Skip Navigation
Last Visited »

Important Global Message

Maintenance Alert

The Miami-Dade County Portal will be undergoing maintenance starting at 11 p.m. Saturday, May 3 and for all of Sunday, May 4. Intermittent outages may be experienced. We apologize for any inconvenience.

Thank you for your patience as we improve our online services.

Architectural & Engineering / CBE

Listed below are Architectural & Engineering projects and the status of the review for small business measures. A Verification of Availability form is available below (when applicable) and may be submitted any time prior to the posting of the SBD Final Recommendation. Simply download form accompanying the applicable project and return as instructed. Additionally, comments on any project may be sent to SBDprojectmeasure@miamidade.gov. SBD reviews all comments and may use information when making goal recommendations as applicable.

DateReceived

Project Number

Project Title

Project Package

Dept. Recommendation

SBD Project Breakout

Additional Information

Verification of Availability

SBD Analysis & Recommendation

SBD Final Recommendation

Comments

11/21/14 E14-PWWM-09 Non-exclusive Professional Service Agreement for South Miami Avenue 
Streetscape Improvements from 15 Rd to 8 St
PDF 20% - SBE - A&E - Goal PDF N/A PDF SBE-A&E 28% Goal SBE-A&E 28% Goal PDF
11/5/14 E14-PWWM-08 Non-exclusive Professional Service Agreement for Bond Engineering Services. PDF CBE - 5% Goal
                                                        
SBE - Goods & Services - No Measure
PDF N/A PDF

SBE - A&E- 16% Goal

SBE - Goods & Services - No Measure 

SBE - A&E - 16% Goal

SBD-Goods & Services - No Measure

N/A
10/30/14 E14-WASD-02 NTPC for Professional Cost Estimating and Scheduling Services PDF

25% CBE Goal

.5% SBE Goal

PDF N/A PDF

0.05% SBE - Goods & Services

30.00% SBE - A&E

0.05% SBE - Goods & Services

30.00% SBE - A&E

N/A
10/17/14 59250014004 Zoo Miami – Animal Hospital Expansion PDF 13% CBE Goal PDF N/A N/A 13% CBE Goal 13% CBE Goal N/A
9/29/14 E14-PWWM-10 FDOT Local Agency Program Compliance Services for Various Projects PDF 9.91% DBE Goal N/A N/A N/A No Measure No Measure N/A
8/14/14 E14-PA-01 Professional Services Agreement for Digital Referenced Oblique Aerial Imagery Solutions and Optional Orthophotography Services PDF No Measure N/A N/A N/A

CBE NoMeasure      

SBE No Measure

CBE No Measure             

SBE No Measure

N/A
8/14/14 E14-PWWM-07 CEI Services & FDOT LAP Compliance Services for the Tamiami Canal Bridge Replacement PDF 8.6% DBE Goal N/A N/A N/A No Measure No Measure N/A
8/1/14 E14-SEA-01R Professional Services Agreement for A&E Services for Management Financial Consulting and Bond
Engineering Services
PDF 6% CBE Goal
SBE No Measure
PDF N/A PDF

6% CBE Goal

SBE No Measure

6% CBE Goal

SBE No Measure

N/A
7/25/14 E14-WASD-03 Professional Engineering Services Relating to The Operations and Maintenance of The Water and 
Sewer Department’s Water System
PDF 32% CBE Goal PDF N/A PDF

1% SBE Goal

32% CBE Goal

1% SBE Goal

32% CBE Goal

N/A
7/21/14 E14-PWWM-01 Non-Exclusive Professional Services Agreement for Roadway Improvements to West Dixie Highway from NE 164th Street to NE 173rd Street PDF 7% CBE Goal PDF N/A N/A

1st Tier Setaside

100% CBE Goal

1st Tier Setaside

100% CBE Goal

N/A
7/21/14 E14-PWWM-03 Non-Exclusive Professional Services Agreement for Roadway Improvements for NW 97 Ave from NW 58th Street to NW 70th Street PDF 8% CBE Goal PDF N/A N/A

1st Tier Setaside

100% CBE Goal

1st Tier Setaside

100% CBE Goal

N/A
7/11/14 DB14-PWWM-01 Design-Build Services for The Venetian Causeway Bridge Rehabilitation - Street Bridge # 874459 PDF

