bullet Bicycle/Pedestrian Plan Update 2007
bullet

Started in September 2007 by Gannett Fleming. This will prepare an update to the MPO’s Bicycle and Pedestrian plans including a vision, measurable goals and objectives, long range element and short range element. Topics include on- and off-road networks, prioritized pavement and trail projects, bike parking, Bike & Ride, safe routes to school, municipal coordination, encouragement and safety. It is expected to be completed in October 2008, and cost approximately $100,000. Contact David Henderson at 305.375.1647 for complete details.

bullet Bus on Shoulder Evaluation Study 2007 NEW!
bullet

Started in September 2007 by Parson Transportation Group. This study will evaluate the operation of the “Bus on Shoulder” pilot project implemented along SR-874 (Don Shula Expressway) and SR-878 (Snapper Creek Expressway). It is expected to be completed in July 2008, and cost approximately $60,000. Contact Jesus Guerra at 305.375.2069 for complete details.

bullet Central Dade Transport Zone 2007
bullet

Started in September 2007 by Kimley-Horn & Associates. This study looks at upgrading the infrastructure along the Miami River, Miami International Airport, the FEC Rail Yard, the Warehouse District, the Free-Trade Zone and look at expansion of road facilities throughout the district. It is expected to be completed in August 2008, and cost approximately $80,000. Contact Larry Foutz at 305.375.1522 for complete details.

bullet Countywide Traffic Safety Program 2007
bullet

Work being performed by Miami-Dade Public Works Department and the University of Florida, a joint effort. Tentative completion in October 2008. Contact David Henderson at 305.375.1647 for complete details.

bullet CSX Corridor Evaluation Study 2009 NEW!
bullet

This study will evaluate the feasibility of re-directing rail freight traffic outside the urbanized Kendall area and examine various concepts to introduce rapid transit service along the CSX rail corridors south of the Oleander Junction. Tentative completion in March 2009, and cost approximately $140,000. Contact Wilson Fernandez at 305.375.1647 for complete details.

bullet Health District Comprehensive Traffic Study 2008 NEW!
bullet

Started in February 2008 by The Corradino Group. This study would document the traffic impacts of both the recent and forecast growth within the Health District/Civic Center Area. It is expected to be completed in November 2008, and cost approximately $170,000. Contact Larry Foutz at 305.375.1522 for complete details.

bullet Left Turn Via 3 Rights Study 2007
bullet

Started in September 2007 by David Plummer & Associates. This study will address the potential of increasing efficiency and capacity at major intersections in Miami-Dade County through the elimination of left turns and replacing them with right turn loops. Work is expected to be completed in July 2008, and cost approximately $55,000. Contact Wilson Fernandez at 305.375.1886 for complete details.

bullet Miami-Dade Freight Plan 2007
bullet

Started in September 2007 by Gannett Fleming. The objective of this study is to develop a freight master plan that will feed projects into the Long Range Transportation Plan. It is expected to be completed in December 2008, and cost approximately $75,000. Contact Larry Foutz at 305.375.1522 for complete details.

bullet Miami Civic Center Circulator Study Phase II, 2006
bullet

Started in June 2006, in conjunction with the City of Miami's Office of Grant Administration. As a continuation of Phase I, it will focus in more detail on implementation, routes and cost estimates, contractual management and operation options analysis, and financing plan. Tentative completion in December 2008, and cost approximately $48,000. Part of the Municipal Grant Program. Contact Larry Foutz at 305.375.2069 for complete details.

bullet North Miami Beach US-1/NE 163rd Street Intersection Study 2007
bullet

Work to begin December 2007 in conjunction with the City of North Miami Beach. It is expected to be completed in September 2008. Part of the Municipal Grant Program. Contact Oscar Camejo at 305.375.1837 for complete details.

bullet North Miami Bicycle Parking and Transit Circulator Feasibility Study 2007
bullet

This will complete a comprehensive bicycle planning and transit circulator feasibility study to provide better bicycle facilities and identify strategies that will create greater connectivity between bicycle and public transit systems. Tentative completion in September 2008, and cost approximately $55,258. Part of the Municipal Grant Program. Contact David Henderson at 305.375.1647 for complete details.

