Ongoing Transportation Studies at Miami-Dade MPO
Text only

Residents

Transportation Partners

MPO Staff
 

Governing Board

Committees

Plans

Programs

Studies

Downloads

 

InteracTIP 2010

TIP with Google Maps!

My Neighborhood

LRTP 2035

Civic Center/Health District

Intermodal Database

Integrated Transportation Information System
 

Cars and Vanpools

Buses, Trains, and Movers

Bicycling and Walking

Freight

Maritime and Aviation
 

Stay current. Subscribe>

Install Viewers.

 
 
Custom MPO Search
 
About Us   Contact Us
 
     
 

Adding Turbo Lanes to T-Intersections Study 2009

ONGOING. Evaluate T-intersections that can be converted to turbo lanes within the county boundaries. Contact Jesus Guerra at 305.375.1647 for complete details.

  • Started May 2009. Expected completion is January 2010.
  • Work by David Plummer & Associates.
  • The budgeted cost is approximately $83,000 including 10% for contingencies.
  • STATUS: 70% complete.

Bicycle/Pedestrian Plan Update 2007

ONGOING. This will prepare an update to the MPO’s Bicycle and Pedestrian plans including a vision, measurable goals and objectives, long range element and short range element. Topics include on- and off-road networks, prioritized pavement and trail projects, bike parking, Bike & Ride, safe routes to school, municipal coordination, encouragement and safety. Contact David Henderson at 305.375.1647 for complete details.

  • Started in September 2007. Expected completion was October 2008.
  • Work by Gannett Fleming.
  • The budgeted cost is $98,711.

Bicycle Boulevard Planning Study 2009

ONGOING. This study will look at ways to improve conditions for bicycling through the development of “bicycle boulevards” within the county. Contact David Henderson at 305.375.1647 for complete details.

  • Started December 2008. Expected completion was October 2009.
  • Work by Kimley-Horn & Associates.
  • The budgeted cost is approximately $85,000.

Community Characteristics Project Phase VI 2009

ONGOING. The objective is to review the social, economic, and geographic characteristics of an area before public involvement (PI) outreach is initiated. Contact Elizabeth Rockwell at 305.375.4507 for complete details.

Congestion Management Process (CMP) Update 2009

ONGOING. This study will update the Congestion Management System (CMS) to reflect the new Federal requirement established under SAFETEA-LU. This update will be incorporated in the 2035 LRTP, as a planning tool, as recommended in the 2007 Miami-Dade MPO Federal Certification. It was expected to end during May 2009, but is still ongoing. Contact Jesus Guerra at 305.375.4507 for complete details.

  • Started in September 2008.
  • Work by Gannett Fleming.
  • The approximate cost is $79,439.
  • STATUS: 90% complete.

Countywide Traffic Safety Program 2008

ONGOING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Started January 2008. Expected completion was December 2008.
  • Work by the University of Florida.
  • The budgeted cost is approximately $100,000.

Cutler Bay Transportation Master Plan 2008

ONGOING. Study the existing and future conditions of the transportation system within the Town of Cutler Bay. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Started September 2008. Expected completion was April 2009.
  • The approximate cost is $100,000.

 

CSX Corridor Evaluation Study 2008

ONGOING. This study will evaluate the feasibility of re-directing rail freight traffic outside the urbanized Kendall area and examine various concepts to introduce rapid transit service along the CSX rail corridors south of the Oleander Junction. Contact Wilson Fernandez at 305.375.4507 for complete details.

Florida East Coast (FEC) Transit Connection Study 2009

ONGOING. This study will provide a status report on recent developments and evaluate the feasibility of implementing transit services along FEC corridor from MIA to the Dadeland area to complement a planned bicycle trail facility also known as the Ludlam Trail project. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Started July 2008.
  • Work by Kimley-Horn & Associates.
  • Expected completion was April 2009. (Ongoing.)
  • The approximate cost is $70,000.
  • STATUS: 85% complete.

Locate Sites for Bus Shelter Installations 2009

ONGOING. Identify sites suitable for the immediate installation of bus shelters. Contact Larry Foutz at 305.375.4507 for complete details.

  • Started November 2008. Expected completion was July 2009.
  • Work by David Plummer & Associates.
  • The approximate cost was $56,448.
  • STATUS: 95% complete.

Miami Beach Master Plan for the 16th Street Corridor Study 2004

ONGOING. A description of this study is forthcoming. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Started September 2004. Expected completion during 2008.

Miami Civic Center Circulator Study Phase II 2007

ONGOING. As a continuation of Phase I, it will focus in more detail on implementation, routes and cost estimates, contractual management and operation options analysis, and financing plan. Contact Larry Foutz at 305.375.4507 for complete details.

  • Started in April 2007. Expected completion was December 2008.
  • Work by The Corradino Group and the City of Miami's Office of Grant Administration.
  • The approximate cost is $48,000. Part of the Municipal Grant Program.