No Measure SBE  

No Measure CBE  

Trade Set-Aside

PDF N/A N/A

No Measure SBE  

No Measure CBE 

Trade Set-Aside – Pavement Markings and Traffic Signage

No Measure SBE

No Measure CBE

Trade Set-Aside – Pavement Markings and Traffic Signage

N/A
5/20/14 A14-JHS-02 Consultant Services for Functional Space Programming, Comprehensive Design, Procurement And Constructional Administration Services for a New Rehabilitation Hospital PDF 9% CBE Goal PDF N/A PDF 18% CBE Goal 18% CBE Goal N/A
5/5/14 A14-ISD-01 GOB ESP Professional Services Agreement  for the Mental Health Facility Renovation PDF 14% CBE Goal PDF N/A N/A 28% CBE Goal 28% CBE Goal N/A
4/4/14 E14-PWWM-05 Design Services for The Replacement of the North Miami Ave North of NW 146th Street Bridge PDF 10% CBE Goal PDF N/A PDF 1st Tier Set Aside -100% 1st Tier Set Aside-100% N/A
4/4/14 E14-PWWM-06 Design Services for The Replacement of the NW 32nd Ave and NW 151st Street Bridge # 874032
E14-PWWM-06 – Project Package
PDF 10% CBE Goal PDF N/A PDF

1st Tier Set Aside

1st Tier Set Aside N/A
4/4/14 E14-WASD-01 Professional Engineering and Geological Services for Water, Wastewater and Reclaimed Water  Planning Services PDF 25% CBE Goal PDF N/A N/A 30% CBE Goal 30% CBE Goal N/A
3/27/14 E13-SEA-04 Non-exclusive Professional Services Agreement for Marine Infrastructure Services PDF 15% CBE Goal PDF N/A N/A 15% CBE Goal 15% CBE Goal N/A
3/25/14 E14-PW-02 Non-exclusive Professional Services Agreement for Roadway Improvements to NW 58th Street from NW 97th Ave to SR-826 PDF 11% CBE Goal PDF N/A PDF 100% 1st Tier Setaside 100% 1st Tier Setaside N/A
3/14/14 E14-SEA-01 Non-Exclusive Professional Services Agreement for Management Financial Consulting and Bond Engineering Services PDF 4% CBE Goal PDF N/A N/A 6% CBE Goal 6% CBE Goal N/A
3/11/14 DB14-WASD-01 Design-Build Services for Replacement of 72-inch Sanitary Sewer Force Main along NW/NE 159th Street between NW 17th Ave and NW 10th Ave PDF 25% CBE Goal
                              10% CSBE Goal
PDF N/A PDF

15.50% CSBE Goal

10% CWP Goal

30% CBE Goal

15.50% CSBE Goal

10% CWP Goal

30% CBE Goal

N/A
3/10/14 A14-JHS-01 Consultant Services for the JHS West Wing 9th, 10th and 11th Floor Modernization PDF 30% CBE Goal PDF N/A N/A 1st Tier Set aside - 100% 1st Tier Set aside - 100% N/A
3/7/14 E13-WASD-11 Owner’s Representative for Professional Engineering Services relating to the State of Florida’s 
Ocean Outfall Legislation and Miami-Dade County’s Wastewater System
PDF 22% CBE Goal PDF N/A PDF 28% CBE Goal 28% CBE Goal N/A
1/31/14 A14-CUA-01 Professional Services Agreement for Architecture & Engineering Services PDF 15% CBE Goal PDF N/A PDF 20% CBE Goal 20% CBE Goal N/A
1/28/14 E13-WASD-10 Capacity Management, Operation, and Maintenance Services Related to the Consent Decree PDF 19% CBE Goal PDF N/A PDF 25% CBE Goal 25% CBE Goal N/A
1/17/14 E14-SEA-01 Non-exclusive Professional Services for Management Financial Consulting and Bond Engineering Services PDF 5% CBE Goal TBD N/A N/A 5% CBE Goal 5% CBE Goal N/A
12/20/13 E13-RER-02 Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities PDF 12% CBE Goal (on each of the six (6) Agreement) PDF N/A N/A 14% CBE Goal 14% CBE Goal N/A
12/17/13 A13-MDAD-01 ESP MIA Concourse H Roof Replacement and Miscellaneous Repairs PDF 30% CBE Goal PDF N/A PDF 1st Tier Set Aside 100% 1st Tier Set Aside 100% N/A
12/16/13 A13-MDAD-02 ESP MIA Building 863 Roof Replacement PDF 30% CBE Goal PDF N/A PDF 1st Tier Set Aside 100% 1st Tier Set Aside 100% N/A
12/5/13 DB13-WASD-03 Design-Build Services for Replacement of Water Mains and Service Conversions in The Shenandoah Area (Phase A) PDF 20% CBE Goal
                              16% CSBE Goal
PDF N/A N/A

