DERM Permit Applications
|
|
This permit is needed for:
|
Permit Application
|
FAQs
|
| Aboveground storage tank installation (within a structure) |
N/A |
FAQs |
| Aboveground storage tank installation for emergency generator |
N/A |
FAQs |
| Aircraft Dismantling |
IW5 Permit  |
N/A |
| Air pollution sources - required prior to the construction or modification of any facility or emissions unit |
Miami-Dade County Air-Construction Permit |
FAQs |
| Air pollution sources - required for the operation of any facility or emissions unit |
Miami-Dade County Air-Operating Permit |
FAQs |
| Asbestos-containing materials - needed before all demolition projects & any renovation where asbestos might be disturbed |
Notice of Asbestos Renovation or Demolition 
Affidavit for Asbestos Survey |
FAQs |
| Boat docking and storage facilities |
Marine Facilities Operating Permit |
FAQs |
| Biomedical waste - storage and/or processing |
Solid Waste Permit Application |
FAQs |
| Coastal construction projects such as installation or repair of docks, piers, pilings, moorings, marinas, boatlifts, davits, seawalls, and seawall caps. A Class I permit is required prior to doing any work in, on, over, or upon the tidal waters of Miami-Dade County or any of its incorporated municipalities |
Class I |
FAQs |
| Construction within non-tidal canals, canal rights-of-way, canal maintenance easements & reservations |
Class III Permit |
FAQs |
| Demolition disposal business or transfer/recycling facility - construction and operation |
Solid Waste Permit Application |
FAQs |
| Dewatering or whenever water is removed from an excavation or depressed ground |
Class V Permit |
FAQs |
| Dock(s) construction, installation or repair (including piers, pilings, moorings, marinas, boatlifts, davits, seawalls, and seawall caps). A Class I permit is required prior to doing any work in, on, over, or upon the tidal waters of Miami-Dade County or any of its incorporated municipalities |
Class I |
FAQs |
| Drainage construction in non-residential sites or landfills, remedial waste sites, etc |
Class VI Permit |
|
| Drainage construction with outfalls or connection to an existing outfall |
Class II Permit  |
FAQs |
| Elevation of new structures and substantially improved or damaged structures (elevation certificate) to show your structure is built in compliance with the National Flood Insurance Program (NFIP) - mandatory for all |
Flood Elevation Certificate 
Flood Proofing Bulletin 
|
FAQs |
| Grease waste to the sewer system-flow is less than 25,000 gpd |
Grease Discharge Operating Permit |
FAQs |
| Hazardous & biohazardous waste transport-waste oil, septic waste, waste radiator fluid, photographic chemicals & other non-hazardous industrial waste |
Liquid Waste Transporter |
FAQs |
| Hazardous materials or hazardous waste - large user or generator |
Industrial Facilities (IW-O) Permit |
FAQs |
| Hazardous material or hazardous waste - small user or generator, facilities include mechanical repair facilities, machine shops, paint & body shops, chemical storage facilities, x-ray & photo developing facilities, printers & salvage yards |
IW5 Permit |
FAQs |
| Industrial pretreatment facility - a new facility to be constructed or significant changes to an existing facility |
Industrial Pretreatment Facility Construction Permit |
FAQs |
| Industrial pretreatment facility modifications being made to existing facilities |
Minor Revision to an Industrial Pretreatment Facility |
FAQs |
| Lake fill |
Solid Waste/Lake Fill |
FAQs |
| Wellfield protection areas not served by sanitary sewers – Construction within this area |
IW6 Permit |
FAQs |
| Land use - non-residential, within major wellfield protection areas not served by sanitary sewers. |
IW6 Permit |
FAQs |
| Mangrove trimming or removal and any project that involves filling or the placement of fill in coastal or mangrove wetlands. A Class I permit is required prior to doing any work in, on, over, or upon the tidal waters of Miami-Dade County or any of its incorporated municipalities. |
Class I |
FAQs |
| Mulching or composting facility - construction and operation |
Solid Waste Permit Application |
FAQs |
| Ozone-depleting compounds (ODCs) including, but not limited to, Freon (R-12 and R-22) - needed to purchase, sell, handle |
Stratospheric Ozone Protection Operating Permit |
FAQs |
|
| Privately owned or operated sanitary sewer systems - operation |
Private Sanitary Sewer Operating Permit |
FAQs |
| Renovation or demolition projects where Asbestos material(s) might be present or disturbed |
Notice of Asbestos Renovation or Demolition 
Affidavit for Asbestos Survey |
FAQs |
| Sewer pipes and pump stations (new construction OR modification of existing) |
Construct a Domestic Wastewater Collection/transmission System |
FAQs |
| Sewer system able to handle the additional flow - all applicants need this before building permit is issued |
Sewer Capacity Certification (Allocation Letter)  |
FAQs |
| Sewage treatment plants (commercial greater than 5,000 gallons per day/ residential greater than 10,000 gallons per day & a public sewer system is neither operable nor available within ¼ mile of operation) - construction |
Interim Domestic Wastewater Permit |
FAQs |
| Storage tank - abandonment of a storage tank: aboveground or underground |
Storage Tank Abandonment Application |
FAQs |
| Storage tank - removal of a storage tank: aboveground or underground |
Storage Tank Removal Application  |
FAQs |
| Surface Water Management Standard General Permit (Environmental Resource Permit) |
ERP Permit (Surface Water Management Permit) |
FAQs |
| Tire processing or collection |
Solid Waste Permit Application |
FAQs |
| Trees-cutting down, bulldozing, removal or relocation in Miami-Dade County, except for certain exemptions. |
Tree Removal Permit Application - English & Spanish  |
FAQs |
| Vapor recovery systems at motor vehicle refueling facilities - needed for installation & operation |
Vapor Recovery Construction/Operating Permit |
FAQs |
| Water treatment plants - construction for community systems |
Potable Water Supply Operating Permit 
PWO - Permit Application Package 
|
FAQs |
| Wellfield protection areas not served by sanitary sewers – Construction within this area |
IW6 Permit |
FAQs |
| Wetlands (Freshwater) - a Permit is required for direct and indirect impacts to freshwater wetlands including clearing, filling and/or demucking |
Class IV Application Package 
Class IV Application Form
|
FAQs |