Aesthetic Guidelines for
Transportation Projects in Miami-Dade County 2009
PENDING. Develop a set of
countywide aesthetic guidelines and best practices to
assist transportation agencies, project managers and
consultants, as to how aesthetics can be incorporated
into transportation projects. Study schedule to be
determined. Contact
Susan Schreiber
at 305.375.4507 for complete details.
- The approximate cost is $80,000.
- STATUS: Pending scope revision.
|
 |
Automated Bicycle Rental System and
Parking Plan 2009
PENDING.
A description of
this study is forthcoming. Contact
David Henderson
at 305.375.1647 for complete details.
- Study schedule to be determined.
- The budgeted cost is
approximately $55,000.
- STATUS:
General Planning Consultants (GPC)
to be selected. (October
2009)
|
 |
Bay Harbor Islands Pedestrian and
Bicycle Master Plan 2009
PENDING.
A description of
this study is forthcoming. Contact Larry
Foutz at 305.375.4507 for complete details.
- Study schedule to be determined.
- Work by
the
Town of Bay Harbor Islands.
- The budgeted cost is $18,665.
- STATUS:
Pending contract negotiation.
(October 2009)
|
 |
Bicycle/Pedestrian Mobility Plan for
the Miami Downtown Development Authority 2009
PENDING.
A description of
this study is forthcoming. Contact David Henderson at 305.375.1647 for
complete details.
- Study schedule to be determined.
- The budgeted cost is
approximately $60,000.
- STATUS:
General Planning Consultant (GPC) to
be selected. (October 2009)
|
 |
Bicycle Safety Education Program 2009
PENDING.
A description of
this study is forthcoming. Contact
David Henderson
at 305.375.1647 for complete details.
- Study schedule to be determined.
- Work by
University of Miami.
- The budgeted cost is approximately $50,000.
- STATUS: Pending contract
negotiation. (October 2009)
|
 |
City of Doral Transportation Master
Plan Update 2009
PENDING.
A description of
this study is forthcoming. Contact
Oscar Camejo at
305.375.4507 for complete details.
- Study schedule to be determined.
- Work by the
City of Doral.
- Budgeted cost is approximately $40,000.
- STATUS: Pending contract
negotiation.
|
 |
City of Miami Feasibility Study to
Implement Car-Sharing Programs 2009
PENDING.
Conduct a feasibility study to implement car-sharing
program in the City of Miami. Contact Jesus Guerra
at 305.375.4507 for complete details.
- Study schedule is to be determined.
- Work may be performed by the
City of Miami
or a consultant or through the Miami-Dade
County's
Equitable Distribution Program (EDP).
- The approximate cost is $25,000.
- STATUS: Funding
not available. Conductor of study to be
determined. (November 2009)
|
 |
Comprehensive Parking Study for
Freight Transport in Miami-Dade County Study 2009
PENDING.
A description of
this study is forthcoming. Contact
Larry Foutz at 305.375.4507 for complete details.
- Study schedule to be determined.
- The budgeted cost is approximately
$65,000.
- STATUS: General
Planning Consultant (GPC) to be selected.
|
 |
Countywide High-Crash Location Safety
Study 2009
PENDING.
A description of
this study is forthcoming. Contact
Wilson Fernandez
at 305.375.4507 for complete details.
- Study schedule to be determined.
- Work by Miami-Dade Public Works.
- The budgeted cost is approximately $75,000.
- STATUS: Pending contract
negotiation. (October 2009)
|
 |
Countywide Park and Ride Facilities
Study 2009
PENDING.
A description
of this study is forthcoming. Contact Wilson Fernandez
at 305.375.4507 for complete details.
- Study schedule is to be determined.
- The budgeted cost is approximately $35,000.
- STATUS:
Equitable Distribution Program (EDP)
firm to be
selected. (October 2009)
|
 |
Evaluation of Miami-Dade Transit's
Trunk and Feeder Bus System Study 2009
PENDING.
The objective of this study is to evaluate the Trunk and
Feeder Bus System to be implemented by
Miami-Dade Transit (MDT). Contact Jesus Guerra
at 305.375.4507 for complete details.
- Study schedule to be determined.
- The budgeted cost is approximately $85,000.
- STATUS: On-hold until
February 2010, awaiting route changes by
MDT. (November
2009)
|
 |
Hialeah Transit System Express Service
Feasibility Study 2009
PENDING.
