Design Professionals
- Design & Construction Standards
- E-Plans Review
Design & Construction Standards
- Preface
- Organization
- Table of Standards
Donation Standard Specifications and Details for Design and Construction -- Table
All the files below are presented in
PDF format, or
DWG format where noted.
- Preface
- Organization
- Part I - Donation Utility Construction
- Part II - General Provisions
- Part III - General Material & Methods of Construction
- Part IV - MDWASD Standard Details
- Part V - Appendices
|
Division 1 - General Requirements
|
||
|
|
Title |
Issue Date |
| 01005 | Defined Terms | 12-2006 |
| 01011 | Site Conditions | 8-1999 |
| 01016 | Safety Requirements and Protection of Property | 2-2009 |
| 01018 | Environmental Contamination | 2-2009 |
| 01031 | Grades, Lines and Levels | 1-1999 |
| 01090 | Reference Standards | 1-1999 |
| 01100 | Special Project Procedures | 5-2000 |
| 01150 | Preconstruction Conference | 1-1999 |
| 01340 | Shop Drawings | 5-2000 |
| 01581 | Sub-Aqueous Pipeline Crossing Signage | 1-2010 |
| 01600 | Materials and Equipment Shipping, Handling, Storage and Protection | 8-1999 |
| 01710 | Cleaning | 1-1999 |
| 01720 | Project Record Documents | 6-2005 |
| 01725 | Project As-Builts | 1-1999 |
| 01730 | Operating and Maintenance Data | 1-1999 |
| 01740 | Permits | 8-1999 |
| 01750 | Maintenance of Traffic and Public Streets | 8-1999 |
| 01775 | Magnetic Media Submittals | 1-1999 |
ˆ top
Part V - Appendices
Appendix A - Pump Station Design Package
Pump Station Design Package (PSDP-4/96) (3 Pages)
Pump Station Technical Plans Review and Approval Transfer Form (PSPR-4/96) (1 Page)
Appendix B - Supplemental Design Guidelines for Lift Stations and Force Mains (66 pages)
(Developed through WASD Pump Station Improvement Program, May 1994, Revised Jan. 1999)
Appendix C - Sewer Pump Station Guidelines (3 Pages)
(Developed by WASD Engineering Division Staff, Revised Jan. 1999)
Appendix D - Basic Guide to Corrosion Protection (24 Pages)
(Developed by WASD Engineering Division Staff, May 1996)
Appendix E - Standard Pump Station Drawings
|
Sheet No.
|
Title
|
|
|
Drawing No.
|
| C-1 | Cover Sheet |
![]() |
![]() |
S-00000-A |
| C-2 | Site Plan, Legend and Notes |
![]() |
![]() |
S-00000-A |
| A-1 | Emergency Generator Building, Floor Plan, Sections and Details |
![]() |
![]() ![]() |
S-00000-A |
| S-1 | Structural Plan, Sections and Details |
![]() |
![]() ![]() |
S-00000-A |
| S-2 | Emergency Generator Building Foundation Plan, Floor Plan and Sections |
![]() |
![]() |
S-00000-A |
| S-3 | Structural General Notes |
![]() |
![]() ![]() |
S-00000-A |
| M-1 | Mechanical Plan, Sections, Details and Pump Data |
![]() |
![]() |
S-00000-A |
| E-1 | Electrical Site Plan, Power/Control and Wiring Schedule |
![]() |
![]() |
S-00000-A |
| E-2 | Electrical Control Panel and Details |
![]() |
![]() |
S-00000-A |
| E-3 | Emergency Generator Building Electrical Floor Plan and Legend |
![]() |
![]() |
S-00000-A |
| E-4 | R. T. U. Installation Wiring Diagrams |
![]() |
![]() |
S-00000-A |
| E-6 | Electrical General Notes |
![]() |
![]() |
S-00000-A |
Appendix F - Turbine Meter Guidelines
|
Sheet No.
|
Title
|
|
|
Drawing No.
|
| WM-1 | Design Guidelines for Turbine Meters 4" to 10" with By-Pass | W-00000-A |
Construction Complaint Unit
(Non-billing)
786-552-8970
Call Before You Dig
Sunshine State One Call of Florida
Call 8-1-1
www.callsunshine.com
Read the Water & Sewer Department's
Rules & Regulations
Implementing Order 10-8
You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.
Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.
Home



