News Release Header
For Immediate Release:
January 06, 2012

Media Contact:
Delfin A. Molins
delfin@miamidade.gov
305-375-1682
305-781-1430



WEEK OF JANUARY 9, 2012 THROUGH JANUARY 17, 2012

ROADWAY CONSTRUCTION REPORT


(Miami-Dade County, FL) -- 
 

  DRIVE SAFELY!

 

SPECIAL EVENT:

 

No Special Event planned for this week on the Venetian or Rickenbacker Causeways.

 

RAILROAD CROSSING CLOSURES:

 

No Railroad crossing planned for rehabilitation this week.

 

ROADWAY CLOSURES REQUESTED BY FLORIDA DEPARTMENT OF

TRANSPORTATION:

 

State Road (SR) 112 (AKA I-195) over North Miami Avenue; FDOT FIN No. 405578-1-52-01: Please note that for safety reasons in order to comply with OSHA regulations the Florida Department of Transportation (FDOT) has requested the partial and/or full closure of North Miami Avenue at SR 112 (AKA I-195) overpass beginning on Monday, July 18, 2011 through March 31, 2012.  The FDOT's project consists of widening the mainline and bridges of the SR 112 (AKA I-195).  Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

TRAFFIC ALERT:

 

Cocoplum Circle/LeJeune Road/Sunset Drive, Project No. 20100388 Work Order No. 15: This project will improve traffic flow and address safety enhancements at this intersection.  Please note that traffic patterns will change during the construction of the milling, resurfacing and re-stripping project.  Construction is anticipated to begin mid January 2012. Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route during constructions.

 

ROADWAY CONSTRUCTION/CLOSURE ACTIVITIES:

 

SW 21st Street, SW 67th Avenue to SW 72nd Avenue; SW 14th Street and SW 72nd Avenue; Project No.20100723: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

SW 27th Avenue from South Bayshore Drive to Tigertail Avenue and from US-1 to SW 28th Terrace; Project No. 20100517: Work under this project shall include, but is not limited to, the following: Furnishing all supervision, labor, materials, equipment and tools and performing all operations necessary for the construction and installation of drainage structures, curb and gutters, sidewalk and traffic separator; also tree relocations, tree planting and tree removal and disposal. Construction is anticipated to be completed by April 30, 2012.  At this time, no mainline road closing foreseen, motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 28th Street to SW 30th Street and SW 80th Avenue; Project No. 20110074: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

SW 31st Street and Village Green Drive; Project No. 20090314:    Will improve safety traffic conditions at SW 31st Street and Village Green Drive. Construction is anticipated to be completed by January 31, 2012.  Working Hours will be Monday to Friday from 9 am to 4 pm.  No mainline road closing foreseen, therefore no alternate route is necessary.

 

SW 32nd Street from SW 87th Avenue to SW 107th Avenue; Project No. 20100427:  The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012. Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 37th Terrace from SW 80th Avenue to 82nd Avenue and SW 35th Street from SW 92nd Avenue to 94th Avenue and SW 36th Street and SW 87th Court; Project No 20100724: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

SW 37th Street from SW 95th Avenue to SW 97th Avenue; Project No. 20100725: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 38th Street from SW 94th Avenue to SW 97th Avenue; Project No. 20100719: The work required for this contract shall include, but not limited to alignment of the roadway in order to bring the existing road to current County standards, installation of new sidewalks at the south side of the road, and relocation of the existing catch basin as needed.  Mainline Closure: The majority of the work will require temporary and partial closure of roads. Also, some temporary and total closure are scheduled, however local access to neighboring properties and residences will be maintained at all times while roadway restoration is ongoing.  Detour: Motorists are advised to seek alternate routes or follow maintenance of traffic (MOT) signs or detour signs. Construction is anticipated to be completed by March 31, 2012.

 

SW 45th Terrace to SW 46th Street between SW 132nd Avenue and SW 133rd Avenue; Project No. 20110042: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by February 29, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.


SW 49th Street to SW 55th Street and SW 97th Court to SW 99th Avenue; Project No 20100711-R: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

Miller Drive (SW 56th Street) from SW 67th Avenue to SW 72nd Avenue; Project No. 20100387: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012. Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

Miller Road (SW 56th Street) from SW 132 Avenue to SW 134 Avenue; Project No.20090356: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

SW 57 Avenue from SW 80th Street to SW 74th Street; Project No. 20090313:  This project is to improve the drainage along SW 57th Avenue from SW 80th Street to SW 74th Street.  This project is being conducted as a result of documented flooding in this vicinity.  This project includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: These improvements will require the closure of SW 57th Avenue from SW 80th Street to SW 72th Street.  The contractor will maintain all driveways accessible that are on SW 57th Avenue within the limits of the project.  SW 57th Avenue will be open to "Local Traffic Only." Detour: The first closure will occur between SW 80th Street and SW 76th Street. The detour will be east to SW 56th Avenue and north to SW 76th Street and back to SW 57th Avenue. The second closure will occur between SW 76th Street and SW 74th Street. Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 67th Avenue south of SW 40th Street; Project No. 20090106: Will improve safety traffic conditions at SW 67th Avenue south of SW 40th Street.  Construction is anticipated to be completed by January 31, 2012.  Working Hours will be Monday to Friday from 9 am to 4 pm.  No mainline road closing foreseen, therefore no alternate route is necessary.

