Skip Navigation
Last Visited »

Hurricane Irma

As we continue our recovery and cleanup efforts, please visit the Emergency website for the latest information on openings and closings in Miami-Dade County.

Architectural & Engineering / CBE

/Listed below are Architectural & Engineering projects and the status of the review for small business measures. A Verification of Availability form is available below (when applicable) and may be submitted any time prior to the posting of the SBD Final Recommendation. Simply download form accompanying the applicable project and return as instructed. Additionally, comments on any project may be sent to SBDprojectmeasure@miamidade.gov. SBD reviews all comments and may use information when making goal recommendations as applicable.

Date Received Project Number Project Title Project Package Dept. RCMD SBD Project Breakout

Additional

Infomation

Verification of Availability

SBD Analysis & RCMD

SBD Final RCMD

Comments
10/19/17 E17-DTPW-02 Request for Proposals (RFP) for CEI Services for Various Traffic Signals and Signs and Street Lighting projects for the DTPW Projects PDF

 SBE/A&E –  30% Goal

N/A N/A PDF

 30.00% SBE/AE Goal

30.00% SBE/AE Goal

N/A
9/20/17 MDAD W-104A PH2/3 Phase II and III Warehouse and Office Building at Carrie Meek Warehouse Distribution Center PDF

 SBE/Cons –  7.85% Goal
 SBE/A&E – 10.18% Goal
 SBE/G&S – 15% Goal

N/A N/A N/A

Under Review

Under Review

N/A
9/1/17 E17-TPO-02 Recommendation for Non-Exclusive Professional Services Agreement (PSA) for the 2045 Long Range Transportation Plan (LRTP) PDF

 SBE/A&E –  No Measure (Federally Funded)

N/A N/A N/A

No Measure

No Measure

N/A
8/2/17 E17-DSWM-02 South Dade Landfill Cell 4 Closure PDF

0.50% SBE/GS Goal

30% SBE/AE Goal

N/A N/A N/A

0.50% SBE/GS Goal

30% SBE/AE Goal

0.50% SBE/GS Goal

30% SBE/AE Goal

N/A
8/2/17 A17-MDAD-01 MIA Employee Parking Garage A/E Services for Design Criteria Professional Services PDF SBE/A&E Goal- 20%
SBE/G&S Goal- 0.5%
N/A N/A N/A

0.50% SBE/GS Goal

26.00% SBE/AE

0.50% SBE/GS Goal

26.00% SBE/AE

N/A
7/24/17 DB17-ISD-01 GOB ESP/ Z000144 Design-Build Services for Electrical Repairs at the Miami-Dade County Courthouse PDF SBE/A&E – 25.00% Goal
SBE/Cons – 25.66% Goal
SBE/G&S – 2.57% Goal
N/A N/A N/A

5.00% SBE/AE Goal

5.00% SBE A/E Goal

N/A
7/18/17 E17-MDAD-03 Utilities Master Plan (Water) PDF SBE/A&E Goal- 10%
SBE/G&S Goal- 0.75%
PDF N/A N/A

0.75% SBE/GS Goal

10.00% SBE/AE Goal

0.75% SBE/GS Goal

10.00% SBE/AE Goal

N/A
7/18/17 E17-MDAD-04 Stormwater Sampling and Monitoring PDF SBE/A&E Goal- 10%
SBE/G&S Goal- 0.75%
PDF N/A N/A

0.75% SBE/GS Goal

10.00% SBE/AE Goal

0.75% SBE/GS Goal

10.00% SBE/AE Goal

N/A
7/18/17 E17-MDAD-05 Stormwater Pollution Prevention Plan PDF SBE/A&E Goal- 10%
SBE/G&S Goal- 0.75%
N/A N/A N/A

0.75% SBE/GS

10.00% SBE/AE

0.75% SBE/GS

10.00% SBE/AE

N/A
6/20/17 DB17-WASD-01 Design-Build Services for the Construction of the Central District Wastewater Treatment Plant Oxygen Production Facility Consent Decree Project 2.27 PDF SBE/A&E – 13.13% Goal
SBE/Cons – 7.15% Goal
SBE/G&S – 1% Goal
N/A N/A N/A

Under Review

Under Review

N/A
6/16/17 E17-MDAD-02, B General MEP Engineering & Design Services PDF SBE/A&E Goal- Set-Aside
SBE/G&S Goal- 1%
N/A N/A N/A

1.00% SBE/GS Goal

15.00% SBE/AE Goal

1.00% SBE/GS Goal

15.00% SBE/AE Goal

N/A
6/16/17 E17-MDAD-02, A General MEP Engineering & Design Services PDF SBE/A&E Goal- Set-Aside
SBE/G&S Goal- 1%
N/A N/A N/A

1.00% SBE/GS goal

100% SBE/AE Goal

Set Aside Tier 2 

1.00% SBE/GS goal

100% SBE/AE Goal

Set Aside Tier 2

N/A
6/16/17 E16-MDAD-02 Baggage Handling Systems Services PDF SBE/A&E Goal- 20%
SBE/G&S Goal- 0%
N/A N/A N/A

 20.00% SBE/AE Goal

No Measure SBE/GS

20.00% SBE/AE Goal

No Measure SBE/GS

N/A
6/5/17 E17-DSWM-01 Professional Bond Engineering Services PDF SBE/A&E - No Measure (Insufficient Availability) N/A N/A N/A

No Measure

No Measure

N/A
6/5/17 DB17-SEA-01 Design-Build Services for New Cruise Terminal B Program PDF SBE/A&E Goal – 18.00%
SBE/Cons Goal – 8.92%
SBE/G&S Goal – 6.00%
N/A N/A N/A

Under Review

Under Review

N/A
6/1/17 DB17-ISD-02 GOB ESP Design-Build Services for Miami Dade Public Library System (MDPLS) Hialeah Gardens Branch Library PDF SBE/A&E – 17.00% Goal
SBE/Cons – 25.97% Goal
SBE/G&S – 2.00% Goal
N/A N/A N/A

Under Review

Under Review

N/A
5/11/17 E17-DTPW-01 Request for Proposals (RFP) for CEI Services for Various Design-Build Projects; DTPW 20170006 PDF Set-Aside Tier 3 N/A N/A N/A

Set Aside Tier 3 100%

Set Aside Tier 3 100%

N/A
5/9/2017 E17-MDAD-01 Forensic Glazing Curtain Wall Consultant PDF SBE/A&E Goal – 10%
                                                                                                SBE/ G&S Goal – .5%
N/A N/A N/A

SBE/GS Goal - 0.50%

SBE/AE Goal - 15.00%

SBE/GS Goal - 0.50%

SBE/AE Goal - 15.00%

N/A
4/6/17 E17-WASD-01 Engineering Design and Related Services for the Design of Small Diameter Water and Wastewater Pipelines PDF 100% Set Aside Tier I SBE /A&E Goal N/A N/A PDF

100% Set Aside Tier 1 - SBE/&E Goal

100% Set Aside Tier 1- SBE/A&E Goal

N/A
2/27/17 E16-MDAD-06 Flamingo and Dolphin Garages Repairs and Upgrades PDF SBE/A&E Goal – 20%
SBE/ G&S Goal – 1%
N/A N/A N/A

1.00% SBE/GS Goal

20.00% SBE/AE Goal

1.00% SBE/GS Goal

20.00% SBE/AE Goal

N/A
2/22/17 E17-RER-01 Technical services for the evaluation and development of Local Limits in Section 24-42.4 of the Code of Miami-Dade County PDF Under Review PDF N/A N/A

No Measure

No Measure

N/A
2/3/2017 E17-DTPW-01 Request for Proposals (RFP) for CEI Services for Various Design-Build Projects; DTPW 20170006 PDF SBE/A&E Goal – Set-Aside PDF N/A N/A

Set Aside Tier 3

Set Aside Tier 3

N/A
2/6/17 E17-MPO-01 SMART Plan General Planning Consultant (GPC) Program PDF SBE/A&E Goal – No Measure (Federally Funded) N/A N/A N/A

No Measure

No Measure

N/A
1/11/17 E16-RER-01 Sea Level Rise project PDF SBE/A&E Goal -3% N/A N/A N/A

6.00% SBE/AE

6.00% SBE/AE

N/A
12/8/16 E16-PROS-01 A Professional Services Agreement for Black Creek Trail Segment B PDF  SBE/A&E Goal - No Measure (Federally Funded)
 DBE Goal –9.91%
N/A N/A N/A