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

N/A
12/5/13 DB13-WASD-04 Design-Build Services for Replacement of Water Mains and Service Conversions in The Shenandoah Area (Phase B) PDF 20% CBE Goal
                              16% CSBE Goal
PDF N/A N/A

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

N/A
12/2/13

A13-SEA-02 (Resubmittal)

Professional Services Agreement for Architectural and Engineering Services for PortMiami Cruise Terminals PDF 15% CBE Goal PDF N/A PDF 15% CBE Goal 15% CBE Goal N/A
12/2/13 A13-SEA-04 Professional Services Agreement for Architectural and Engineering Services for PortMiami Cruise Terminals PDF Tier II CBE Set-Aside (exemption of T.C. 5.05) PDF N/A PDF

Set Aside Tier 2 (w/exempt)

100% CBE Goal

Set Aside Tier 2 (w/exempt)

100% CBE Goal

N/A
11/8/13 A13-ISD-04 GOB Professional Services Agreement for Surveying and Implementation of Stephen P. Clark Center – ADA Barrier Removal PDF 100% CBE Set-Aside PDF N/A PDF 1st Tier Set Aside 1st Tier Set Aside N/A
11/8/13 A13-CUA-02 Professional Services Agreement for A&E Services
PDF 10% CBE Goal PDF N/A PDF 28% CBE Goal 28% CBE Goal N/A
11/7/13 E13-WASD-05 Design Services for Wastewater Treatment Plants Related to Consent Decree Projects PDF 25% CBE Goal PDF N/A PDF 30% CBE Goal 30% CBE Goal N/A
10/11/13 E13-WASD-06 Capacity Management, Operation, and Maintenance Services Related to the Consent Decree Projects PDF 32% CBE Goal PDF N/A PDF 32% CBE Goal 32% CBE Goal N/A
10/11/13 E13-WASD-07 Engineering Services for Geographic Information Systems Utility Backlog Required by the Consent Decree PDF 15% CBE Goal PDF PDF PDF 20% CBE Goal 20% CBE Goal N/A
10/8/13 E13-WASD-04 Design Services for Wastewater Collection and Transmission Systems Related to the Consent Decree Projects PDF 22% CBE Goal PDF N/A PDF

30% CBE Goal

30% CBE Goal N/A
9/10/13 A13-ISD-01  GOB ESP Non-Exclusive Professional Services for the Renovations to the Culmer Neighborhood Service Center PDF Tier 1 CBE Set-Aside TBD N/A PDF TBD TBD N/A
8/26/13 E13-WASD-03 (five (5) Agreements) Design Services for the Implementation of a Pump Station Improvement Program PDF 40% CBE Goal PDF PDF PDF 40%CBE Goal 40% CBE Goal N/A
8/22/13 E13-RER-01 (six (6) Agreements) Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities PDF (1) Tier 2 CBE Set-Aside PDF N/A PDF

1 Agreement -CBE Tier 2 Set-Aside

3 Agreements-9% CBE goal

2 Agreements-No Measure

1 Agreement -CBE Tier 2 Set-Aside

3 Agreements-9% CBE goal

2 Agreements-No Measure

N/A
8/12/13 A13-CUA-01 Professional Services Agreement for A/E Services PDF 20% CBE Goal N/A N/A PDF 28% CBE Goal 28% CBE Goal N/A
8/7/13 P252A-OSC-B702A-J104A-3 MIA Operating System and O & M Oversight Services Consultant (OSC) for the Satellite E & Other MIA APM Operating Systems PDF Bid Waiver & 10% CBE Goal N/A N/A N/A Bid Waiver & 10% CBE Goal 10% CBE Goal N/A
8/1/13 E13-SEA-01 Non-Exclusive Professional Services Agreement for Civil Infrastructure Engineering Services PDF 25% CBE Goal N/A PDF N/A 25% CBE Goal 25% CBE Goal N/A
8/1/13 E13-SEA-02 Non-Exclusive Professional Services Agreement for Civil PDF 18% CBE Goal N/A PDF N/A 18% CBE Goal 18% CBE Goal N/A
8/1/13 E13-SEA-03 Non-Exclusive Professional Services Agreement for Marine Infrastructure Engineering Services PDF 22% CBE Goal N/A N/A N/A 22% CBE Goal 22% CBE Goal N/A
8/1/13 E13-SEA-04 Non-Exclusive Professional Services Agreement for Marine Infrastructure Engineering Services PDF 22% CBE Goal N/A N/A N/A 22% CBE Goal 22% CBE Goal N/A
7/23/13 A13-SEA-03 Non-Exclusive Professional Services Agreement for Architectural and Engineering Services for PortMiami Federal Inspection Facility PDF 19% CBE Goal N/A PDF PDF 19% CBE Goal 19% CBE Goal N/A
7/11/13 DB13-WASD-01 Design-Build Services for Gravity Sewer Interceptors for Pump Station No. 3 PDF 16.5% CBE Goal & 11.2% CSBE Goal N/A N/A PDF 17.50% CBE Goa & 11.20% CBE Goal

