Associates.
Download the
Executive Summary (2002) and
Final Report (2002). Contact Jesus Guerra
at 305-375-2069 for complete details.
- Transit Corridors Transitional Study 1994 - This study compared the costs,
revenues, ridership, and benefits between the Northeast, North, West,
Kendall, Homestead, and
Miami Beach transit corridors. No
priorities were derived from the study. Please
visit our office to view or receive a copy of this report. Contact
Larry Foutz at 305-375-1522 for
complete details.
- Transit Hub Evaluation Study 2008 - Develop a
comprehensive transit hub system plan that will best serve transit patrons
and ease of travel. Started April 2008 and completed May 2009. Work by
The Corradino Group. The approximate
cost was $60,000. Download the
Executive Summary (March 2009) and
Final Report (May 2009). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Transit On-Board Survey 2008 - The objective of
this study was to develop a data collection program that meets FTA
guidelines to support transit modeling efforts. Started October 2008 and completed
July 2009. The approximate cost is $150,000. Download the
Final Report (July 2009). Contact Larry Foutz
at 305-375-1522 for complete details.
- Transit Oriented Development Master Plans for Exclusive Busway Corridors
Study 2003 - To complete master plans and implementing regulations for
two planned Community Urban Centers (CUCs) designated in the Miami-Dade’s
Adopted 2005-2015 Land Use Plan along the programmed Exclusive Busway
Extension located along US1 at the intersections of SW 216th (Goulds) and
248th (Princeton) streets. The aforementioned will implement the county’s
Comprehensive Development Master Plan (CDMP) provisions governing planned
CUC and the CDMP Guidelines for Urban Form which seek to promote
pedestrian-friendly, mixed-use and transit-supportive development in
connection with the Busway. Completed November 2003. Work by
Miami-Dade Planning & Zoning.
Download the
Download the
Goulds Community Urban Center Citizens’ Master Plan Final Report (July 23,
2003),
Goulds Community Urban Center Zoning District Ordinance (2007),
Princeton Charrette Report (January 2004), and
Princeton Community Urban Center Zoning District Ordinance (2007). Contact Susan Schreiber
at 305-375-1887 for complete details.
- Transit Service Evaluation Study 2009 - Formerly called
Evaluation of Miami-Dade Transit's Trunk and Feeder Bus System Study. The
objectives of this study are to evaluate service changes implemented by
Miami-Dade Transit (MDT) in
December 2009 and to develop an continuous monitoring program. As well as to
develop standards for the installation, relocation and elimination of bus
stops, benches and shelters. Started June 2010.
Completed October 2011. Work by
Gannett Fleming. The budgeted
cost is approximately $124,634. Download the
Executive Summary (October 2011),
Final Report (October 2011), and
Appendices (October 2011).
Contact
Jesus Guerra at 305-375-2069 for complete details.
- Transportation and Economic Impact Analysis for Freight Industry 2010
- Also known as the Transportation and Economic Impacts of the Freight
Industry in Miami-Dade County. Examines the impacts of the freight industry in Miami-Dade County
by track the amount and nature of goods moving from the source to market;
the amount of warehousing real estate; and, the number of jobs at the
airport, seaport, in warehousing, rock mining, rail transport, and
trucking. The secondary impacts (vehicle sales, real estate, fuel, material,
permits, licenses, maintenance, and taxes) will also be analyzed. Economic
multipliers are then applied to all the aforementioned impacts to determine
the full impact on the economy of South Florida including potential impacts
of future Post-Panamax shipping at the
Port of Miami. Started August 2010. Expected completion was July 2011.
Work by Marlin Engineering.
The budget is $120,000. Download the
Final Report (December 2011),
Executive Summary (December 2011), and
Presentation (December 7, 2011). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Transportation Data Management System (TDMS) 2001
- Implement a flexible,
expandable, computer-based electronic MPO-resident relational database to
hold and husband transportation and transportation-related data that will
allow statistical, temporal, and geographic analyses, and be capable of
report, tabular, graph, and map presentation of information. Contact
Jesus Guerra at 305-375-2069 for
complete details. Completed March 2002. Work by
David Plummer & Associates, and
International Development Analysis
Services. Download the
Executive Summary (March 2002) and
Final Report (March 2002).
- Transportation Demands of the 21st Century 2007
- Formerly called Transportation Innovations in the 21st Century. This study
will develop a menu of innovative cutting edge strategies for enhancing the
county's transportation system in order to meet current and future
transportation needs using strategies that employ state-of the art concepts
in the areas of land use, safety, technology and environmental protection.