9.91% DBE Goal

9.91% DBE Goal

N/A
11/10/16 E16-MDAD-08 General Special Systems Engineering Services PDF SBE/A&E Goal – 5.00% PDF N/A N/A

2.00% SBE/GS Goal

25.00% SBE/AE Goal

2.00% SBE/GS Goal

25.00% SBE/AE Goal

N/A
10/24/16 A16-MDAD-04 Airport Wayfinding/Signage Design Services PDF SBE/A&E Goal – 12.00% PDF N/A PDF

1.00% SBE/GS Goal

20.00% SBE/AE Goal

1.00% SBE/GS Goal

20.00% SBE/AE Goal

N/A
9/19/16 20160075 Joint Participation Agreement (JPA) Between Miami-Dade County and The City of Hialeah for Roadway Improvement Project Along NW 97 Avenue from NW 154 Street to NW 170 Street PDF SBE – A&E Goal – 14.0%
SBE – Good & Services Goal – 0.2%
SBE – Cons Goal – 3.9% - Concrete
                            0.9% - Landscaping
                            0.7% - Signage & Pavement Markings
N/A N/A N/A

SBE - A&E Goal 25.00%

SBE - G&S Goal 1.18%

SBE- Cons Goal - 4.61%

SBE - A&E Goal 25.00%

SBE - G&S Goal 1.18%

SBE- Cons Goal - 4.61%

N/A
8/8/16 DB16-DTPW-01 (20160163) Design-Build Services for the Bridge Replacement at Old Cutler Road over C-100 Canal (874293), Old Cutler Road over Black Creek Canal (874432) PDF SBE/Cons Goal – Trade Set-Aside for Traffic Stripes and Markings
                                                                                                SBE/A&E Goal – 7.80% (Surveying and Mapping)
                                                                                                SBE/ G&S Goal – 5.52% (Maintenance of Traffic & Grass/Sod)
N/A N/A N/A

7.80% SBE/AE Goal

6.77% SBE/GS Goal

Trade Set Aside - SBE/Cons Goal

10.00% CWP Goal

7.80% SBE/AE Goal

6.77% SBE/GS Goal

Trade Set Aside - SBE/Cons Goal

10.00% CWP Goal

N/A
7/19/16 E16-DTPW-02 Professional Services Agreement for Engineering Services for Department of Transportation and Public Work’s Capital Improvement Plan (2) PDF DBE Goal- 22% N/A N/A N/A 22% DBE Goal 22% DBE Goal N/A
7/12/16 E16-MDAD-10 Aviation Acoustical and Land Use Compatibility Planning Services PDF No Measure (Insufficient Availability) N/A N/A N/A No Measure No Measure N/A
7/12/16 E16-MDAD-02(R) Baggage Handling Systems Services PDF SBE/A&E Goal- 10%
SBE/G&S Goal- 0%
N/A N/A N/A 20.00% SBE/AE Goal 20.00% SBE/AE Goal N/A
7/1/16 A16-MDFR-01 Design Services for Miami-Dade County Fire Rescue Station No. 68 PDF 20% SBE /A&E Goal N/A N/A PDF 100% Set Aside Tier 2

100% Set Aside Tier 2

N/A
6/28/16 E16-MDAD-06 Flamingo and Dolphin Garages Repairs and Upgrades PDF SBE /A&E Goal – 14%
SBE/ G&S Goal – Under Review
N/A N/A N/A Under Review Under Review N/A
6/23/16 E16-MDAD-07 General MEP Engineering & Design Services PDF 15.0% SBE A & E Goals N/A N/A N/A

15.00% SBE/AE Goal

100% Set Aside Tier 2

15.00% SBE/AE Goal

100% Set Aside Tier 2

N/A
6/21/16 DB16-DTPW-05 Design-Build Services for the Bridge Replacement at SW 42 Avenue over Gables Waterway (874275) PDF Trade Set-Aside N/A N/A N/A

7.45% SBE/AE Goal

7.45% SBE/AE Goal N/A
07/29/16 DB16-DTPW-02 (RPQ No. 20160164) Design-Build Services for the Bridge Replacement at Snapper Creek West of SW 107 Avenue (874436), SW 16 Street West of SW 99 Avenue (874235), and NE 10 Avenue North of NE 79 Street (874178) PDF SBE/Cons Goal – Trade Set-Aside for Traffic Stripes and Markings 
SBE/A&E Goal – 7.05%
N/A N/A N/A

2.00% SBE/GS Goal

Trade Set Aside SBE/Cons Goal

7.05% SBE/AE Goal

2.00% SBE/GS Goal

Trade Set Aside SBE/Cons Goal

7.05% SBE/AE Goal

N/A
06/06/16 E16-MDAD-02 Baggage Handling Systems Services PDF 10% SBE A&E Goal N/A N/A N/A Under Review Under Review N/A
06/03/16 DB16-DTPW-01 (RPQ No. 20160162) Design-Build Services for the Bridge Replacement at Old Cutler Road Over C-100 Canal (874293) Standard Industrial Code (SIC) PDF 7.80% SBE - A&E Goal N/A N/A N/A

7.80% SBE - A&E Goal

7.80% SBE - A&E Goal

N/A
5/25/16 DB16-WASD-01 Design-Build Services for the Construction of South District Wastewater Treatment Plant and Central District Wastewater Treatment Plant Sludge Thickening and Dewatering Buildings PDF 18.0% SBE A & E -  7.88% SBE Cons - 1% SBE Goods and Services 25/16 PDF N/A N/A 14.00% SBE/AE Goal 14.00% SBE/AE Goal N/A
5/20/16 A16-JHS-01 General Civil Engineering Services PDF 100% Set Aside Tier 3 (w/exempt) N/A N/A N/A 100% Set Aside Tier 3 (w/exempt) 100% Set Aside Tier 3 (w/exempt) N/A
5/19/16 A16-MDAD-03 Terminal Optimization Program (TOP) Facility Design Services PDF 28.0% DBE Goal N/A N/A N/A 28.00% DBE Goal 28.00% DBE Goal N/A
5/19/16 E16-MDAD-04 Aviation Planning & Programming Consultant Services for Project PDF 25.0% DBE Goal N/A N/A N/A 25.00% DBE Goal 25.00% DBE Goal N/A
5/19/16 A14-MDAD-01 Terminal Optimization Program (TOP) PDF 23.4% DBE Goal N/A N/A N/A Under Review Under Review N/A
5/6/2016 A16-MDAD-01 Airport Operations Center (AOC) Design Services PDF 27.0% DBE Goal N/A N/A N/A 27% DBE Goal 27% DBE Goal N/A
5/6/2016 E16-MDAD-03 General Civil Engineering Services PDF 23.0% DBE Goal N/A N/A N/A 23% DBE Goal  23% DBE Goal N/A
5/4/2016 E16-SEA-02 (Project No. 2016-023 Non-Exclusive Professional Services Agreement for Civil Infrastructure Engineering Services. PDF 18.0% SBE A & E Goal N/A N/A N/A 18.00% SBE/AE Goal 18.00 SBE/AE Goal N/A
4/22/16 E15-SEA-01 (2016-008) Planning Services PDF 11% SBE/AE Goal N/A N/A N/A

11.00% - SBE/AE Goal

No Measure - SBE/GS

11.00% - SBE/AE Goal

No Measure - SBE GS

N/A
4/11/16 E16-MDAD-01 Miami International Airport (MIA) central Base Apron and Utilities Modification and Expansion PDF 15% SBE A/E and .0075% SBE G&S N/A N/A N/A

0.75% SBE/GS Goal

15.00% SBE/AE Goal

0.75% SBE/GS Goal

15.00% SBE/AE Goal

N/A
4/8/16 E16-WASD-03 Design Services for Wastewater Treatment Plants Related to the Ocean Outfall Legislation Projects PDF 20% - SBE A&E and 1% SBE G&S Goals N/A N/A N/A

4.00% SBE/GS Goal

20.00% SBE/AE Goal

4.00% SBE/GS Goal

20.00% SBE/AE Goal

N/A
3/15/16 E16-MDAD-05 Aviation Planning & Programming Consultant Services for MDAD PDF 20% SBE A & E, and .0030% SBE Goods & Services N/A N/A N/A 20.00% SBE/AE Goal 20.00% SBE/AE Goal N/A
3/10/16 E15-SEA-02 Program Management Consultant Services PDF Participation Goals: SBE A & E 15%, and SBE Goods & Services 2.00% PDF N/A N/A