Miami-Dade County Bicycle and Pedestrian Facility Maintenance Program 2008

ONGOING. It's to develop a comprehensive maintenance program to ensure the longevity and safety of greenway trails within the county. Contact David Henderson at 305.375.1647 for complete details.

  • Started in December 2008. Expected completion was September 2009.
  • Work by Florida International University.
  • The approximately cost $80,000.
  • STATUS: 70% complete.

NE Corridor Traffic Flow Implementation Plan Study 2008

ONGOING. This study will implement the improvements specified by the Northeast Miami-Dade Traffic Flow Study 2006. Contact Larry Foutz at 305.375.4507 for complete details.

  • Started in December 2008. Expected completion was September 2009.
  • Work by Kimley-Horn & Associates.
  • The approximate cost is $75,000.
  • STATUS: 85% complete.

North Miami Beach US-1/NE 163rd Street Intersection Study 2007

ONGOING. A description of this study is forthcoming. Contact Oscar Camejo at 305.375.4507 for complete details.

NW 7th Avenue Traffic and Pedestrians Study 2009

ONGOING. A description of this study is forthcoming. Contact Larry Foutz at 305.375.4507 for complete details.

  • Started May 2009. Expected completion is January 2010.
  • Work by The Corradino Group.
  • The budgeted cost is approximately $90,000.
  • STATUS: 75% complete.

Opa-Locka Circulator/Transit Improvement Feasibility Study 2008

ONGOING. Develop a transit system within the limits of the City of Opa-Locka. Alternatives should be developed considering different modes. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Started in December 2008. Expected completion was July 2009.
  • Work by the City of Opa-Locka.
  • The approximate cost is $70,000.
  • STATUS: 50% complete.

Pedestrian Safety at Miami-Dade Regional Parks Study 2009

ONGOING. A description of this study is forthcoming. Contact David Henderson at 305.375.1647 for complete details.

  • Started in May 2009. Expected completion is January 2010.
  • Work by David Plummer & Associates.
  • The cost is $56,496.
  • STATUS: 25% complete.

Pedestrian/Bicycle Safety Study 2007

ONGOING. This study will document existing traffic operations conditions and alternative modes of transportation (bus transit, pedestrian ways, bicycle connections, etc.) at NE 163rd Street and Biscayne Boulevard; and develop feasible alternatives. Contact David Henderson at 305.375.1647 for complete details.

  • Started October 2007. Expected completion was September 2008
  • Work by the City of North Miami Beach.
  • The projected cost is approximately $20,000.

Regional Freight Plan 2008

ONGOING. This study will analyze existing and new data and, in conjunction with the regional visioning process, develop a regional freight strategy and make implementation recommendations. Expected completion is December 2009. Contact Larry Foutz at 305.375.4507 for complete details.

  • Started in May 2008.
  • Work by Kimley-Horn & Associates (via FDOT).
  • The approximate cost is $33,000 (the MPO's share of a tri-regional effort totaling $198,791).
  • STATUS: 95% complete.

Regional Long Range Transportation Plan 2007

ONGOING. A description of this study is forthcoming. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Started December 2007. Expected completion is March 2010.
  • Work by Kittelson and Associates (via FDOT).
  • The estimated cost to the MPO is approximately $150,000 (share of a tri-regional effort totaling $450,000).
  • STATUS: 85% complete.

Senior High School Student Safety Campaign 2008

ONGOING. This study will develop a student pedestrian and vehicular safety campaign program targeting senior high school students. Contact David Henderson at 305.375.1647 for complete details.

Service Enhancements to the Hialeah Transit System 2007

ONGOING. This study examines potential HTS express transit service by examining the existing service with the intention of providing services on less congested roads on the periphery of the city and linking key attractions and destinations. Contact David Henderson at 305.375.1647 for complete details.

South Florida Clean Energy and Greenhouse Gas Emission Reduction Program 2009

ONGOING. It will accelerate the growth and development of alternative fuel fleets, fuel suppliers and awareness in the four county regions. Contact Susan Schreiber at 305.375.4507 for complete details.

Transportation Innovations in the 21st Century 2007

ONGOING. This study will develop a menu of innovative cutting edge strategies for enhancing the county's transportation system in order to meet current and future transportation needs using strategies that employ state-of the art concepts in the areas of land use, safety, technology and environmental protection. The November 2007 completion not reached due to a scope revision, and remains ongoing. Contact Jesus Guerra at 305.375.4507 for complete details.

US-1/SR-878 Intersection Sub-Area Traffic Study 2009

ONGOING. A description of this study is forthcoming. Contact Wilson Fernandez at 305.375.4507 for complete details.

  • Started May 2009. Expected completion is November 2009.
  • Work by David Plummer & Associates.
  • The budgeted cost is approximately $62,000.
  • STATUS: 70% complete.