bullet Senior High School Student Safety Campaign 2007
bullet

Work to be done in-house by MPO Staff. To develop a student pedestrian and vehicular safety campaign program targeting senior high school students. Tentative completion in September 2008, and cost approximately $25,000. Contact David Henderson at 305.375.1647 for complete details.

bullet Service Enhancements to the Hialeah Transit System 2007
bullet

This study examines potential HTS express transit service by examining the existing service with the intention of providing services on less congested roads on the periphery of the city and linking key attractions and destinations. Tentative completion in September 2008, and cost approximately $20,000. Part of the Municipal Grant Program. Contact David Henderson at 305.375.1647 for complete details.

bullet Snapper Creek Trail Segment A 2007
bullet

Started in September 2007 by Kimley-Horn & Associates. This study will help establish ways to bring the existing trail up to current standards for amenities and crossings safety, improve access, and determine best side of canal for new trail portions where needed. It is expected to be completed in August 2008, and cost approximately $55,000. Contact David Henderson at 305.375.1647 for complete details.

bullet South Dade Managed Lanes 2007
bullet

Work began May 2007 by Kimley-Horn & Associates. The objective of this study is to identify reasonable alternatives for developing of managed lanes in the right-of-way of the South Dade Busway and to evaluate the revenue generating potential. It is expected to be completed in August 2008, and cost approximately $80,000. Contact Larry Foutz at 305.375.1522 for complete details.

bullet SW 152nd Street Corridor Study 2007
bullet

Work began March 2007 by Gannett Fleming. Identify alternatives for improving traffic flow along SW 152nd Street, from US-1 to 162nd Avenue. Tentative completion in June 2008 and cost approximately $80,000. Contact Jesus Guerra at 305.375.2069 for complete details.

bullet Transit Hub Evaluation Study 2008 NEW!
bullet

Started in April 2008 by The Corradino Group. Develop a comprehensive transit hub system plan that will best serve transit patrons and ease of travel. It is expected to be completed in March 2009, and cost approximately $60,000. Contact Wilson Fernandez at 305.375.1886 for complete details.

bullet Transportation Innovations in the 21st Century 2007
bullet

Started in 2007 by Center for Urban Transportation Research (CUTR). This study will develop a menu of innovative cutting edge strategies for enhancing the county's transportation system in order to meet current and future transportation needs using strategies that employ state-of the art concepts in the areas of land use, safety, technology and environmental protection. It is expected to be completed in November 2008,  and cost approximately $56,560. Contact Jesus Guerra at 305.375.2069 for complete details.

bullet Transportation System Performance Monitoring 2007
bullet

Started in September 2007 by Gannett Fleming. This study would identify a series of performance measures that can be collected on an annual basis to have a method of tracking changes in the quality and level of service on the transportation system. It is expected to be completed in August 2008, and cost approximately $60,000. Contact Larry Foutz at 305.375.1522 for complete details.

bullet Westchester Traffic Impact Study 2007
bullet

Started in April 2007 by Gannett Fleming. The study will evaluate current and future traffic conditions as a result of new development and roadway improvements in the Westchester area. The area is defined as: Palmetto Expressway to the east, Krome Avenue to the west, S.R. 836 to the north, and Miller Drive/SW 56th Street to the south. It is expected to be completed in July 2008, and cost approximately $54,986. Contact Wilson Fernandez at 305.375.1886 for complete details.

 

 

 
 
Our downloads require Acrobat Reader 7 or higher. Click to install the latest version of Acrobat Reader.
Get updates and notices. NO e-mail required. Click for the MPO Channel: RSS News Feed.
 
Click here to send us e-mail. Or send letters to 111 NW 1 Street, Suite 920, Miami Florida 33128
Click here for comments, suggestions and questions to the webmaster!
 
 

305.375.4507                                                                                             Copyright 1977 © Metropolitan Planning Organization for the Miami Urbanized Area