Congestion Management Process (CMP) Update 2009
PENDING
 |
Pending consultant and project manager.
This study will update the Congestion
Management System (CMS) to reflect the
new Federal requirement established
under SAFETEA-LU. This update will be
incorporated in the 2035 LRTP, as a
planning tool, as recommended in the
2007 Miami-Dade MPO Federal
Certification. It is expected to begin
in May 2009, and cost approximately
$70,000.
Click
to see our list of pending studies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
Model Validation to Cube Voyager 2007
ONGOING
 |
Studied between December 2007 and
January 2008 by
The Corradino Group,
at a cost of approximately $55,000.
To review and validate the Miami-Dade
County model, currently under FSUTMS and
supported with TRANSPLAN, to the new
software engine of FSUTMS called Cube
Voyager. Contact
Larry Foutz
at 305.375.1522 for complete details.
|
|
|
|
|
|
|
|
|
|
|
 |
Transportation System Performance Monitoring
2007 ONGOING
 |
Started in September 2007 by
Gannett Fleming. This study would
identify a series of performance
measures that can be collected on an
annual basis to have a method of
tracking changes in the quality and
level of service on the transportation
system. It is expected to
be completed in August 2008, and cost
approximately $60,000. Contact
Larry Foutz
at 305.375.1522 for complete details. |
|
|
|
|