2.00% SBE - G&S Goal

15.00% SBE - A&E Goal

2.00% SBE - G&S

15.00% SBE - A&E Goal

N/A
3/4/16 DB15-WASD-01 Design-Build Services for Replacement of Water Mains and Service Conversions in the City of North Miami Beach “Donut Hole” Services Area PDF Participation Goals: SBE A & E 20%, SBE Construction 16%, and SBE Goods & Services 0.25% N/A N/A N/A 25.00% SBE/A&E Goal 25.00% SBE- A&E Goal N/A
2/29/16 E16-PWWM-01 Non-Exclusive Professional Services Agreement for NW 97 Avenue from NW 52 Street to NW 58 Street PDF Level 1 Set Aside N/A N/A N/A Level 1 Set Aside Level 1 Set Aside N/A
2/25/16 E15-PWWM-13 Florida Department of Transportation Local Agency Program Engineering and Design Related Professional Continuing Service Contracts for DTPW Safe Routes To School Projects PDF 9.91% - DBE – Goal N/A N/A PDF 9.91% DBE Goal 9.91% DBE Goal N/A
2/9/16 E15-RER-01 Environmental Cleanup, Compliance and Related Services for Miami-Dade Transit Department and Other County PDF No Measure (DBE) N/A N/A N/A No Measure No Measure N/A
2/9/16 E15-RER-02 PTP Environmental Cleanup, Compliance and Related Services for Miami-Dade Transit Department (MDT) and Other County Departments Utilizing People’s Transportation Plan (PTP) Funds.               PDF Set Aside Tier 3 PDF N/A N/A

Set Aside Tier 3

100% SBE/AE Goal

Set Aside Tier 3

100% SBE/AE Goal

N/A
2/9/16 E15-RER-03 PTP Environmental Cleanup, Compliance and Related Services for Miami-Dade Transit Department (MDT) and Other County Departments Utilizing People’s Transportation Plan (PTP) Funds.          PDF 8% A & E Goal Participation PDF N/A N/A 11.00% SBE/AE Goal 11.00% SBE/AE Goal N/A
1/28/16 A15-AOC-01 GOB (R) Notice of Professional Services Agreement for the Revision to the 2008 Eleventh Judicial Circuit-wide Courts and the 2008 Correctional Facilities Master Plans.     PDF SBE A & E 10% Goal N/A N/A N/A Under Review Under Review N/A
1/21/16 E15-MDAD-04-R Automated People Mover System Consultant at MIA PDF SBE/A&E Goal- 1.5%
SBE/G&S Goal- 0.5%
N/A N/A N/A

4.50% SBE/G&S Goal

6.00% SBE/A&E Goal

4.50% SBE/G&S Goal

6.00% SBE/A&E Goal

N/A
12/23/15 DB15-PWWM-01 (20150195) Roadway Improvements to NE 2 Avenue from NE 69 Street to NE 84 Street PDF 11.00% SBE/AE Goal             
10.60% SBE/Cons Goal                        
  2.40% SBE/GS Goal
N/A N/A PDF 21% SBE/A&E Goal 21% SBE/A&E Goal N/A
12/16/15 A15-AOC-01 GOB Notice Of Professional Services Agreement For The Revision To The Courts Master Plan Phase 2 PDF  No Measure PDF N/A PDF No Measure No Measure N/A
12/9/15 E15-DTPW-04 Professional Services for Engineering Services for Miami-Dade PDF 0% DBE Goal N/A N/A N/A No Measure No Measure N/A
11/24/15 E15-MDT-03 Continuous Professional Services for Federally Funded Projects PDF No Measure PDF N/A N/A No Measure No Measure N/A
11/24/15 E15-WASD-18 Engineering Design and Related Services for the Improvement, Renewal and Replacement of the Hialeah and John E. Preston Water Treatment Plants, and Associated Water Distribution System, Pipelines, Wellfields, and Re-pumping Facilities, Remote Storage and its Appurtenant Water Facilities PDF 20% - SBE/ A&E Goal
   0% - SBE/ G&S Goal
PDF N/A PDF

24.00% - SBE/A&E Goal

3.00% - SBE/G&S Goal

24.00% - SBE/A&E Goal

3.00% - SBE/G&S Goal

N/A
11/24/15 E15-WASD-19 Engineering Design and Related Services for the Improvement, Renewal and Replacement of the Alexander Orr Water Treatment Plant and the South Miami-Dade Water Supply System, which includes the following plants: Leisure City, Naranja, Elevated Water Tank, Everglades Labor Camp and Newton Water Treatment Plants; and Ancillary Facilities to those plants; as well as Well Fields, Re-pumping Facilities, Remote Storage and its Appurtenant Facilities PDF 20% - SBE/ A&E Goal
0% - SBE/ G&S Goal
PDF N/A PDF

24.00% - SBE/A&E Goal

3.00% - SBE/G&S Goal

24.00% SBE/A&E Goal

3.00% - SBE/G&S Goal

N/A
10/30/15 E15-MDAD-04 Automated People Mover System Consultant at MIA PDF SBE/A&E Goal- 5%
SBE/G&S Goal- 4.5%
PDF N/A N/A

SBE/A&E Goal - 5.00%

SBE/G&S Goal - 4.50%

SBE/A&E Goal - 5.00%

SBE/G&S Goal - 4.50%

N/A
10/30/15 DB15-WASD-03 Design-Build Services for Installation of a 48-inch Diameter Water Main Downtown PDF 20% SBE-A&E Goal
8.2% SBE-Cons Goal
0.5% SBE-G&S Goal
PDF N/A PDF

4% SBE/G&S Goal

14% SBE/Cons Goal

26% SBE/A&E Goal

10% CWP Goal

4% SBE/G&S Goal

14% SBE/Cons Goal

26% SBE/A&E Goal

10% CWP Goal

N/A
10/30/15 E15-WASD-17 Hydrogeologic and Engineering Services for Disposal, Water Supply, Monitoring Wells and Aquifer Storage and Recovery Wells PDF 20% SBE-A&E Goal
0.5% SBE-G&S Goal
PDF N/A PDF

4.00% SBE/G&S Goal

25.00% SBE/A&E Goal

4.00% SBE/G&S

25.00% SBE/A&E Goal

N/A
10/29/15 E15-MDT-01 Professional Services for Additional Elevators at Dadeland North Metrorail Station PDF 0% DBE Goal PDF N/A N/A No Measure No Measure N/A
9/30/15 E15-PWWM-11 Roadway Improvements to NW 25 Street from NW 117 Avenue to NW 87 Avenue PDF SBE/A&E Goal – 30.00% PDF N/A N/A 30.00% SBE/A&E Goal 30.00% SBE/A&E Goal N/A
9/29/15 E15-PWWM-07 Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services PDF No Measure (Pre-Qualification Pool) PDF N/A N/A No Measure No Measure N/A
9/29/15 E15-PWWM-08 Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services PDF No Measure (Pre-Qualification Pool) PDF N/A N/A No Measure No Measure N/A
9/29/15 E15-PWWM-09 Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying Services PDF No Measure (Pre-Qualification Pool) PDF N/A N/A No Measure No Measure N/A
9/24/15 A15-JHS-01-A A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope A, JNMC PDF SBE/A&E Goal – 20% N/A N/A N/A 20% SBE/A&E Goal 20% SBE/A&E Goal N/A
9/24/15 A15-JHS-01-B A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope B, JHS West PDF SBE/A&E Goal – 20.5% N/A N/A N/A 20.5% SBE/A&E Goal 20.5% SBE/A&E Goal N/A
9/24/15 A15-JHS-01-C A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope C, JHS Main Campus PDF SBE/A&E Goal – 13.5% N/A N/A N/A 14%  SBE/A&E Goal 14% SBE/A&E Goal N/A
9/24/15 A15-JHS-01-D A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope D, JHS Main Campus PDF SBE/A&E Goal – 11.59% N/A N/A N/A 11.59% SBE/A&E Goal 11.59% SBE/A&E Goal N/A
9/24/15 A15-JHS-01-E A/E Consultant Services for Schematic and Comprehensive Design, Procurement and Construction Administration Services for Various Jackson Health System Facilities: Scope E, JSCH PDF SBE/A&E Goal – 13.75% N/A N/A N/A

13.75% SBE/A&E Goal

13.75% SBE/A&E Goal N/A
9/17/15 DB15-SEA-01 /2015-055 Cruise Terminal F Upgrades PDF

SBE/ Construction Goal- 9.87%%

SBE/ Good & Services Goal – 6%
                                                                        SBE/ A&E Goal- 14%