The November 2007 completion not reached due to a scope revision. Started May 2007 and completed January 2009. Work by the
Center for Urban Transportation Research
(CUTR). The expected cost is approximately $56,560. Download the
Executive Summary (January 8, 2010) and
Final Report (January 8, 2010). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Transportation Financial Analyses and Assessments
Study 1997 - This study addresses the process in Miami-Dade County that
leads to fundamental decisions about which transportation projects are
implemented, the manner and sequential order in which they are implemented
and the structuring of funding and financing of these projects. Work by KPMG.
Download the
Executive Summary (July 1997). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for
complete details.
- Transportation System Hurricane Emergency
Preparedness Plan 1995 - A review of the transportation system during
hurricane conditions. The results included a full inventory of the county's
traffic signals and projected pre-storm evacuation roadway clearance times,
among other things. Download the
Plan (1995). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for
complete details.
- Transportation System Performance Monitoring 2007
- This study would identify a series of performance measures that can be
collected on an annual basis to have a method of tracking changes in the
quality and level of service on the transportation system. Started September 2007 and completed February 2009. Work
by Gannett Fleming. The
approximate cost was $59,912. Download the
Report (November 2008) and
State of the County (November 2008). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Trends in Heavy Truck Traffic Management Study 2003
- This study will research current trends in the management of such heavy
truck traffic in major metropolitan areas to see what approaches work best
to reduce motorists’ concerns while maintaining the flow of goods and
services. Two freight and trucking-oriented studies have been previously
conducted. The main focus was not on specifics of heavy truck operations on
expressways and major arterials. Started June 2003 and completed
October 2004. Work by Cambridge Systematics.
Download the
Executive Summary (2005),
Final Report (2005), and
Presentation (2005). Contact Larry Foutz
at 305-375-1522 for complete details.
- Truck Route System for Miami-Dade County 2006 -
It's task was to identify current and future corridors for heavy truck
traffic and to preserve roadways for such vehicles by designating them as
truck routes. Started August 2006 and completed June 2007. Work by
The Corradino Group. The approximate
cost was $53,000. Download the
Executive Summary (June 2007) and
Final Report (June 2007). Contact
Larry Foutz at 305-375-1522 for
complete details.
- Update of the Miami-Dade County GIS Crash Data System 2009
- The purpose of this project was to update and maintain the Crash Data
System for Miami-Dade County
Traffic Engineering and MPO. The Miami-Dade crash data system is
developed and hosted at the University of
Florida. The system allows users to identify and map high crash
locations in all the county roads based on number of crashes and injury
severity. In addition, the system provides crash intersection diagrams,
tables, charts and summarized reports as well as access to individual crash
reports. The system is accessed via internet through a web browser.
Miami-Dade County Traffic
Engineering manages the access privileges for the users of the system.
During the 2009-2010 contract University of
Florida obtained, processed, mapped and loaded the long form crashes for
year 2009. This included automobile, bicycle and pedestrian crashes. The raw
crash data was obtained from Florida
Department of Highway Safety and Motor Vehicles (DHSMV). The data was
converted in a suitable database format and was mapped to the Miami-Dade
streets. Additionally, new software features were added to the system. They
include ability to produce reports with an expanded list of attributes for
bicycle and pedestrian crashes and the ability to export the full set of
crash attributes. University of Florida
provided on-site training for the
Traffic Engineering and MPO
users. The current crash database includes long form crashes in all
Miami-Dade roads for years 2005 through 2009. The crash data system is
functional and available for Miami-Dade County users. The budgeted
cost is approximately $50,000. (UF will
provide $35,640 through
Miami-Dade Public Works). Download the
Presentation (March 8, 2009). RESULTS:
Miami-Dade Geographical
Information Systems (GIS) crash data system was updated. No final report
necessary. Contact Carlos Roa at
305-375-4507 for complete details.
- US-1 Intersection Improvements Study 2007 - This study investigates the
operational and safety needs and improvement alternatives for 12
intersections along US 1, between SW 72nd Avenue and SW 136th Street, on the
eastern boundary of the Village of
Pinecrest. Completion is tentative on study presentation to committee. Started September 2007 and completed April 2008. Work
by the Village of Pinecrest and
Florida International University. The
approximate cost was $30,000. Download the
Report (April 3, 2008) and
Presentation (May 10, 2008). Contact Oscar Camejo
at 305-375-1837 for complete details.
- US-1 Reversible Flow Lane Study 2006 - Study
the feasibility of developing a master plan for the addition of two
reversible lanes along US 1 between I-95 and Bird Road. Started August 2006 and
completed December 2007. Work by The
Corradino Group. The approximate cost was $55,000. Download the
Executive Summary (October 2007),
Final Report (December 2007) and
Presentation (January 7, 2007). Contact Larry
Foutz at 305-375-1522 for complete details.