A description
of this study is forthcoming. Contact Wilson Fernandez
at 305.375.4507 for complete details.
- Study schedule to be determined.
- Work by the City of Hialeah.
- STATUS:
Pending contract negotiation.
(October 2009)
|
 |
Improving Regional Transportation
Planning 2009
PENDING. This study would document the traffic
impacts of both the recent and forecast growth within
the Health District/Civic Center Area. Contact
Susan Schreiber at 305.375.4507 for
complete details.
|
 |
InteracTIP Project Tracking System 2010
PENDING.
The proposed system would supplement the on-line
capabilities of the
InteracTIP to allow users to see the status of
projects that are in previous
TIPs. The application
would be integrated with the existing
InteracTIP
process. It would be capable of: 1) identifying capacity
related construction projects over $500,000 that
appeared programmed on the first year of the FY 2005
TIP and have yet to
begin deployment phases; 2) identifying a maximum of 30
projects to be included in this process that are still
pending for completion; 3) monitoring the status of the
selected projects on a quarterly basis or as determined
by the MPO project manager; and, 4) providing a tool for
listing the reasons for projects delay. Contact
Carlos Roa at
305.375.4507 for complete details.
- Study schedule
to be determined.
- The budgeted
cost is
approximately $58,000.
- STATUS:
General Planning
Consultant (GPC) to
be selected.
(October 2009)
|
 |
Medley NW 116th Way Corridor Study
2009
PENDING.
A description of
this study is forthcoming. Contact
Larry Foutz at
305.375.4507 for complete details.
- Study schedule to be determined.
- Work by
the Town of Medley.
- The budgeted cost is $31,335.
- STATUS: Pending contract
negotiations. (October 2009)
|
 |
Miami Springs 36th Street District
Traffic Impact Study 2010
PENDING. Analyze impacts
on traffic in
Miami Springs
along NW 36th Street. Study schedule to be determined. Contact
Wilson Fernandez at 305.375.4507 for complete
details.
- The budgeted cost is approximately
$20,000.
- STATUS: Pending
consultant negotiation.
|
 |
Miami-Dade Most Dangerous Locations
for Elderly Pedestrians 2009
PENDING.
A description of
this study is forthcoming. Contact
David Henderson
at 305.375.1647 for complete details.
|
 |
Online Safe Routes to School Pilot
Program 2009
PENDING.
A description
of this study is forthcoming. Contact
David Henderson
at 305.375.1647 for complete details.
- Study
schedule to
be
determined.
- Work by
Florida International University.
- The
budgeted cost
is
approximately $75,000.
- STATUS:
Pending
contract
negotiation.
(October
2009)
|
 |
Opa-Locka Sound Barrier Alternatives
Study 2008
PENDING. This study will evaluate sound barrier
alternatives for alleviating noise conditions along the
South Florida rail corridor within the
City of
Opa-Locka. Contact Jesus
Guerra at 305.375.4507 for complete details.
- Study schedule to be
determined.
- Budgeted cost is
approximately $65,000.
- STATUS:
Pending funds
from
FDOT.
|
 |
Safe Routes to School Program Study
2009
PENDING.
A description of
this study is forthcoming. Contact David Henderson
at 305.375.1647 for complete details.
-
Study schedule to be determined.
-
Work by the
Village of Palmetto Bay.
-
The budgeted cost is approximately $40,000.
-
STATUS: Pending contract
negotiation. (October 2009)
|
 |
Web-based Bicycle Route Planning Tool 2009
PENDING.
A description of
this study is forthcoming.
Contact
David Henderson at 305.375.1647 for
complete details.
-
Study schedule to be determined.
-
Work by the
Florida
International University.
-
The approximate cost was $50,000.
-
STATUS: Pending contract
negotiation. (October 2009)
|
 |
Update of the Miami-Dade County GIS
Crash Data System 2009
PENDING.
To update the crash data system with the 2009 Florida
Department of Highway Safety and Motor Vehicles crash
data. Miami-Dade County receives data and scanned images
of crash reports on monthly basis. The
University of Florida (UF) team will obtain,
cleanse, standardize, map and upload the 2009 crash data
into the Miami-Dade crash data system. All crash data,
including bicycle and pedestrian, will be processed. In
addition, the
UF team will train county personnel in the
aforementioned processes as well as update the crash
data system with any new features that may be available
as system is improved. Contact
Carlos Roa at
305.375.4507 for complete details.
|
 |
|
|
| |
|
|