N/A N/A N/A

14% SBE/A&E Goal

6.00% SBE/G&S Goal

9.87% SBE/Construction Goal

10% CWP Goal

14% SBE/A&E Goal

6.00% SBE/G&S Goal

9.87% SBE/Construction Goal

10% CWP Goal

N/A
9/10/15 E15-MDAD-03 Environmental and Safety Management System PDF 15% SBE/A&E Goal N/A N/A N/A 15% SBE/A&E Goal 15% SBE/A&E Goal N/A
8/17/15 A15-PROS-01 PROS Full Services PSA – Costal Parks North PDF 10% SBE/AE Sub-consultant Goal N/A N/A PDF 33% SBE/A&E Goal 33% SBE/A&E Goal N/A
8/17/15 A15-PROS-02 PROS Full Services PSA – Costal Parks South PDF 10% SBE/AE Sub-consultant Goal N/A N/A PDF 33% SBE/A&E Goal 33% SBE/A&E Goal N/A
8/17/15 A15-PROS-03 PROS Full Services PSA – Region A PDF 10% SBE/AE Sub-consultant Goal N/A N/A PDF

33% SBE/A&E Goal

4% SBE/G&S Goal

33% SBE/A&E Goal

4% SBE/G&S Goal

N/A
8/17/15 A15-PROS-04 PROS Full Services PSA – Region B PDF 10% SBE/AE Sub-consultant Goal N/A N/A PDF

33% SBE/A&E Goal

4% SBE/G&S Goal

33% SBE/A&E Goal

4% SBE/G&S Goal

N/A
8/17/15 A15-PROS-05 PROS Full Services PSA – Region C PDF 10% SBE/AE Sub-consultant Goal N/A N/A PDF

33% SBE/A&E Goal

4% SBE/G&S Goal

33% SBE/A&E Goal

4% SBE/G&S Goal

N/A
8/17/15 A15-PROS-06 PROS Full Services PSA – Region D PDF 10% SBE/AE Sub-consultant Goal N/A N/A PDF

33% SBE/A&E Goal

4% SBE/G&S Goal

33% SBE/A&E Goal

4% SBE/G&S Goal

N/A
8/14/15 A15-PROS-07 ESP PROS Full Services PSA – West Kendall District Park PDF 10% SBE/AE Sub-consultant Goal
.87% SBE/GS Subcontractor Goal
N/A N/A PDF Under Review Under Review N/A
8/12/15 E15-WASD-02 Engineering Design And Related Services For The Improvement, Upgrades and Expansion of Local Wastewater Pump Stations and Related Facilities necessary for Capital Improvement Projects PDF

100% SBE/AE Set-Aside

No Measure - SBE/GS

N/A N/A PDF 100% SBE/AE Set Aside Goal 100% SBE/AE Set Aside Goal N/A
8/11/15 E15-WASD-04 Engineering Design and Related Services for the Improvement, Upgrades and Expansion of Regional Wastewater Pump Stations and Related Facilities necessary for Capital Improvement Projects PDF

20% SBE/AE Sub-consultant Goal

No Measure - SBE/GS

N/A N/A PDF

20% SBE/AE Goal

4.00% SBE/GS Goal

20% SBE/AE Goal

4.00% SBE/GS Goal

N/A
8/10/15 ASPCA- 999 ASPCA/ASD Liberty City Clinic PDF  20% SBE/A&E Goal N/A N/A N/A 20% SBE/A&E Goal 20% SBE/A&E Goal N/A
8/4/15 E15-WASD-03A Engineering Design And Related Services For The Design Of Small Diameter Water And Wastewater Pipelines For The Water And Sewer Department’s Wastewater And Water Collection, Transmission And Distribution System PDF 100% SBE/AE Set-Aside N/A N/A PDF 100% SBE/AE Set Aside Tier 3 100% SBE/AE  Set Aside Tier 3 PDF
8/4/15 E15-WASD-03B Engineering Design And Related Services For The Design Of Small Diameter Water And Wastewater Pipelines For The Water And Sewer Department’s Wastewater And Water Collection, Transmission And Distribution System PDF 20% SBE/AE Sub-Consultant Goal N/A N/A PDF 20% SBE/AE Goal 20% SBE/AE Goal PDF
8/3/15 E15-WASD-01 Engineering Design And Related Services For The Design Of Large Diameter Water And Wastewater Pipelines For The Water And Sewer Department’s Wastewater And Water Collection, Transmission And Distribution System PDF 20% SBE/AE Sub-Consultant Goal N/A N/A PDF 20% SBE/A&E Goal 20% SBE/A&E Goal N/A
7/24/15 E15-WASD-14 Water And Sewer Rates, Fee Analysis And Bond Engineering Services PDF No Measure N/A N/A PDF No Measure No Measure N/A
7/22/15 E15-WASD-13 Geotechnical Services, Special Inspections, Structural Assessments, Soils, Foundations and Materials Testing Services related to the Improvement, Upgrades and Expansions of Water and Wastewater Treatment Plants, Pump Stations, Collection, Distribution and Transmission Piping, and all related Facilities as necessary to ensure Quality Control/Assurance for Water and Sewer Department’s Capital Improvement Projects PDF 20% SBE/A&E Sub-consultant Goal N/A N/A PDF 20% SBE/A&E goal 20% SBE/A&E goal PDF
7/19/15 E15-WASD-12 Engineering Services For The Proposed Upgrades To The Miami-Dade South District Wastewater Treatment Plant And Its Appurtenant Facilities PDF 35% SBE/A&E Sub-consultant Goal N/A N/A PDF 35% SBE/A&E goal 35% SBE/A&E goal N/A
7/19/15 E15-WASD-11 Engineering Services For The Proposed Upgrades To The Miami-Dade North District Wastewater Treatment Plant And Its Appurtenant Facilities PDF 35% SBE/A&E Sub-consultant Goal N/A N/A PDF 35% SBE/A&E goal 35% SBE/A&E goal N/A
7/19/15 E15-WASD-10 Engineering Services For The Proposed Upgrades To The Miami-Dade Central District Wastewater Treatment Plant And Its Appurtenant Facilities Including Pump Stations 1 And 2 PDF 35% SBE/A&E Sub-consultant Goal N/A N/A PDF 35% SBE/A&E goal 35% SBE/ A&E Goal N/A
7/17/15 E15-MDT-02 Professional Services Agreement – Bridge Inspection and Structural Analysis PDF No Measure (Federal Funds) N/A N/A N/A No Measure No Measure N/A
6/18/15 A15-JHS-01 Jackson North Medical Center Programming, Design, Procurement and Construction Administration Services PDF 14.5% SBE-A/E Goal and 5% SBE-G&S Goal N/A N/A PDF 14.50% SBE/AE Goal 14.50% SBE/AE Goal N/A
6/15/15 E15-PWWM-02 Roadway Improvements to NE 151 Street from Biscayne Blvd. to Bay Vista Blvd. PDF 25% - SBE - A&E - Goal N/A N/A PDF Under Review Under Review N/A
5/28/15 VZMP-AE-2015 Vizcaya Museum and Gardens Master Plan Refinement PDF 20% - SBE - A&E - Goal N/A N/A PDF 22% - SBE- A&E - Goal 22% - SBE - A&E - Goal N/A
5/18/15 E15-MDAD-02 Utilities Master Plan (Sanitary Sewer) PDF 10% - SBE - A&E - Goal N/A N/A N/A 10.00%-SBE- A&E Goal 10.00%-SBE-A&E Goal N/A
5/1/15 E15-PWWM-01 Roadway Improvements to NW South River Drive from NW 32 Ave to NW 38 Ave PDF 18% - SBE - A&E - Goal N/A N/A PDF 18%-SBE-A&E-Goal 18%-SBE-A&E-Goal N/A
4/17/15 A15-PROS-01 PROS Full Services PSA’s PDF 10% - SBE - A&E - Goal PDF N/A PDF Project On Hold Project On Hold Project on Hold
4/8/15 DB14-WASD-08 Design-Build Services for the Construction of a New Drinking Water Laboratory Building at the Alexander Orr, Jr. Water Treatment Plant PDF