- US-1/SR-878 Intersection Sub-Area Traffic Study 2009
- Develop several conceptual improvement strategies to alleviate traffic
congestion along US-1 in the vicinity of State Road 878. Started May 2009 and completed December 2009. Work by
David Plummer & Associates. The
budgeted cost is approximately $62,000. Download the
Final Report (March 2010) and
Presentation (September 2, 2009). Contact
Wilson Fernandez at 305-375-1886
for complete details.
- Vanpool Demonstration Program 1996 - Provide vans
to individuals traveling together on a regular basis to work, as well as
institutions, businesses, agencies and other organizations. This program is
a result of the Congestion Mitigation: Public-Private Partnerships Study
conducted for the MPO in March 1994. Completed in January 1997. Work by
Vanpool Services
Incorporated. Please
visit our office to view or receive a copy of this report. Contact Jesus Guerra
at 305-375-2069 for complete details.
- Village of Palmetto Bay Bicycle and Pedestrian Master Plan 2008
- It's
objective is to create a vision of non-motorized transportation within
Palmetto Bay boundaries. Started November 2008 and completed June
2009. Work by the Village of
Palmetto Bay. The approximate cost was $50,000. Download the
Master Plan (August 2009). Contact David Henderson
at 305-375-1647 for complete details.
- Village of Palmetto Bay Safe Routes to School Program Study 2009
- ONGOING. To prepare a Safe Routes to School plan for four schools within the
Village of Palmetto Bay that
have identified the need for a Safe Route within the school attendance
boundary. This will include infrastructure improvements along the route, as
well as cost estimates. The second phase is to prepare a FDOT Safe Routes to
School Infrastructure Funding Application for each school, for particular
items that are not within Village jurisdiction. The desired outcomes include
increased bicycle, pedestrian, and traffic safety; decreased traffic
congestion and improved childhood health. Started February 2010. Scheduled completion was July
2010. Work by the Village of
Palmetto Bay. The budgeted cost is approximately $38,742. STATUS: 95%
completed. (December 2010) Contact
David Henderson at 305-375-1647
for complete details.
- Village of Pinecrest Safe Routes to School Study 2010
- PENDING. Prepare Safe Routes to School plans for Pinecrest Elementary, and
Palmetto Elementary, Middle and Senior High School. Scheduled to start January 2011 and completed August
2011. Work by the Village of
Pinecrest. The budgeted cost is approximately $40,000. STATUS: Scheduled
to start. (December 2010) Contact
David Henderson at 305-375-1647
for complete details.
- Web-based Bicycle Route Planning Tool 2010 - Develop an online system that
prepares a suggested bicycle route along streets and other bike facilities
which connects start and end points selected by the user. Because it will
create routes that meet a users preferences the system will remove a
significant information barrier to practical bicycle use. The project will
be completed by the University of Florida’s
Geomatics Program. This
study will be consistent with a similar system developed for the
Broward County MPO and have linked
inter-county origins and destinations. Started February 2010 and completed September 2010.
Work by the University of Florida. The
approximate cost was $50,000. Download the
Final Report (September 2010). Contact
David Henderson at 305-375-1647
for complete details.
- Welfare to Work: Transportation Issues and
Opportunities in Miami-Dade County 1998 - The main purpose of this study
was to compile basic information concerning welfare recipients in Miami-Dade
County who were eligible for the Work and Gain Economic Self-Sufficiency
(WAGES) Program. Completed in December 1998. Work by
FIU Metropolitan Center. Download
the
Final Report (December 4, 1998). (SkyDrive) Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- West Flagler Street Corridor Study 1997 - Seek
solutions to mobility problems and promote transportation modes other than
single-occupancy vehicles along West Flagler Street. Started in 1997 and completed September 1998. Work by
Miami-Dade's Planning, Development and Regulation (now
Miami-Dade Planning & Zoning
Department). Download the
Final Report (September 1997) and
Implementation Measures (September 1998). (SkyDrive) Contact
Susan Schreiber at 305-375-1887
for complete details.
- Westchester Traffic Impact Study 2007 - The study will evaluate current
and future traffic conditions as a result of new development and roadway
improvements in the Westchester area. The area is defined as: Palmetto
Expressway to the east, Krome Avenue to the west, S.R. 836 to the north, and
Miller Drive/SW 56th Street to the south. Started April 2007 and completed June 2008. Work by
Gannett Fleming. The final cost
was $54,986. Download the
Final Report (June 30, 2008). Contact
Wilson Fernandez at 305-375-1886
for complete details.