 

SW 80th Avenue between SW 28th Street to SW 30th Street and SW 30th Street between SW 79th Court to SW 81st Avenue; Project No. 20100388: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by February 29, 2012. Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

SW 89th Court and SW 34th Street; Project No. 20110030: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012. No mainline road closing are foreseen, therefore no alternate route is necessary.

 

SW 95th Avenue from SW 36th Street to SW 37th Street; Project No. 20100725: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 116th Street and SW 130th Avenue; Project No. 20100684: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

Drainage Improvement Project San Sebastian Phase I: SW 132nd Avenuwe and SW 133rd Avenue and SW 45th Terrace and SW 47th Street; Project No. 20110042:  This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by April 30, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

SW 132nd Avenue from SW 256th Avenue to SW 268th Avenue; Project No. 20100426: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 137th Avenue And SW 344th Street; Project No. 20090314:    Will improve traffic capacity at SW 137th Avenue and SW 344th Street.  Construction is anticipated to be completed by January 31, 2012.  Working Hours will be Monday to Friday from 9 am to 4 pm.  No mainline road closing foreseen, therefore no alternate route is necessary.

 

SW 147th Avenue from SW 200th Street to SW 248th Street; Project No. 20100388: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012. Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

Caribbean Boulevard from SW 110 Court and Busway; Project No. 20100669: The Work under this Contract includes, but not limited to reconstructing the existing four (4) lane roadway to proper lane widths, drainage curb and gutter, pedestrian ramps,  pavement marking and signings, decorative roadway lighting and brick pavers.  The Contractor continues with the construction of the ex-filtration drainage at westbound leg of Caribbean Boulevard, the eastbound leg is open to traffic one lane one way basis.  Construction is anticipated to be completed by January 31, 2012. Motorists are advised to seek alternate routes or follow maintenance of traffic (MOT) signs or detour signs.

 

CRS-RL Lormar Sub-Division Drainage Improvement Project; Project No. 20100660: Work under this contract consists of furnishing all supervision, labor, material, equipment and tools to perform all the necessary drainage improvements in accordance with the Contract Documents. Work includes but is not limited to installation of an Exfiltration system to alleviate flooding problems within the project boundaries. Additional ancillary work includes sidewalk construction, sodding and miscellaneous roadway restoration. These drainage improvements will take place within the following areas: Site #1 SW 147th Avenue from SW 88th Street to 90th Street. Site #2 and #3 SW 96th Terrace to SW 101st Street from SW 146th Avenue to SW 147th Avenue. Construction is anticipated to be completed by January 31, 2012. Mainline Closure: Temporary and partial closure of lanes along 147th Avenue from SW 88th Street to 90th St will impact traffic at times.  Detour: Motorists are advised to seek alternate routes or follow maintenance of traffic (MOT) signs or detour signs.

 

SW 152nd Street and SW 77th Avenue (Intersection); Project No. 20100427: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 157th Avenue from SW 288th Street to SW 296th Street; Project No. 20100725: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by February 29, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

Franjo Road from US-1 to SW 184th Street; Project No. 20100388: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

SW 184th Street from SW 137th Avenue to SW 147th Avenue; Project No. 20100394:  This roadway improvement project includes the constructing of a five lane roadway including center turn lane, sidewalk, curb and gutter, continuous storm drainage system, roadway lighting, signage, traffic signalization, 24-inch and 16-inch water mains, and 24-inch force main.  Construction is anticipated to be completed by January 31, 2012.  Mainline Closure:  Motorists are advised to expect delays, seek alternate routes or follow maintenance of traffic (MOT) signs or detour route.

 

SW 216th Street Between SW 112th Avenue and Florida Turnpike; Project No. 20090314:  Will improve safety traffic conditions at SW 216th Street Between SW 112th Avenue and Homestead Extension Florida's Turnpike (HEFT).  Construction is anticipated to be completed by January 31, 2012.  Working Hours will be Monday to Friday from 9 am to 4 pm.  No mainline road closing foreseen, therefore no alternate route is necessary.

 

SW 256th Street from SW 127th Avenue to SW 137th Avenue; Project No. 20100426: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

Venetian Causeway Streetscape Improvement Project; Project No. 20100522:  The scope of work includes, but is not limited to, roadway improvements, sidewalks, curb & gutter, raised landscape median, continuous bike lanes, parallel parking, drainage improvements, pavement markings & signing, traffic signalization, decorative roadway lighting, island entry signs and tree planting. No mainline road closing are foreseen, therefore no alternate route is necessary. Construction is anticipated to be completed by January 31, 2012. 