38% - SBE – A&E – Goal 

41.55% - SBE – Const – Goal

1.03% - SBE – G&S – Goal                                                           

N/A N/A PDF

1.03%-SBE-G&S Goal

41.55% - SBE- Const - Goal

38.00% - SBE-A&E Goal

1.03%-SBE-G&S Goal

41.55% - SBE-Const - Goal

38.00% - SBE-A&E Goal

N/A
4/7/15 DB15-ISD-01 Design-Build Services for the new Miami-Dade Police Department  Academy Building PDF 28% - SBE – A&E – Goal N/A N/A N/A 31% -SBE-A&E Goal 31%-SBE-A&E-Goal N/A
4/1/15 E15-PWWM-06 Florida Department of Transportation Local Agency Program Engineering and Design Related Professional Continuing Service Contracts for PWWM Safe Route to School Projects PDF 9.91% – DBE – Goal N/A N/A N/A 9.91% – DBE – Goal 9.91% – DBE – Goal N/A
3/23/15 DB14-WASD-06 Design-Build Services for Replacement of Water Mains and Service Conversions in the South Miami Heights Area (PHASE A) PDF

20% - SBE – A&E – Goal 

4.86% - SBE – Const – Goal                     

.25% - SBE – G&S – Goal      

N/A N/A PDF

25%-SBE-A&E - Goal

0.25% - SBE Goal

11.56% SBE-Const Goal

10% CWP Goal

25%-SBE-A&E - Goal

0.25% - SBE Goal

11.56% SBE-Const Goal

10% CWP Goal

PDF
3/23/15 DB14-WASD-07 Design-Build Services for Replacement of Water Mains and Service Conversions in the South Miami Heights Area (PHASE B) PDF

20% - SBE – A&E – Goal

4.88% - SBE – Const – Goal

.25% - SBE – G&S – Goal      

N/A N/A PDF

25%-SBE-A&E - Goal

0.25% - SBE Goal

12.01% SBE-Const Goal

10% CWP Goal

25%-SBE-A&E - Goal

0.25% - SBE Goal

12.01% SBE-Const Goal

10% CWP Goal

PDF
3/19/15 E15-PWWM-02 Construction Engineering and Inspection Services & Florida Department of Transportation Local Agency Program Compliance 
Services For Tamiami Canal Bridge Replacement
PDF 9.91% – DBE – Goal N/A N/A N/A 9.91% - DBE Goal 9.91%-DBE Goal N/A
3/19/15 E15-PWWM-03 Florida Department of Transportation Local Agency Program Compliance Services For Two (2) Projects Along NW 74 Street PDF 9.91% – DBE – Goal N/A N/A N/A 9.91% - DBE Goal 9.91% - DBE Goal N/A
3/19/15 E15-PWWM-04 Florida Department of Transportation Local Agency Program Compliance Services for Two (2) Projects: Improvements to Old Cutler Trail Bicycle Route and Bridge Rehabilitation at 328  Street Over Levee L-31-E PDF 9.91% – DBE – Goal N/A N/A N/A 9.91% - DBE Goal 9.91% - DBE Goal N/A
3/19/15 E15-PWWM-05 Florida Department of Transportation Local Agency Program Compliance Services for Various Safe Routes to School Projects, Phase 9 through 13 PDF 9.91% – DBE – Goal N/A N/A N/A 9.91% - DBE Goal 9.91% - DBE Goal N/A
3/16/15 CMJPA-2015.01 JPA between Miami-Dade County and the City of Miami for Roadway 
Improvement at NE 2 Ave from NE 20 Street to NE 36 Street
PDF 12.78% - SBE – A&E – Subcontractor Goal
                                                                    12.51% - SBE – Const – Subcontractor Goal
N/A N/A PDF

21.94%-SBE-Const Goal

12.78%-SBE-A&E Goal

21.94%-SBE-Const Goal

12.78%-SBE-A&E Goal

N/A
3/16/15 CMJPA-2015.02 JPA between Miami-Dade County and the City of Miami for Roadway 
Improvement at NE 2 Ave from NE 69 Street to NE 84 Street
PDF 12.02% - SBE – A&E – Subcontractor Goal
                                                                    11.98% - SBE – Const – Subcontractor Goal
N/A N/A PDF

12.02%-SBE -A&E Goal

21.88% - SBE - Const Goal

10% CWP Goal

12.02% - SBE- A&E Goal

21.88% - SBE- Const Goal

10% CWP Goal

N/A
3/13/15 DB14-WASD-09 Design-Build Services for Installation of a 36-Inch Diameter Sanitary Sewer Force Main in NW 107 Ave from NW 7 Street to NW 25 Street PDF 13% - SBE – A&E – Goal
                                                                    8.3% - SBE – Const – Goal
                                                                    2% - SBE – G&S – Goal      
PDF N/A PDF

20% SBE-A&E Goal

2% SBE Goal

8% SBE-Const Goal

10% CWP Goal

20% SBE-A&E Goal

2% SBE Goal

8% SBE-Const Goal

10% CWP Goal

N/A
3/4/15 AAA-3-4-2015 American Airlines Arena Restaurant Renovation PDF 10%-SBE-A&E Goal N/A N/A PDF 10% SBE-A&E Goal 10% SBE-A&E Goal N/A
3/3/15 E15-MDAD-01 Photogrammetric Mapping and Light Detection and Ranging (LIDAR) Services PDF No Measure PDF N/A N/A No Measure No Measure N/A
2/12/15 E15-MPO-01 Non-Exclusive Professional Services Agreement (PSA) for the General 
Planning Consultant (GPC) Progr
PDF 9.91% – DBE – Goal N/A N/A N/A 9.91% – DBE – Goal 9.91% – DBE – Goal N/A
1/20/15 DB14-WASD-05 Design-Build Services to Furnish and Install a 48-inch Force Main along 
North Miami Avenue from NW 8 St along to 36 St and along NE 36 St from North Miami Ave. to NE 2 Avenue
PDF 17.5% - SBE – A&E – Goal 
12.82% - SBE – Const – Goal
.25% - SBE – G&S – Goal
PDF PDF PDF

22% -SBE-A&E Goal

0.25% - SBE-G&S Goal

9.33%% -SBE-Const Goal

14.20% CWP Goal

22% -SBE-A&E Goal

0.25%-SBE-G&S Goal

9.33%-SBE-Const Goal

14.20% CWP Goal

N/A
1/13/15 DB14-MDT-01 Quail Roost Park and Ride PDF 15% – DBE – Goal N/A N/A N/A 15% – DBE – Goal 15% – DBE – Goal N/A
1/13/15 E14-MDT-01 SR 836 Express Bus Service PDF 10%  – DBE – Goal N/A N/A N/A 10%  – DBE – Goal 10%  – DBE – Goal N/A
1/8/15 E14-MDAD-02 Inspection Services and Environmental Oversight PDF 25% - SBE - A&E - Goal PDF N/A PDF 100% Set Aside Tier 2 100% Set Aside Tier 2 N/A
12/30/14 DB14-WASD-03 Design-Build Services for the Installation of a 48-inch diameter Water 
Transmission Main for Area N
PDF 15% - SBE – A&E – Goal           7.20% - SBE – Const – Goal
0.25% - SBE – G&S – Goal
PDF N/A PDF

21% - SBE-A&E Goal

0.18%-SBE-A&E Goal

7.20% - SBE - Cons Goal

21% - SBE-A&E Goal

0.18%-SBE-A&E Goal

7.20% - SBE - Cons Goal

N/A
12/19/14 E14-MDAD-03 Fueling System Consulting Services at MIA and GAA’s PDF 15% - SBE - A&E - Goal PDF N/A N/A Under Review Under Review N/A
12/15/14 E14-RER-01 Professional Service Agreement for Environmental Cleanup, Compliance and 
Related Services for Miami-Dade County Facilities
PDF Set-Aside PDF PDF PDF 100% 2nd Tier Setaside 100% 2nd Tier Setaside N/A
12/15/14 E14-RER-03 Professional Service Agreement for Environmental Cleanup, Compliance and 
Related Services for Miami-Dade County Facilities
PDF 5% - SBE - A&E - Goal PDF PDF PDF 15%-SBE-A&E Goal 15%-SBE-A&E Goal N/A
12/12/14 A14-ISD-02 Professional Service Agreement for the Richmond Heights Shopping Center PDF 11% - SBE - A&E - Goal PDF N/A PDF

Set Aside Tier 1

100% SBE- A&E Goal

Set Aside Tier 1

100% SBE- A&E Goal

N/A
11/21/14 E14-PWWM-09 Non-exclusive Professional Service Agreement for South Miami Avenue 
Streetscape Improvements from 15 Rd to 8 St
PDF 20% - SBE - A&E - Goal PDF N/A PDF SBE-A&E 28% Goal SBE-A&E 28% Goal PDF
11/5/14 E14-PWWM-08 Non-exclusive Professional Service Agreement for Bond Engineering Services. PDF CBE - 5% Goal
                                                        