17.50% CBE Goal & 11.20% CBE Goall

N/A
7/8/13 A13-ISD-02-GOB Non-Exclusive Professional Services for Preparation of Design Criteria Package for the Mental Health Facility Renovation PDF 25% CBE Goal TBD N/A PDF 28% CBE Goal 28% CBE Goal N/A
7/2/13 A13-MDAD-01 MIA Concourse H Roof Replacement and Miscellaneous Repairs PDF 30% CBE Goal TBD N/A N/A 30% CBE Goal 30% CBE Goal N/A
7/2/13 A13-MDAD-02 MIA Building 863 Roof Replacement PDF 30% CBE Goal TBD N/A N/A 30% CBE Goal 30%CBE Goal  
6/27/13 P252A MIA Satellite E APM System Replacement PDF 12% CBE Goal & Bid Waiver N/A N/A   12% CBE Goal & Bid Waiver 12% CBE Goal & Bid Waiver  
5/15/13 E13-WASD-01-R Non-Exclusive Professional Services Agreement for Program and Construction Management Services Related to the Wastewater System PDF 28% CBE Goal N/A None N/A 28% CBE Goal 28% CBE Goal N/A
5/15/13 E13-WASD-02-R Non-Exclusive Professional Services Agreement for Program and Construction Management Services for the Implementation of a Pump Station Improvement Program PDF 29% CBE Goal N/A None N/A 29% CBE Goal 29% CBE Goal N/A
5/14/13 A13-SEA-02 Architectural and Engineering Services for PortMiami Cruise Terminals PDF 15% CBE Goal PDF None PDF 15% CBE Goal 15% CBE Goal N/A
5/2/13 123203-13-002 Ives Estate District Park – Multipurpose Synthetic Field and Scoreboard PDF 23% CBE Goal TBD PDF N/A 32% CBE Goal 32% CBE Goal N/A
4/18/13 E13-MDAD-02 Pavement Management Systems PDF 20% CBE Goal TBD PDF PDF 15% CBE Goal 15% CBE Goal N/A
4/5/13 EOI-02-08 (Parcel A) Expression of Interest for Development Sites at MIA (Business Park) PDF 10% CBE Goal
                              14.3% CSBE Goal
TBD None N/A 10% CBE Goal
14.35% CSBE Goal
10% CBE Goal
14.35% CSBE Goal
N/A
4/5/13 EOI-02-08 (Parcel B) Expression of Interest for Development Sites at MIA (Convenience Center) PDF 10% CBE Goal
                              14.3% CSBE Goal
TBD None N/A 10% CBE Goal
14.35% CSBE Goal
10% CBE Goal
14.35% CSBE Goal
N/A
4/5/13 EOI-02-08 (Parcel C) Expression of Interest for Development Sites at MIA (Hospitality Center) PDF 10% CBE Goal
                              14.3% CSBE Goal
                              1% SBE Goal
TBD None N/A 10% CBE Goal
14.3% CSBE Goal
1% SBE Goal
10% CBE Goal
14.35% CSBE Goal
1% SBE Goal
N/A
4/2/13 E13-WASD-02 Non-Exclusive Professional Services Agreement for Program and Construction Management Services for the Implementation of a Pump Station Improvement Program PDF 19% CBE Goal TBD PDF TBD 24% CBE Goal 24% CBE Goal N/A
4/2/13 E13-WASD-01 Non-Exclusive Professional Services Agreement for Program and Construction Management Services Related to the Wastewater System PDF 12% CBE Goal TBD PDF TBD 18% CBE Goal 18% CBE Goal N/A
3/25/13 A13-SEA-01 Professional Services Agreement for Port Miami Portwide Wayfinding PDF 25% CBE Goal PDF N/A PDF 25% CBE Goal 12% CBE Goal N/A
3/22/13 E13-MDT-01 Miami-Dade Transit Fiscal Year 2015-2024 Transit Development Plan PDF 4% CBE Goal TBD N/A PDF PDF 25% CBE Goal N/A
3/18/13 E13-MDAD-01 Aviation Planning Consultant Services PDF 15% CBE Goal None N/A N/A 15% CBE Goal 15% CBE Goal N/A
3/5/13 A12-HT-01 Professional Services Agreement For A&E Services
PDF 10% CBE Goal PDF PDF PDF Tier 1 CBE Set-Aside 28% CBE Goal PDF
1/18/13 A12-SEA-01 Professional Services Agreement For Architectural and Engineering Services for The Port of Miami Cruise Terminals and Central Examination Facilities PDF 14% CBE Goal PDF PDF N/A 15% CBE Goal 15% CBE Goal N/A
1/17/13 DB12-WASD-01 Replacement of Existing 54” Sanitary Sewage FM Pipeline from CDWWTP to Fisher Island Under Norris Cut Channel PDF

