Service Center | County Agencies | County Hall
 
space
Transit
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | Transit Resources | Rider Tools | News and Events | About MDT | Contact Us | miamidade.gov
    space
    space
    Transit Resources space
  • Metrobus
  • Metrorail
  • Metromover
  • Schedules and Routes
  • Fares & Passes
  • MIC-EH Connector Project
  • Transit Watch
  • Accessible Services
  • South Miami-Dade Busway
  • Airport Connections
  • Metrobus Park & Ride
  • Bike & Ride
  • space
    Rider Tools space
  • Trip Planner
  • Buy a Metropass
  • Where is the Train?
  • MDT Mobile Services
  • Rider Alerts Registration
  • Elevators/Escalators
  • STS Confirm/Cancel
  • Transit Service Center
  • space
    News and Events space
  • News Releases
  • Black History Tours
  • Publications Library
  • Calendar
  • Transit Reports
  • Photo Gallery
  • space
    About MDT space
  • About the Director
  • Business Plan
  • Proposed Transit Corridors
  • Facts at a Glance
  • How We're Green
  • History
  • Feedback Zone
  • Business Opportunities
  • Advertising on Transit
  • Job Search
  • space
    space space
    Print Print Email this page E-mail Page Contact Webmaster Contact Webmaster Bookmark and Share
    space
    space
    Miami Intermodal Center (MIC) - Earlington Heights Connector

    Previous Meetings

    March 2008

    January 2008

    • Informational Meeting for General Contractors & Subcontractors
      Meeting Date:
      Friday, January 25, 2008
      Meeting Location: Greater Miami Chamber of Commerce
      Ray Goode/Ryder Conference Center, Radisson Hotel
      1601 Biscayne Boulevard
      Miami, FL 33132
      • The purpose of the meeting was to present the upcoming construction contract procurement for the Orange Line – Phase 1: Miami Intermodal Center (MIC)/Earlington Heights Connector. The proposed construction bid will be advertised in March 2008. The estimated construction cost is approximately $290 million. Construction is scheduled to begin by late 2008 and is estimated to be completed by late 2011. The project consists of 2.4 miles of elevated dual track guideway, one Metrorail station at the MIC, and a bus terminal plaza. The meeting presentation covered the alignment, station, systems engineering, guideway structure, and track work. Information was provided on right-of-way status, project schedule, insurance, and Disadvantaged Business Enterprise (DBE) goals.

    May 2006

    • Prior public meetings were held on May 15 and 17, 2006 during the Preliminary Engineering phase.


    County Calendar Icon- Click to access Transportation Event information.
    View all transportation events on the Miami-Dade County calendar.

    For additional information, contact:
    Public Involvement
    786-469-5074
    ADRIANA@miamidade.gov

    Comments and Suggestions

    space
    space
    Transit Development
    space
    MIC-Earlington Heights
    space
    Public Involvement
    space
    space
    space
    space
    Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
    © 2009 Miami-Dade County. All rights reserved.
    Miami-Dade County Logo

    You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.

    Please click 'OK' to be sent to the new site.