SBE - Goods & Services - No Measure
PDF N/A PDF

SBE - A&E- 16% Goal

SBE - Goods & Services - No Measure 

SBE - A&E - 16% Goal

SBD-Goods & Services - No Measure

N/A
10/30/14 E14-WASD-02 NTPC for Professional Cost Estimating and Scheduling Services PDF

25% CBE Goal

.5% SBE Goal

PDF N/A PDF

0.05% SBE - Goods & Services

30.00% SBE - A&E

0.05% SBE - Goods & Services

30.00% SBE - A&E

N/A
10/17/14 59250014004 Zoo Miami – Animal Hospital Expansion PDF 13% CBE Goal PDF N/A N/A 13% CBE Goal 13% CBE Goal N/A
9/29/14 E14-PWWM-10 FDOT Local Agency Program Compliance Services for Various Projects PDF 9.91% DBE Goal N/A N/A N/A No Measure No Measure N/A
8/14/14 E14-PA-01 Professional Services Agreement for Digital Referenced Oblique Aerial Imagery Solutions and Optional Orthophotography Services PDF No Measure N/A N/A N/A

CBE No Measure      

SBE No Measure

CBE No Measure             

SBE No Measure

N/A
8/14/14 E14-PWWM-07 CEI Services & FDOT LAP Compliance Services for the Tamiami Canal Bridge Replacement PDF 8.6% DBE Goal N/A N/A N/A No Measure No Measure N/A
8/1/14 E14-SEA-01R Professional Services Agreement for A&E Services for Management Financial Consulting and Bond
Engineering Services
PDF 6% CBE Goal
SBE No Measure
PDF N/A PDF

6% CBE Goal

SBE No Measure

6% CBE Goal

SBE No Measure

N/A
7/25/14 E14-WASD-03 Professional Engineering Services Relating to The Operations and Maintenance of The Water and 
Sewer Department’s Water System
PDF 32% CBE Goal PDF N/A PDF

1% SBE Goal

32% CBE Goal

1% SBE Goal

32% CBE Goal

N/A
7/21/14 E14-PWWM-01 Non-Exclusive Professional Services Agreement for Roadway Improvements to West Dixie Highway from NE 164th Street to NE 173rd Street PDF 7% CBE Goal PDF N/A N/A

1st Tier Setaside

100% CBE Goal

1st Tier Setaside

100% CBE Goal

N/A
7/21/14 E14-PWWM-03 Non-Exclusive Professional Services Agreement for Roadway Improvements for NW 97 Ave from NW 58th Street to NW 70th Street PDF 8% CBE Goal PDF N/A N/A

1st Tier Setaside

100% CBE Goal

1st Tier Setaside

100% CBE Goal

N/A
7/11/14 DB14-PWWM-01 Design-Build Services for The Venetian Causeway Bridge Rehabilitation - Street Bridge # 874459 PDF

No Measure SBE  

No Measure CBE  

Trade Set-Aside

PDF N/A N/A

No Measure SBE  

No Measure CBE 

Trade Set-Aside – Pavement Markings and Traffic Signage

No Measure SBE

No Measure CBE

Trade Set-Aside – Pavement Markings and Traffic Signage

N/A
5/20/14 A14-JHS-02 Consultant Services for Functional Space Programming, Comprehensive Design, Procurement And Constructional Administration Services for a New Rehabilitation Hospital PDF 9% CBE Goal PDF N/A PDF 18% CBE Goal 18% CBE Goal N/A
5/5/14 A14-ISD-01 GOB ESP Professional Services Agreement  for the Mental Health Facility Renovation PDF 14% CBE Goal PDF N/A N/A 28% CBE Goal 28% CBE Goal N/A
4/4/14 E14-PWWM-05 Design Services for The Replacement of the North Miami Ave North of NW 146th Street Bridge PDF 10% CBE Goal PDF N/A PDF 1st Tier Set Aside -100% 1st Tier Set Aside-100% N/A
4/4/14 E14-PWWM-06 Design Services for The Replacement of the NW 32nd Ave and NW 151st Street Bridge # 874032
E14-PWWM-06 – Project Package
PDF 10% CBE Goal PDF N/A PDF

1st Tier Set Aside

1st Tier Set Aside N/A
4/4/14 E14-WASD-01 Professional Engineering and Geological Services for Water, Wastewater and Reclaimed Water  Planning Services PDF 25% CBE Goal PDF N/A N/A 30% CBE Goal 30% CBE Goal N/A
3/27/14 E13-SEA-04 Non-exclusive Professional Services Agreement for Marine Infrastructure Services PDF 15% CBE Goal PDF N/A N/A 15% CBE Goal 15% CBE Goal N/A
3/25/14 E14-PW-02 Non-exclusive Professional Services Agreement for Roadway Improvements to NW 58th Street from NW 97th Ave to SR-826 PDF 11% CBE Goal PDF N/A PDF 100% 1st Tier Setaside 100% 1st Tier Setaside N/A
3/14/14 E14-SEA-01 Non-Exclusive Professional Services Agreement for Management Financial Consulting and Bond Engineering Services PDF 4% CBE Goal PDF N/A N/A 6% CBE Goal 6% CBE Goal N/A
3/11/14 DB14-WASD-01 Design-Build Services for Replacement of 72-inch Sanitary Sewer Force Main along NW/NE 159th Street between NW 17th Ave and NW 10th Ave PDF 25% CBE Goal
                              10% CSBE Goal
PDF N/A PDF

15.50% CSBE Goal

10% CWP Goal

30% CBE Goal

15.50% CSBE Goal

10% CWP Goal

30% CBE Goal

N/A
3/10/14 A14-JHS-01 Consultant Services for the JHS West Wing 9th, 10th and 11th Floor Modernization PDF 30% CBE Goal PDF N/A N/A 1st Tier Set aside - 100% 1st Tier Set aside - 100% N/A
3/7/14 E13-WASD-11 Owner’s Representative for Professional Engineering Services relating to the State of Florida’s 
Ocean Outfall Legislation and Miami-Dade County’s Wastewater System
PDF 22% CBE Goal PDF N/A PDF 28% CBE Goal 28% CBE Goal N/A
1/31/14 A14-CUA-01 Professional Services Agreement for Architecture & Engineering Services PDF 15% CBE Goal PDF N/A PDF 20% CBE Goal 20% CBE Goal N/A
1/28/14 E13-WASD-10 Capacity Management, Operation, and Maintenance Services Related to the Consent Decree PDF 19% CBE Goal PDF N/A PDF 25% CBE Goal 25% CBE Goal N/A
1/17/14 E14-SEA-01 Non-exclusive Professional Services for Management Financial Consulting and Bond Engineering Services PDF 5% CBE Goal TBD N/A N/A 5% CBE Goal 5% CBE Goal N/A
12/20/13 E13-RER-02 Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities PDF 12% CBE Goal (on each of the six (6) Agreement) PDF N/A N/A 14% CBE Goal 14% CBE Goal N/A
12/17/13 A13-MDAD-01 ESP MIA Concourse H Roof Replacement and Miscellaneous Repairs PDF 30% CBE Goal PDF N/A PDF 1st Tier Set Aside 100% 1st Tier Set Aside 100% N/A
12/16/13 A13-MDAD-02 ESP MIA Building 863 Roof Replacement PDF 30% CBE Goal PDF N/A PDF 1st Tier Set Aside 100% 1st Tier Set Aside 100% N/A
12/5/13 DB13-WASD-03 Design-Build Services for Replacement of Water Mains and Service Conversions in The Shenandoah Area (Phase A) PDF 20% CBE Goal
                              16% CSBE Goal
PDF N/A N/A

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

N/A
12/5/13 DB13-WASD-04 Design-Build Services for Replacement of Water Mains and Service Conversions in The Shenandoah Area (Phase B) PDF 20% CBE Goal
                              16% CSBE Goal
PDF N/A N/A

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

26% CBE Goal

20% CSBE Goal

12.4% CWP Goal

N/A
12/2/13

A13-SEA-02 (Resubmittal)

Professional Services Agreement for Architectural and Engineering Services for PortMiami Cruise Terminals PDF 15% CBE Goal PDF N/A PDF 15% CBE Goal 15% CBE Goal N/A
12/2/13 A13-SEA-04 Professional Services Agreement for Architectural and Engineering Services for PortMiami Cruise Terminals PDF Tier II CBE Set-Aside (exemption of T.C. 5.05) PDF N/A PDF

