Service Center | County Agencies | County Hall
 
space
Water & Sewer
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | Water Service | Customer Service | Construction/Development | About Us | Contact Us | miamidade.gov
    space
    space
    Water Service space
  • Pay Your Water Bill
  • View Your Current Balance
  • View Your Latest Bill
  • View Your Billing History
  • View Your Payment History
  • Change Mailing Address
  • Change Phone Number
  • Start Service
  • Disconnect Service
  • Transfer Service
  • Billing Adjustments
  • space
    Customer Service space
  • How to Read Your Water Bill
  • Rates, Fees & Charges
  • Rate Comparison
  • Hurricane Preparedness: Water
  • Reclaimed Water
  • Publications
  • Get Your Free Showerhead!
  • Lower Your Water Bill with a Submeter
  • Cross-Connection Control
  • Pebble Award Nomination
  • space
    Construction/Development space
  • E-Plans Review
  • New First-Time Connections
  • Existing Water Service
  • Submitting Documentation
  • Pre-Construction/Development
  • Construction Contracts
  • Planned Capital Projects
  • Construction or Floating Meters
  • Design/Construction Standards
  • Plumbers and Contractors
  • space
    About Us space
  • Water Use Permit (WUP)
  • News Releases
  • Calendar
  • Our Director
  • space
    space space
    Print Print Email Email Helpful? Helpful?
    space
    space
    Biscayne Bay Coastal Wetlands Rehydration Pilot

    Biscayne Bay is a shallow subtropical estuary that is an important natural and economic resource. The historic groundwater and surface water flows to Biscayne Bay have been dramatically changed by manmade alterations such as farmland drainage and the creation and operation of the Central and Southern Florida (CS&F) Project canal system.    Although the total impact of these changes is not fully understood, it is recognized that the freshwater flows necessary for a healthy estuary have been altered to the point that it is causing an ecological impact.  With the restoration of more natural freshwater flow patterns, including sufficient quantity, timing and distribution of overland water flows, it is expected that native flora and fauna, including threatened and endangered species, will benefit.  If action is not taken to restore hydrologic flows to Biscayne Bay and its coastal wetlands, the ecosystem will continue to decline.

    The Central and Southern Florida Project Comprehensive Review Study Final Integrated Feasibility Report and Programmatic Environmental Impact Statement, also known as the Restudy or Yellow Book, recognized the value of Biscayne Bay and the importance of restoring its estuarine ecosystem. The Biscayne Bay Coastal Wetlands Project (BBCW) was thus selected as one of components of the Comprehensive Everglades Restoration Plan (CERP), which was approved by Congress as part of the Water Resource Development Act (WRDA) of 2000.  The South Florida Water Management District (SFWMD) also recognized the importance of restoring Biscayne Bay and incorporated Phase 1 of the BBCW, consisting of the Deering Estate and Cutler Wetlands Flow Way components, into the SFWMD Acceler8 Program.

    The Restudy, however, determined there would not be enough water in the natural system to restore Southern Biscayne Bay and the coastal wetlands. Because of this lack of freshwater the CERP planned to provide additional water to Biscayne Bay and the coastal wetlands through the South Miami-Dade Wastewater Reuse project.  The South Miami-Dade Wastewater Reuse project proposed to provide superior quality wastewater treatment by adding additional treatment capabilities to the Miami-Dade Water and Sewer Department's (MDWASD) existing South District Wastewater Treatment Plant. Because of concern over water quality and the associated treatment technologies that would be required to attain water quality high enough to discharge into Biscayne Bay's Outstanding Florida Waters, a Wastewater Reuse Pilot Project was established as part of  CERP.  The Wastewater Reuse Pilot Project proposed researching the treatment necessary to achieve the water quality criteria needed to discharge reclaimed wastewater into natural areas, determining the level of advanced treatment necessary to achieve said level of water quality (Part 1), and constructing a pilot project to demonstrate that the appropriate level of treatment can be attained on a consistent basis (Part 2).   Although Part 1 of the Wastewater Reuse Pilot Project was completed, Part 2 of this CERP project has been placed on hold.

    Miami-Dade County proposes to further investigate the applicability of using highly treated wastewater effluent to replace the historic freshwater flows that once were discharged into the coastal wetlands of Biscayne Bay.  The Pilot Project will consist of constructing a high level wastewater treatment system that will provide additional treatment to the effluent produced by the current treatment process at the MDWASD's South District Wastewater Treatment Plant (SDWWTP). After holding two Stakeholder Workshops, MDWASD has prepared a Conceptual Plan and Basis of Design for the Biscayne Bay Coastal Wetlands Rehydration Pilot Project.  The Conceptual Plan and Basis of Design may be viewed below:

    Conceptual Plan and Basis of Design - November 2007

    Second Stakeholders' Workshop - May 18, 2007:

     

    First Stakeholders' Workshop - February 20, 2007:

    space
    If you cannot view PDF Get Acrobat! files, you can download Acrobat Reader  for free from Adobe Systems, Inc. In order to use PDF files, you must have Acrobat installed on your computer.
    space
    space
    Payment Resources

    Past Due Accounts

    Billing Adjustments

    Rate Information

    Frequently Asked Questions
     

    space
    space
    space
    space
    Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
    © 2008 Miami-Dade County. All rights reserved.
    Miami-Dade County Logo