20% CBE

11% CSBE Goal

PDF N/A PDF

22% CBE Goal

10.9% CSBE Goal

22% CBE Goal

10.9% CSBE Goal

N/A
12/10/12 e12-PWWM-03 Miscellaneous Professional Services Agreements to Provide Materials Testing/Consulting/Training Services PDF No Measure N/A N/A N/A No Measure – Pool PSA No Measure – Pool PSA  N/A
12/10/12 e12-PWWM-02 Miscellaneous Professional Services Agreements to Provide Soils, Foundations, and Materials Testing Services PDF No Measure N/A N/A N/A No Measure – Pool PSA No Measure – Pool PSA  N/A
12/10/12 e12-PWWM-01 Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying PDF No Measure N/A N/A N/A No Measure – Pool PSA No Measure – Pool PSA  N/A
11/24/12 A12-CUA-02 Miscellaneous Professional Services Agreement for A&E Services PDF No Measure PDF PDF PDF Tier 1 CBE Set-Aside (Exemption for Specialty Services) 10% CBE Goal PDF
11/13/12 DB12-ISD-01 Design-Build Services for the New MDPD Academy Building PDF 28% CBE Goal & 21% CSBE Goal N/A N/A N/A 28% CBE Goal (resubmittal – 5/11/2011) 21% CSBE Goal (resubmittal – 5/11/2011) 28% CBE Goal (resubmittal – 5/11/2011) 21% CSBE Goal (resubmittal – 5/11/2011) N/A
11/07/12 A12-CUA-02 Professional Services Agreement for Architectural and Engineering  Services PDF 10% CBE Goal PDF N/A PDF TBD TBD  
10/05/12 E12-SEA-03 Nonexclusive Professional Services Agreement for Port of Miami Deep Dredge Monitoring Services PDF  8% CBE Goal PDF  N/A PDF  TBD  8% CBE Goal  N/A
10/05/12 E12-WASD-04 CONTRACT ADMINIS. AND CONSTRUCTION MANAGEMENT SERVICES - REPLACEMENT OF THE
54-INCH SANITARY SEWAGE FORCE MAIN PIPELINE WITH A 60-INCH SANITARY SEWAGE FORCE MAIN PIPELINE
FROM FISHER ISLAND (UNDER THE NORRIS CUT), TO THE CDWTP AT VIRGINIA KEY (SIC 871)
PDF 25% DBE Goal PDF N/A N/A 27% CBE Goal 27% CBE Goal  N/A
09/18/12 ITB-MDAD-04-12 (A&E) Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 PDF 22.24% CBE Goal PDF N/A N/A 35% CBE Goal 35% CBE Goal  
09/18/12 ITB-MDAD-04-12 (A&E-CIS) Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 PDF 35% CBE Goal PDF N/A N/A 27% CBE Goal 27% CBE Goal  
09/18/12 E12-WASD-03 Non-Exclusive Professional Services Agreement for a Program Management Consultant and Related Services PDF 10% CBE Goal PDF PDF PDF 25% CBE Goal 25% CBE Goal  
08/06/12 E12-SEA-02 Non-Exclusive Professional Services Agreement for Geographic Information System Services PDF 20% CBE Goal PDF N/A PDF 20% CBE Goal 20% CBE Goal  
06/21/12 E12-MPO-03 Non-Exclusive Professional Services Agreement (PSA) for the Regional Transportation Plan for Southeast Florida (2040 RTP) Program
PDF 8.6% DBE Goal PDF N/A N/A 8.6% DBE Goal 25% CBE Goal  
06/18/12 E12-MPO-01 Non-Exclusive Professional Services Agreement (PSA) for the 2040 Long Range   Transportation Plan PDF 8.60% DBE Goal PDF N/A N/A 8.60% DBE Goal 8.60% DBE Goal  
06/16/12 E12-SEA-01 Cargo Gate Modifications and Improvements PDF 25% CBE Goal PDF N/A N/A 25% CBE Goal 25% CBE Goal  
05/16/2012 E11-PWWM-01 Bond Engineering Services PDF 16% CBE Goal PDF N/A PDF No Measure-Insufficient Availability No Measure-Insufficient Availability  
04/25/2012 E12-WASD-02 Non-exclusive Professional Services for the Replacement/Rehabilitation
   of a 72-inch Sanitary Sewage Force Main along NW/NE 159th Street between
   NW 17th Ave and NE 10th Ave
PDF 15% CBE Goal PDF N/A PDF Tier 1 CBE Set-Aside 25% CBE Goal  