Set Aside Tier 2 (w/exempt)

100% CBE Goal

Set Aside Tier 2 (w/exempt)

100% CBE Goal

N/A
11/8/13 A13-ISD-04 GOB Professional Services Agreement for Surveying and Implementation of Stephen P. Clark Center – ADA Barrier Removal PDF 100% CBE Set-Aside PDF N/A PDF 1st Tier Set Aside 1st Tier Set Aside N/A
11/8/13 A13-CUA-02 Professional Services Agreement for A&E Services PDF 10% CBE Goal PDF N/A PDF 28% CBE Goal 28% CBE Goal N/A
11/7/13 E13-WASD-05 Design Services for Wastewater Treatment Plants Related to Consent Decree Projects PDF 25% CBE Goal PDF N/A PDF 30% CBE Goal 30% CBE Goal N/A
10/11/13 E13-WASD-06 Capacity Management, Operation, and Maintenance Services Related to the Consent Decree Projects PDF 32% CBE Goal PDF N/A PDF 32% CBE Goal 32% CBE Goal N/A
10/11/13 E13-WASD-07 Engineering Services for Geographic Information Systems Utility Backlog Required by the Consent Decree PDF 15% CBE Goal PDF PDF PDF 20% CBE Goal 20% CBE Goal N/A
10/8/13 E13-WASD-04 Design Services for Wastewater Collection and Transmission Systems Related to the Consent Decree Projects PDF 22% CBE Goal PDF N/A PDF

30% CBE Goal

30% CBE Goal N/A
9/10/13 A13-ISD-01  GOB ESP Non-Exclusive Professional Services for the Renovations to the Culmer Neighborhood Service Center PDF Tier 1 CBE Set-Aside TBD N/A PDF TBD TBD N/A
8/26/13 E13-WASD-03 (five (5) Agreements) Design Services for the Implementation of a Pump Station Improvement Program PDF 40% CBE Goal PDF PDF PDF 40%CBE Goal 40% CBE Goal N/A
8/22/13 E13-RER-01 (six (6) Agreements) Environmental Cleanup, Compliance and Related Services for Miami-Dade County Facilities PDF (1) Tier 2 CBE Set-Aside PDF N/A PDF

1 Agreement -CBE Tier 2 Set-Aside

3 Agreements-9% CBE goal

2 Agreements-No Measure

1 Agreement -CBE Tier 2 Set-Aside

3 Agreements-9% CBE goal

2 Agreements-No Measure

N/A
8/12/13 A13-CUA-01 Professional Services Agreement for A/E Services PDF 20% CBE Goal N/A N/A PDF 28% CBE Goal 28% CBE Goal N/A
8/7/13 P252A-OSC-B702A-J104A-3 MIA Operating System and O & M Oversight Services Consultant (OSC) for the Satellite E & Other MIA APM Operating Systems PDF Bid Waiver & 10% CBE Goal N/A N/A N/A Bid Waiver & 10% CBE Goal 10% CBE Goal N/A
8/1/13 E13-SEA-01 Non-Exclusive Professional Services Agreement for Civil Infrastructure Engineering Services PDF 25% CBE Goal N/A PDF N/A 25% CBE Goal 25% CBE Goal N/A
8/1/13 E13-SEA-02 Non-Exclusive Professional Services Agreement for Civil PDF 18% CBE Goal N/A PDF N/A 18% CBE Goal 18% CBE Goal N/A
8/1/13 E13-SEA-03 Non-Exclusive Professional Services Agreement for Marine Infrastructure Engineering Services PDF 22% CBE Goal N/A N/A N/A 22% CBE Goal 22% CBE Goal N/A
8/1/13 E13-SEA-04 Non-Exclusive Professional Services Agreement for Marine Infrastructure Engineering Services PDF 22% CBE Goal N/A N/A N/A 22% CBE Goal 22% CBE Goal N/A
7/23/13 A13-SEA-03 Non-Exclusive Professional Services Agreement for Architectural and Engineering Services for PortMiami Federal Inspection Facility PDF 19% CBE Goal N/A PDF PDF 19% CBE Goal 19% CBE Goal N/A
7/11/13 DB13-WASD-01 Design-Build Services for Gravity Sewer Interceptors for Pump Station No. 3 PDF 16.5% CBE Goal & 11.2% CSBE Goal N/A N/A PDF 17.50% CBE Goa & 11.20% CBE Goal

17.50% CBE Goal & 11.20% CBE Goall

N/A
7/8/13 A13-ISD-02-GOB Non-Exclusive Professional Services for Preparation of Design Criteria Package for the Mental Health Facility Renovation PDF 25% CBE Goal TBD N/A PDF 28% CBE Goal 28% CBE Goal N/A
7/2/13 A13-MDAD-01 MIA Concourse H Roof Replacement and Miscellaneous Repairs PDF 30% CBE Goal TBD N/A N/A 30% CBE Goal 30% CBE Goal N/A
7/2/13 A13-MDAD-02 MIA Building 863 Roof Replacement PDF 30% CBE Goal TBD N/A N/A 30% CBE Goal 30%CBE Goal  
6/27/13 P252A MIA Satellite E APM System Replacement PDF 12% CBE Goal & Bid Waiver N/A N/A   12% CBE Goal & Bid Waiver 12% CBE Goal & Bid Waiver  
5/15/13 E13-WASD-01-R Non-Exclusive Professional Services Agreement for Program and Construction Management Services Related to the Wastewater System PDF 28% CBE Goal N/A None N/A 28% CBE Goal 28% CBE Goal N/A
5/15/13 E13-WASD-02-R Non-Exclusive Professional Services Agreement for Program and Construction Management Services for the Implementation of a Pump Station Improvement Program PDF 29% CBE Goal N/A None N/A 29% CBE Goal 29% CBE Goal N/A
5/14/13 A13-SEA-02 Architectural and Engineering Services for PortMiami Cruise Terminals PDF 15% CBE Goal PDF None PDF 15% CBE Goal 15% CBE Goal N/A
5/2/13 123203-13-002 Ives Estate District Park – Multipurpose Synthetic Field and Scoreboard PDF 23% CBE Goal TBD PDF N/A 32% CBE Goal 32% CBE Goal N/A
4/18/13 E13-MDAD-02 Pavement Management Systems PDF 20% CBE Goal TBD PDF PDF 15% CBE Goal 15% CBE Goal N/A
4/5/13 EOI-02-08 (Parcel A) Expression of Interest for Development Sites at MIA (Business Park) PDF 10% CBE Goal
                              14.3% CSBE Goal
TBD None N/A 10% CBE Goal
14.35% CSBE Goal
10% CBE Goal
14.35% CSBE Goal
N/A
4/5/13 EOI-02-08 (Parcel B) Expression of Interest for Development Sites at MIA (Convenience Center) PDF 10% CBE Goal
                              14.3% CSBE Goal
TBD None N/A 10% CBE Goal
14.35% CSBE Goal
10% CBE Goal
14.35% CSBE Goal
N/A
4/5/13 EOI-02-08 (Parcel C) Expression of Interest for Development Sites at MIA (Hospitality Center) PDF 10% CBE Goal
                              14.3% CSBE Goal
                              1% SBE Goal
TBD None N/A 10% CBE Goal
14.3% CSBE Goal
1% SBE Goal
10% CBE Goal
14.35% CSBE Goal
1% SBE Goal
N/A
4/2/13 E13-WASD-02 Non-Exclusive Professional Services Agreement for Program and Construction Management Services for the Implementation of a Pump Station Improvement Program PDF 19% CBE Goal TBD PDF TBD 24% CBE Goal 24% CBE Goal N/A
4/2/13 E13-WASD-01 Non-Exclusive Professional Services Agreement for Program and Construction Management Services Related to the Wastewater System PDF 12% CBE Goal TBD PDF TBD 18% CBE Goal 18% CBE Goal N/A
3/25/13 A13-SEA-01 Professional Services Agreement for Port Miami Portwide Wayfinding PDF 25% CBE Goal PDF N/A PDF 25% CBE Goal 12% CBE Goal N/A
3/22/13 E13-MDT-01 Miami-Dade Transit Fiscal Year 2015-2024 Transit Development Plan PDF 4% CBE Goal TBD N/A PDF PDF 25% CBE Goal N/A
3/18/13 E13-MDAD-01 Aviation Planning Consultant Services PDF 15% CBE Goal None N/A N/A 15% CBE Goal 15% CBE Goal N/A
3/5/13 A12-HT-01 Professional Services Agreement For A&E Services PDF 10% CBE Goal PDF PDF PDF Tier 1 CBE Set-Aside 28% CBE Goal PDF
1/18/13 A12-SEA-01 Professional Services Agreement For Architectural and Engineering Services for The Port of Miami Cruise Terminals and Central Examination Facilities PDF 14% CBE Goal PDF PDF N/A 15% CBE Goal 15% CBE Goal N/A
1/17/13 DB12-WASD-01 Replacement of Existing 54” Sanitary Sewage FM Pipeline from CDWWTP to Fisher Island Under Norris Cut Channel PDF