 

Dade Boulevard from Purdy Avenue to Alton Road; Project No 20100388: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

Floral Park Drainage Improvement Project; Project No. 20100653:  This Drainage Improvement Project includes the construction and installation of drainage structures, french drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutters and sidewalks in accordance to the construction plans. These drainage improvements will take place within NW 17th Avenue to NW 22nd Avenue from NW 61st Street to NW 54th Street. Construction is anticipated to be completed by January 31, 2012. Mainline Closure: The majority of the work will require temporary and partial closure of roads. Also, some temporary and total closure are scheduled, however local access to neighboring properties and residences will be maintained at all times while roadway restoration is ongoing. Detour: Motorists are advised to seek alternate routes or follow maintenance of traffic (MOT) signs or detour signs.

 

NW 17 Avenue between NW 28 Street and NW 35 Street; Project No. 20090314: Work under this Contract shall include, but is not limited to, the following: Furnishing all supervision, labor, materials, equipment and tools and performing all operations necessary for the construction of curb ramps. Construction is anticipated to be completed by January 31, 2012.

 

NW 32nd Avenue from NW 54th Street to NW 71st Street; Project No. 20100427: The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

NW 62nd Avenue and Tamiami Canal Road; Project No. 20090313:    Will improve safety traffic conditions at NW 62nd Avenue and Tamiami Canal Rd.  Construction is anticipated to be completed by January 31, 2012.  Working Hours will be Monday to Friday from 9 am to 4 pm.  The intersection will allow Local Traffic Only during working hours. Other motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

NW 82nd Street to NW 84th Street from NW 2nd Avenue to North Miami Avenue; Project No. 20100739: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

NW 82nd Street from West Flagler to NW 3rd Avenue; Project No. 20110002: This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

NW 94th Terrace and NW 35th Court and NW 105th Street and NW 19th Avenue; Project No. 20110017: This Drainage Improvement Project includes the construction and installation of drainage structures, french drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutters and sidewalks in accordance to the construction plans. Construction is anticipated to be completed by January 31, 2012.  No mainline road closing are foreseen at this time, therefore no alternate route is necessary.

 

NW 97th Avenue from NW 41st Street to NW 45th Lane and NW 97th Avenue and NW 33rd Street; Project No. 20110003:  This project will to improve the drainage in the area which has been documented by flooding in this vicinity.  This work includes the construction and installation of drainage structures, exfiltration drains, miscellaneous drainage improvements, grading, sodding and miscellaneous roadway restoration including curb and gutter, and sidewalks as needed. Construction is anticipated to be completed by February 28, 2012.  No mainline road closing are foreseen, therefore no alternate route is necessary.

 

NW 138th Street Bridge over the Miami River Canal from NW 113 Avenue to Okeechobee Road; Project No. 20090024: The scope of work consists of, but not limited to, furnishing all supervision, labor, materials, equipment, tools.  The project consists of replacing the existing bridge with a new and wider bridge; turn lane improvements and replace existing signal at the intersection of Okeechobee Road and NW 138 Street. Work also includes a striped median with a center left turn lane, sidewalks, a continuous storm drainage system, roadway lighting, signalization, pavement markings and signage. Construction is anticipated to be completed by April 30, 2012. Mainline Closure: The bridge will be closed for the duration of the construction.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

NW 183rd Street to NW 191st Street and NW 2nd Avenue to NW 1st Avenue; Project No. 20100725:  The scope of work consists of, but is not limited to, the following: adjustment of valve boxes and manholes; milling and resurfacing; and pavement markings. Construction is anticipated to be completed by January 31, 2012. Mainline Closure: This is a moving operation and temporary lane closures will impact traffic at times.  Detour: Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs or detour route.

 

American Recovery and Reinvestment Act (ARRA) Projects:

 

Resurfacing Category:

 

SW 147th Avenue from SW 72nd Street to SW 88th Street; Project No. 20100388: The scope of work includes but is not limited to milling, resurfacing, striping, installation of signs, upgrading pedestrian ramps and connectors to comply with Americans with Disabilities Act of 1990 (ADA) standards, upgrading damaged or outdated guardrails, and eliminating potential hazards along the specific corridors. In addition, pedestrian crossings will be upgraded to include pedestrian signal countdowns, push buttons and signs, as needed. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: The milling and resurfacing portion is a moving operation and temporary lane closures will impact traffic at times.  Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs.

 

SW 147th Avenue from SW 47th Street to SW 56th Street; Project No. 20100522: The scope of work includes but is not limited to milling, resurfacing, striping, installation of signs, upgrading pedestrian ramps and connectors to comply with Americans with Disabilities Act of 1990 (ADA) standards, upgrading damaged or outdated guardrails, and eliminating potential hazards along the specific corridors. In addition, pedestrian crossings will be upgraded to include pedestrian signal countdowns, push buttons and signs, as needed. Construction is anticipated to be completed by January 31, 2012.  Mainline Closure: The milling and resurfacing portion is a moving operation and temporary lane closures will impact traffic at times.  Motorists are advised to seek alternate route or follow posted maintenance of traffic (MOT) signs.

PLEASE DON'T TEXT AND DRIVE!
PLEASE ADVISE US IF YOU WISH FOR YOUR NAME TO BE REMOVED FROM THIS DISTRIBUTION LIST.  THANK YOU

The above information is subject to change if the contractor's schedule is altered due to unexpected circumstances.


 

# # #

 

PUBLIC WORKS DEPARTMENT