miamidade.gov | Departments | Government
 
space
Transit
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | Transit Resources | Rider Tools | News and Events | About MDT | Contact Us | miamidade.gov
    space
    space
    Transit Resources space
  • Metrobus
  • Metrorail
  • Metromover
  • Schedules and Routes
  • Fares & Passes
  • Corporate Discount
  • Transit Watch
  • Paratransit (STS)
  • Accessible Services
  • South Miami-Dade Busway
  • Airport Connections
  • Airport Link project
  • Metrobus Park & Ride
  • Bike & Ride
  • space
    Rider Tools space
  • Trip Planner
  • Buy/Load an EASY Card
  • Where is the Train?
  • MDT Mobile Services
  • Rider Alerts Registration
  • Elevators/Escalators
  • STS Confirm/Cancel
  • Transit Service Center
  • space
    News and Events space
  • News Releases
  • Transit Summit
  • Black History Tours
  • Publications Library
  • Calendar
  • Transit Reports
  • Photo Gallery
  • space
    About MDT space
  • About the Director
  • Facts at a Glance
  • Feedback Zone
  • Advertising on Transit
  • Business Opportunities
  • Holiday Schedule
  • How We're Green
  • Business Plan
  • History
  • space
    space space
    Print Print Email this page E-mail Page Contact Webmaster Contact Webmaster Bookmark and Share
    space
    space
    Orange Line Phase 3: East-West Corridor Metrorail Extension


    Project Description

    Miami-Dade Transit proposes to construct approximately 10 - 13 mile Metrorail extension known as the Orange Line Phase 3: East-West Corridor Metrorail Extension from the Miami Intermodal Center (MIC) at Miami International Airport (MIA) to Florida International University (FIU) and points west to SW 137th Avenue.  A Build alternative consisting of an extension of Metrorail service west from the MIC will be evaluated against a No-Build or a Baseline/Transportation System Management (TSM) alternative.

    The area adjacent to the Orange Line Phase 3/East-West has seen significant growth in recent years.  The population of Miami-Dade County was more than 2.2 million in 2000, an increase of 16% from 1990.  The project area currently has more than 195,000 residents in 68,000 households and some 180,500 jobs.  Official growth forecasts indicate that growth in the project area will continue with population increasing by 44,000 (23%) in 2030 and jobs increasing by 60,000 (33%).

    The existing transportation system has been unable to accommodate the traffic associated with the population and employment growth in the corridor. Anticipated growth in the area will remain a considerable hindrance to the mobility to, from, and through the corridor.

    space
    space
    Transit Development
    space
    East-West Corridor Project
    space
    Public Involvement
    space
    space
    space
    space
    Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  ADA Notice  |  Phone Directory  |  Contact Us
    © 2010 Miami-Dade County. All rights reserved.
    Miami-Dade County Logo