02/22/2012

DB10-GSA-01

Design-Build Services for the New MDPD Academy Building

PDF

28% CBE Goal
21.10% CSBE Goal

N/A

N/A

N/A

28% CBE Goal
21.10% CSBE Goal

28% CBE Goal
21.10% CSBE Goal

N/A

12/30/2011

DB10-GSA-02

Design Build Services to Renovate/Retrofit Existing Mental Health Facility

PDF

12% CBE Goal & 21% CSBE Goal

PDF

Resubmittal

TBD

15% CBE Goal
21% CSBE Goal
11.5% CWP Goal

15% CBE Goal 21% CSBE Goal 11.5% CWP Goal

N/A

11/28/2011

E11-SEA-03

Non-Exclusive Professional Services for Program Management Consultant (PMC)

PDF

14% CBE Goal

PDF

PDF

PDF

19% CBE Goal

19% CBE Goal

Comments

09/31/11

E03-SEA-05-2

Area 2 (Bay 177-183) Construction of Seawall

PDF

No Measure - Awarded

N/A

N/A

N/A

No Measure - Awarded

No Measure - Awarded

N/A

09/28/2011

E11-MDAD-02

Stormwater Master Plan

PDF

5% CBE Goal

PDF

N/A

PDF

5% CBE Goal

5% CBE Goal

N/A

08/16/11

A11-OCI-01

Non-Exclusive Professional Services Agreement for Construction Inspection Services (CIS)

PDF

(Two Agreements) -  i. 1st  Tier CBE Set-Aside    ii. 30% CBE Goal

PDF

N/A

PDF

(Two Agreements) - 1st Tier CBE Set-Aside & 30% CBE Goal

(Two Agreements) - 1st Tier CBE Set-Aside & 30% CBE Goal

N/A

07/19/2011

A11-SEA-02

Non-Exclusive Professional Services Agreement for Portwide Wayfinding

PDF

25% CBE Goal

PDF

N/A

PDF

25% CBE Goal

25% CBE Goal

N/A

06/21/11

A11-PARK-01 GOB ESP

Westchester Cultural Arts Center

PDF

15.4% CBE Goal

PDF

N/A

PDF

27% CBE Goal

27% CBE Goal

Industry Feedback

06/03/2011

E11-SEA-01

No Exclusive Professional Services for Environmental Services

PDF

30% CBE Goal

PDF

N/A

PDF

30% CBE Goal

30% CBE Goal

N/A

05/24/2011

A11-GSA-01 GOB ESP

Design Services for Renovation/Expansion of History Miami

PDF

18% CBE Goal

PDF

A11-GSA-01 GOB ESP – Resubmittal

PDF

Project Canceled

Project Canceled

Standing Review Committee deferred item for further analysis

05/20/2011

A11-SEA-03

Cruise Terminal F & G Remodeling

PDF

23% CBE Goal

PDF

N/A

PDF

1st Tier CBE Set-Aside

1st Tier CBE Set-Aside

N/A

If you cannot view PDF Get Acrobat! files, you can download Acrobat Reader  for free from Adobe Systems, Inc. In order to use PDF files, you must have Acrobat installed on your computer.

Back to Top Page Last Edited: Fri Dec 12, 2014 4:15:22 PM
business
Business Development
 
 
Corner
Corner

You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.

Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.