Water & Sewer Department
Where am I? »

Requesting Re-Platting / Permanent Closure of Roads with Existing Water and Sewer Infrastructure

In some cases, a developer may wish to redevelop an area with existing roads and other infrastructure.  The developer may wish to re-plat the property, building over existing roads and infrastructure.

In such a case, the Miami-Dade Water and Sewer Department (in addition to any other agencies involved) would need to determine if there is any water and sewer infrastructure that may be affected by the proposed re-platting.

If there is existing water and sewer infrastructure in an area you wish to re-plat-to include the permanent closure of roads wherein the water and sewer infrastructure is contained-you must submit the following documents and information to WASD:

  • A request in writing from the property owner, his or her agent, a contractor, OR an engineer.
  • An original property boundary survey, signed and sealed by a Professional Land Surveyor (P.L.S.) or a Professional Surveyor and Mapper (P.S.M.)
  • legal description of the property
  • A description of the specific portion of the road to be closed
  • The folio number(s) of the property (this can be obtained by searching the County's property records at on the Property Appraiser's website

The items listed above must be submitted to WASD's Utility Liaison Office in the LeJeune Building, 3575 S. LeJeune Road (south of US-1) or can be mailed to: Miami-Dade Water and Sewer Department, 3071 SW 38th Avenue, LeJeune Bldg., Miami, FL 33146-1520, Attn: Utility Liaison Section

Please note that WASD will determine if the installation of new water and/or sewer facilities will be required in order to abandon the existing facilities and/or if a Grant of Easement will be required for the water and/or sewer facilities that will remain in the portion of the road that is to be closed. Grant of easements shall include the legal description and sketch.

Back to Top Page Last Edited: Tue Aug 30, 2011 4:16:37 PM
wasd
sect_4
Construction Information

Construction Complaint Unit
(Non-billing)
786-552-8970

Call Before You Dig
Sunshine State One Call of Florida
Call 8-1-1
www.callsunshine.com

Read the Water & Sewer Department's
Rules & Regulations

Implementing Order 10-8

 
 
 
Switch to mobile version.

© 2012 Miami-Dade County.
All rights reserved.
Miami-Dade County
 
Urchin Tracking Image
Corner
  • Facebook Twitter YouTube RSS
  • Print Print Email this page Email Page   | Bookmark and Share
  • Minimize Tools
Corner

You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.

Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.