Roadway Construction Report
Week of November 10, 2014 through November 16, 2014

Drive Safely!


As of September 23, all tolls on the Rickenbacker and Venetian Causeways are collected electronically via SunPass or Toll-By-Plate. C-Pass transponders or cash will no longer be accepted.  For more information, please visit http://www.miamidade.gov/publicworks/library/flyers/sunpass-rickenbacker-venetian.pdf.

 

Special Event

On Monday, November 10, 2014, from 12:00 a.m. to 4:00 a.m., the Florida Gas Transmission Company will test 11.2 miles of natural gas pipeline using water.  The pipeline is underneath the following roadways, which will be closed during the test:

 

·         Along Milam Dairy Road/NW 72nd Avenue from NW 65th Street to W. Flagler Street.

·         Along W. Flagler Street from Milam Dairy Road/NW 72nd Avenue to SW 87th Avenue/Galloway Road.

·         Along SW 87th Avenue/Galloway Road from W. Flagler Street to SW 88th Street/N. Kendall Drive.

 Emergency vehicles will be provided access at all times.  For more information about the test, please contact Mr. Terry Coleman at 1-844-FGT-INFO (1-844-348-4636) or visit the testing web site at www.fgthydrotest.com.

 Roadway Construction/Closure Activities:

 

 

PLEASE DON'T TEXT AND DRIVE!

 

Please advise us if you wish for your name to be removed from this distribution list. Thank you.

 

All information listed above is subject to change if the respective contractor's schedule is altered due to unforeseen circumstances.