20% CBE

11% CSBE Goal

PDF N/A PDF

22% CBE Goal

10.9% CSBE Goal

22% CBE Goal

10.9% CSBE Goal

N/A
12/10/12 e12-PWWM-03 Miscellaneous Professional Services Agreements to Provide Materials Testing/Consulting/Training Services PDF No Measure N/A N/A N/A No Measure – Pool PSA No Measure – Pool PSA  N/A
12/10/12 e12-PWWM-02 Miscellaneous Professional Services Agreements to Provide Soils, Foundations, and Materials Testing Services PDF No Measure N/A N/A N/A No Measure – Pool PSA No Measure – Pool PSA  N/A
12/10/12 e12-PWWM-01 Miscellaneous Professional Services Agreements to Provide General Land and Engineering Surveying PDF No Measure N/A N/A N/A No Measure – Pool PSA No Measure – Pool PSA  N/A
11/24/12 A12-CUA-02 Miscellaneous Professional Services Agreement for A&E Services PDF No Measure PDF PDF PDF Tier 1 CBE Set-Aside (Exemption for Specialty Services) 10% CBE Goal PDF
11/13/12 DB12-ISD-01 Design-Build Services for the New MDPD Academy Building PDF 28% CBE Goal & 21% CSBE Goal N/A N/A N/A 28% CBE Goal (resubmittal – 5/11/2011) 21% CSBE Goal (resubmittal – 5/11/2011) 28% CBE Goal (resubmittal – 5/11/2011) 21% CSBE Goal (resubmittal – 5/11/2011) N/A
11/07/12 A12-CUA-02 Professional Services Agreement for Architectural and Engineering  Services PDF 10% CBE Goal PDF N/A PDF TBD TBD  
10/05/12 E12-SEA-03 Nonexclusive Professional Services Agreement for Port of Miami Deep Dredge Monitoring Services PDF  8% CBE Goal PDF  N/A PDF  TBD  8% CBE Goal  N/A
10/05/12 E12-WASD-04 CONTRACT ADMINIS. AND CONSTRUCTION MANAGEMENT SERVICES - REPLACEMENT OF THE
54-INCH SANITARY SEWAGE FORCE MAIN PIPELINE WITH A 60-INCH SANITARY SEWAGE FORCE MAIN PIPELINE
FROM FISHER ISLAND (UNDER THE NORRIS CUT), TO THE CDWTP AT VIRGINIA KEY (SIC 871)
PDF 25% DBE Goal PDF N/A N/A 27% CBE Goal 27% CBE Goal  N/A
09/18/12 ITB-MDAD-04-12 (A&E) Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 PDF 22.24% CBE Goal PDF N/A N/A 35% CBE Goal 35% CBE Goal  
09/18/12 ITB-MDAD-04-12 (A&E-CIS) Invitation to Bid – Satellite E APM Replacement and O&M Services Project Phases 1 and 2 PDF 35% CBE Goal PDF N/A N/A 27% CBE Goal 27% CBE Goal  
09/18/12 E12-WASD-03 Non-Exclusive Professional Services Agreement for a Program Management Consultant and Related Services PDF 10% CBE Goal PDF PDF PDF 25% CBE Goal 25% CBE Goal  
08/06/12 E12-SEA-02 Non-Exclusive Professional Services Agreement for Geographic Information System Services PDF 20% CBE Goal PDF N/A PDF 20% CBE Goal 20% CBE Goal  
06/21/12 E12-MPO-03 Non-Exclusive Professional Services Agreement (PSA) for the Regional Transportation Plan for Southeast Florida (2040 RTP) Program PDF 8.6% DBE Goal PDF N/A N/A 8.6% DBE Goal 25% CBE Goal  
06/18/12 E12-MPO-01 Non-Exclusive Professional Services Agreement (PSA) for the 2040 Long Range   Transportation Plan PDF 8.60% DBE Goal PDF N/A N/A 8.60% DBE Goal 8.60% DBE Goal  
06/16/12 E12-SEA-01 Cargo Gate Modifications and Improvements PDF 25% CBE Goal PDF N/A N/A 25% CBE Goal 25% CBE Goal  
05/16/2012 E11-PWWM-01 Bond Engineering Services PDF No Measure PDF N/A PDF No Measure No Measure  
04/25/2012 E12-WASD-02 Non-exclusive Professional Services for the Replacement/Rehabilitation
   of a 72-inch Sanitary Sewage Force Main along NW/NE 159th Street between
   NW 17th Ave and NE 10th Ave
PDF 15% CBE Goal PDF N/A PDF Tier 1 CBE Set-Aside 25% CBE Goal  

02/22/2012

DB10-GSA-01

Design-Build Services for the New MDPD Academy Building

PDF

28% CBE Goal
21.10% CSBE Goal

N/A

N/A

N/A

28% CBE Goal
21.10% CSBE Goal

28% CBE Goal
21.10% CSBE Goal

N/A

12/30/2011

DB10-GSA-02

Design Build Services to Renovate/Retrofit Existing Mental Health Facility

PDF

12% CBE Goal & 21% CSBE Goal

PDF

Resubmittal

TBD

15% CBE Goal
21% CSBE Goal
11.5% CWP Goal

15% CBE Goal 21% CSBE Goal 11.5% CWP Goal

N/A

11/28/2011

E11-SEA-03

Non-Exclusive Professional Services for Program Management Consultant (PMC)

PDF

14% CBE Goal

PDF

PDF

PDF

19% CBE Goal

19% CBE Goal

Comments

09/31/11

E03-SEA-05-2

Area 2 (Bay 177-183) Construction of Seawall

PDF

No Measure - Awarded

N/A

N/A

N/A

No Measure - Awarded

No Measure - Awarded

N/A

09/28/2011

E11-MDAD-02

Stormwater Master Plan

PDF

5% CBE Goal

PDF

N/A

PDF

5% CBE Goal

5% CBE Goal

N/A

08/16/11

A11-OCI-01

Non-Exclusive Professional Services Agreement for Construction Inspection Services (CIS)

PDF

(Two Agreements) -  i. 1st  Tier CBE Set-Aside    ii. 30% CBE Goal

PDF

N/A

PDF

(Two Agreements) - 1st Tier CBE Set-Aside & 30% CBE Goal

(Two Agreements) - 1st Tier CBE Set-Aside & 30% CBE Goal

N/A

07/19/2011

A11-SEA-02

Non-Exclusive Professional Services Agreement for Portwide Wayfinding

PDF

25% CBE Goal

PDF

N/A

PDF

25% CBE Goal

25% CBE Goal

N/A

06/21/11

A11-PARK-01 GOB ESP

Westchester Cultural Arts Center

PDF

15.4% CBE Goal

PDF

N/A

PDF

27% CBE Goal

27% CBE Goal

Industry Feedback

06/03/2011

E11-SEA-01

No Exclusive Professional Services for Environmental Services

PDF

30% CBE Goal

PDF

N/A

PDF

30% CBE Goal

30% CBE Goal

N/A

05/24/2011

A11-GSA-01 GOB ESP

Design Services for Renovation/Expansion of History Miami

PDF

18% CBE Goal

PDF

A11-GSA-01 GOB ESP – Resubmittal

PDF

Project Canceled

Project Canceled

Standing Review Committee deferred item for further analysis

05/20/2011

A11-SEA-03

Cruise Terminal F & G Remodeling

PDF

23% CBE Goal

PDF

N/A

PDF

1st Tier CBE Set-Aside

1st Tier CBE Set-Aside

N/A

If you cannot view PDF PDF files, you can download Acrobat Reader  for free from Adobe Systems, Inc. In order to use PDF files, you must have Acrobat installed on your computer.

Back to Top Page Last Edited: Mon Nov 20, 2017 1:22:51 PM
smallbusiness
Business Development
 
 
Corner
Corner

You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.

Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.