Roadway Construction Report for the week of March 30 – April 5, 2020

MIAMI ( March 27, 2020 )

The following is a list of roadway construction/closure activities for the week of March 30 – April 5, 2020.

SW 328 St. from US 1 to SW 167 Ave. – Project No. 20150169 (Miami-Dade Commission districts 8 & 9) : Work includes widening the existing roadway from two (2) to four (4) lanes with a raised median, sidewalks, curb and gutter, bicycles facilities, continuous storm drainage system, signalization, pavement markings and signage and decorative lightning. Construction is anticipated to be completed by October 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

William Powell Bridge Expansion Joint and Fender System Rehabilitation-Project No. 20180090 (Miami-Dade Commission district 7): Work includes but is not limited to replacement of the William Powell expansion joints, restored concrete spall areas, crack injection in bridge concrete elements, replacement of navigation bridge fender system and navigations lights. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 211 St. from Florida Turnpike Exp. to US-1 – Project No. 20180253 WO #2 (Miami-Dade Commission districts 8 & 9): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by April 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

North Miami Ave. from NW 22 St. to NW 28 St. – Project No. 20180246 (Miami-Dade Commission district 3):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration including asphalt and restriping, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by June 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 107 Ave. and NW 41 St. (Intersection Improvements) Project No. 20170025 WO # 7 (Miami-Dade Commission district 12): The improvement at the location includes trees removal; clearing and grubbing; removal of curb and gutter; drainage installation; construction of new curb and gutter and sidewalks; milling and resurfacing; signage and pavement markings installation, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by April 2020.

Pine Tree Dr. from 23 St. to 41 St. (Phase 1) - Project No. 20180176 WO # 1 (Miami-Dade Commission district 4): The scope of work includes the following:  milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by April 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 97 Ave. and North Snapper Creek Drive –Project No. 20180216 WO # 6 (Miami-Dade Commission district 10): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by November 2019. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 8 Ave. to NW 12 Ave. from NW 107 St. to NW 111 St. – Project No. 20180277 (Miami-Dade Commission district 2): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by May, 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 8 Ave. to NW 12 Ave. from NW 107 St. to NW 111 St. – Project No. 20180277 WO # 3 (Miami-Dade Commission district 2):   Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by May 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 137 Ave. from HEFT to US-1 – Project No. 20180064 (Miami-Dade Commission district 8): Work consists of widening the existing roadway from two (2) to four (4) lanes with a raised median and centered left turn lane, sidewalks, curb and gutter, bicycle facilities, continuous storm drainage system, signalization, pavement markings and signing, and street lighting Construction is anticipated to be completed by June 2021. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 137 Ave. from US-1 to SW 200 St. – Project No. 20180089 (Miami-Dade Commission district 8): Work consists of a new two lane roadway which will include, but is not limited to: sidewalks (for a portion of the project), curb and gutters, a continuous storm drainage system, signalization, pavement markings and signage, standard roadway lighting system, bicycle facilities, landscaping, a bridge crossing over Canal C-102, a culvert crossing at Canal C-102N, and the filling of the borrow pit at SW 240 Street within the right-of-way limits. Construction is anticipated to be completed by October 2022. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 66 St. from NW 84 Ave. to NW 77 Ct. and NW 67 St. from NW 79 Ave to NW 77 Ct. – Project No. 20190094 (Miami-Dade Commission district 12): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by November 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 36 Ave. from NW 67 St. to NW 71 St. – Project No. 20180136 WO #4 (Miami-Dade Commission District 2):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by January 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 191 St. from NW 27 Ave. to NW 52 Ave. – Project No. 20190120 WO # 2 (Miami-Dade Commission district 1):   The scope of work includes the following: milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by April 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

West Ferm St. from SW 102 Ave to Duval Ave. – Project No. 20180216 WO # 7 (Miami-Dade Commission district 9): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by January 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 151 St. from NW 22 Ave. to NW 37 Ave. – Project No. 20190078  WO #2 (Miami-Dade Commission district 1): The scope of work includes the following: milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by March 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 22 Ave. from NW 119 St. to NW 151 St. – Project No. 20190121 - WO #2 (Miami-Dade Commission district 2): The scope of work includes the following: milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NE 8 Ave. to NE 10 Ave. from NE 147 St. to NE 149 St. – Project No. 20180195 WO #4 (Miami-Dade Commission district 2): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by February 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Pine Tree Dr. from W 41 St. to W 51 St. (Phase 2) - Project No. 20180176 WO # 3 (Miami-Dade Commission District 4): The scope of work includes the following:  milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by April 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 28 St. from SW 59 Ave. to SW 60 Ct. (Intersection Improvements) - Project No. 20180097 WO # 5 (Miami-Dade Commission district 6): The improvement at the location includes construction of one Traffic Calming Device (Speed Table) to improve the traffic safety along SW 28 Street;. Project also includes signage, pavement markings installation and sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by April 2020.

SW 26 St. from SW 62 Ave. to SW 63 Ave. (Intersection Improvements) - Project No. 20180097 WO # 7 (Miami-Dade Commission district 6): The improvement at the location includes construction of one Traffic Calming Device (Speed Table) to improve the traffic safety along SW 26th Street. project also includes milling, resurfacing, signage, pavement markings installation and sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by April 2020.

NE 22 Ave. from NE 185 St. to NE 199 St. - Project No. 20180252 WO # 6 (Miami-Dade Commission district 4): The scope of work includes milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 62 St. from I-95 to N Miami Ave. – Project No. 20190078  WO # 1 (Miami-Dade Commission district 1): The scope of work includes the following: milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by April 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 117 Ave. from SW 26 St. to SW 40 Street - Project No. 20190122 WO # 2 (Miami-Dade Commission district 10 and 11): The scope of work includes milling and resurfacing, construction of ADA Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 127 Ave. from SW 184 St. to SW 216 St. - Project No. 20190120 - WO # 4 (Miami-Dade Commission district 8 and 9): The scope of work includes milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by June 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 67 Ave. from SW 40 St. to Coral Way. - Project No. 20190079 - WO # 3 (Miami-Dade Commission district 6): The scope of work includes milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by June 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

N Miami Ave. and NW 111 St. (Intersection Improvements) - Project No. 20180096 WO#4 (Miami-Dade Commission District 3): The improvement includes construction of Traffic Calming Device (Traffic Circle) at this location to improve the traffic flow and safety at the mentioned intersection. The project also includes drainage installation, milling and resurfacing, signage, pavement markings installation and sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by April 2020.

NW 7 St. from NW 62 Ave. from NW 65th  Ave. - Project No.20190059-R: Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by September 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 83 St. to NW 81 Terr. from NW 36 Ave. to NW 30 Ave. and NW 32 Ct. from NW 86 St. to NW 83 Terr. – Project No. 20190096  (Miami-Dade Commission district 2):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by November 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 127 Ave. from theoretical SW 146 Terr. south to the C1N Canal- Project No. 20190028 (Miami-Dade County Commission District 9): This project was initiated due to documented flooding complaints within the boundaries described above. The scope of work consists of, but is not limited to, the construction of a storm drainage system consisting of exfiltration trenches and solid pipe along with drainage inlets and storm manholes, as well as miscellaneous roadway restoration. Construction is scheduled to begin in January 2020 and is anticipated to be completed in February 2020.

NW 71 St. between NW 22 Ave. and NW 19 Ave. (Intersection Improvements) Project No. 20170025 WO # 12 (Miami-Dade Commission district 3): The improvement includes construction of Traffic Calming Device (Two Speed Tables) at this location to improve the traffic flow and safety at the mentioned location; also includes; milling and resurfacing; signage; pavement markings installation and sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by April 2020.

SW 141 St. from SW 145 Pl. to SW 152 Ave. – Project No. 20190121 WO #4 (Miami-Dade Commission district 11): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by June 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 122 Ave. and SW 26 St. (Intersection Improvements) Project No. 20180097 WO # 2 (Miami-Dade Commission districts 10 & 11): The improvements at this location includes trees removal, clearing and grubbing, removal of curb and gutter, sidewalks and asphalt, construction of new curb and gutter and sidewalks, drainage installation, milling and resurfacing, signage and pavement markings installation, sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by September 2020.

SW 117 Ave. from SW 72 St. to SW 88 St. – Project No. 20190122 WO #3 (Miami-Dade Commission district 10): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by July 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

N Miami Ave. and NW 115 St. (Intersection Improvements) Project No. 20170025 WO # 11 (Miami-Dade Commission district 3): The improvement includes construction of Traffic Calming Device (Traffic Circle) at this location to improve the traffic flow and safety at the mentioned intersection; also includes; drainage installation; milling and resurfacing; signage; pavement markings installation and sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by June 2020.

NW 21 Ave. from NW 132 St. to NW 135 St. – Project No. 20190132 (Miami-Dade Commission district 2): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by March 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route

NW 33 St. and NW 37 Ave. – Project No. 20190132 (Miami-Dade Commission district 2): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by May 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route

SW 216 St. from SW 112 Ave. to SW 127 Ave. – Project No. 20180014 (Miami-Dade Commission districts 9) The work consists of widening the existing roadway to a 2-lane divided highway with a raised landscaped median, bike lanes, on-street parking, a traffic circle, sidewalks, curb and gutter, a new storm drainage system, signalization, pavement markings and signage, and decorative street lighting.Construction is anticipated to be completed by March 2022. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route

SW 55 St. from SW 114 Ct. to SW 113 Pl. and SW 53 Terr from SW 114 Ct to Theoretical SW 113 Pl – Project No. 20190189 Work Order #1  (Miami-Dade Commission district 10):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, swale blocks and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by March 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 24 Terr. from SW 122 Ave. to SW 122 Ct. – Project No. 20190126 WO #2 (Miami-Dade Commission district 11):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by May 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 122 Ave. from SW 18 St. to SW 8 St. – Project No. 20190121 WO # 3 (Miami-Dade Commission district 10): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by July 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 31 Ave. from NW 82 St. to NW 83 St. – Project No. 20190276 WO # 2 (Miami-Dade Commission district 2): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 33 Ave. from NW 83 St. to NW 87 St. – Project No. 20190276 WO # 3 (Miami-Dade Commission district 2): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 3 St to NW 6 St between NW 72 Ave to NW 73 St. - Project No. 20190189 Work Order #3 (Miami-Dade Commission district 6):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by July 2020. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 31 Ave. from NW 82 St. to NW 83 St. – Project No. 20190276 WO # 2 (Miami-Dade Commission district 2): The scope of work includes the following:  milling and resurfacing, construction of ADA  Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 33 Ave. from NW 83 St. to NW 87 St. – Project No. 20190276 WO # 3 (Miami-Dade Commission district 2): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by May 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 194 Ave. from SW 192 St. to SW 208 St. – Project No. 20190212 WO # 1 (Miami-Dade Commission district 9): The scope of work includes the following:  milling and resurfacing, construction of ADA   Ramps and Connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by June 2020. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

 