space Procurement Management
Home | Search Solicitations | Vendors | Contracts | Other Governments | County Departments | Contact Us miamidade.gov
space
space

Solicitation Details - MCC 7360 PLAN RPQ P0141 This Solicitation is expired.

Title  :   Digester P-2 / D-3 Cover Replacement
 
Opening Date  : 5/8/2014
 
Opening Time  : 10:00 AM
 
Announcement  Info  :   SCOPE OF WORK A. Work Included: This Section describes the project in general, and provides an overview of the extent of the work to be performed under this Contract. Detailed requirements and extent of work is stated in the applicable Specification sections and shown on the Contract Plans. The Contractor shall, except as otherwise specifically stated herein or in any applicable parts of the Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, and other facilities and services necessary for proper execution, testing, and completion of the work under this Contract. 1.02 SPECIFICATIONS A. The Specifications included in these Contract Documents establish the minimum performance and quality requirements for materials and equipment together with the minimum standards for quality of workmanship and appearance. Generally, there has been no attempt to separate the Specification sections into groups for the work of separate subcontractors, or for work to be performed by the various trades. Should there be any question as to the interpretation of any particular Specification section or part of Specification section, such question should be directed to the Department prior to the submittal of a proposal for the work under this Contract. B. The work shown on the Plans is intended to be comprehensive and descriptive, not an exact and complete representation of the actual finished work. Installed work shall include fittings, joints, supports, nuts, bolts, and all other accessories required to provide complete and satisfactory systems as specified, even though some items may not be specifically shown on the Plans. C. It is the intent of the Department to obtain a complete functional, and satisfactory installation under this project, and any items of labor, equipment or materials which may be reasonably assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on any plans which may be supplied or stated herein. The Contractor shall provide all materials for the project unless they are specifically called out in these specifications as being supplied by the Department. The Contractor shall also supply all sheeting, shoring, bracing and all other labor, material or equipment required to preclude damage to, or loss of functionality of, any existing facility or system. D. No request for additional compensation or Contract time (except for a non-compensable time extension at the sole discretion of the Engineer, whose decision shall be final) resulting from encountering utilities or structures not shown, or differing in location or elevation from that shown, will be considered. The Contractor shall explore sufficiently ahead of the Work to allow time for any necessary adjustments without delay to the progress of the installation. Costs due to delays occasioned by encountering underground utilities or structures which could have or should have been discovered by timely exploration ahead of the Work shall rest solely with the Contractor. 1.03 Reasonably implied parts of the work shall be done though absent from specifications A. Any part of the work which is not mentioned in the Specifications but is shown on the Plans, or any part not shown on the Plans but described in the Specifications, or any part not shown on the Plans nor described in the Specifications, but which is necessary or normally required as a part of such work, or is necessary or required to make each installation satisfactorily and legally operable, shall be performed by the Contractor as incidental work without extra cost to the Department, as if fully described in the Specifications and shown on the Plans, and the expense thereof shall be included in the applicable unit prices or lump sum bid for the work. 1.04 DESCRIPTION OF WORK A. The project consists of furnishing all materials, labor, and equipment necessary to construct new floating cover for Digester Tank P-2/D-3. The work includes furnishing and installing steel plates, trusses, beams, spring shoes, tubes, anchors, bolts and connectors; furnishing and installing eleven (11) stainless steel roller assemblies with plates and three (3) anti-rotational guides; constructing protective coatings; gas tight welding; furnishing and installing gas connection hub; furnishing and installing gas dome and hub including compression plate and flange; furnishing and installing two pressure manhole and two access manholes; providing scaffolding; constructing tank roof top walkway; furnishing and installing vacuum breakers, vents, sampling port well assemblies; furnishing and installing a pressure/vacuum release valve with flame arrester; furnishing and installing a pressure sensor/transmitter; furnishing and installing a level sensor/transmitter; and furnishing and installing associated wiring and conduit. B. Additional work and items necessary to complete the project as shown on the project drawings and as specified herein. C. In carrying out the work, comply with all applicable basic materials and construction requirements specified in these specifications and with all notes, typical sections and details shown on the drawings, schedules, supplemental specifications, special provisions of the contract and particular requirements relating to indicated work items and construction activities. 1.05 TESTING A. Testing procedures shall be submitted to the Engineer as shop drawings and will be subject to review and approval. The Department reserves the right to require test procedure and equipment changes and revisions to the extent considered appropriate by the Engineer whose decision shall be final. The Contractor is advised that all testing shall be carried out in accordance with the best practices of the trade, best management practices (bmp) and as recommended in writing by the engineering/technical/test staff of the manufacturer of the equipment and he should plan and price his test work accordingly. In no case will test recommendations of a manufacturer’s sales or management groups be considered sufficient. All necessary temporary power sources, load banks, test materials, test instrumentation, qualified test personnel including manufacturer’s representatives, fuels and lubricants shall be provided by the Contractor and shall be as approved by the Engineer and, if not approved, the Contractor shall change the item(s) to the satisfaction of the Engineer. Where required by the Engineer, testing shall be carried out utilizing Contractor-supplied power sources. The Contractor shall include in his prices bid all costs for testing and no extra compensation will be allowed. B. Factory testing of equipment is in all cases required and test data from these tests shall be provided to the Engineer prior to shipment. At times the Department will want witnessed testing by Department personnel or representatives and at other times this will not be required. To establish a base line for pricing, the Bidder will assume that any piece of equipment with an invoice cost to the Contractor of twenty thousand dollars ($20,000.00) or more will require witnessed testing. The MDWASD will in the Specifications try in all cases to note which items will require witnessed testing. However, absent such list the Bidder shall use the $20,000 level for pricing purposes. In all cases during the cost breakdown process, the Contractor shall agree with the Engineer on the amount of a credit to the MDWASD for each item to be witness tested in the instance such test is canceled. All costs for factory testing will be included in the prices bid and no extra compensation will be allowed. In accordance with Miami-Dade County Implementing Order 3-9, Accounts Receivable Adjustments, if money is owed by the Contractor to the County, whether under this Contract or for any other purpose, the County reserves the right to retain such amount from payment due by County to the Contractor under this Contract. Such retained amount shall be applied to the amount owed by the Contractor to the County. The Contractor shall have no further claim to such retained amounts which shall be deemed full accord and satisfaction of the amount due by the County to the Contractor for the applicable payment due herein. “Pursuant to Miami-Dade County Budget Ordinance No. 13-103 this Contract is subject to a user access fee under the County’s User Access Program (UAP) in the amount of two percent (2%). All construction services provided under this contract are subject to the 2% UAP. This fee applies to all Contract usage whether by County Departments or by any other governmental, quasi-governmental or not-for-profit entity. From every payment made to the Contractor under this contract (including the payment of retainage), the County will deduct the two percent (2%) UAP fee provided in the ordinance and the Contractor will accept such reduced amount as full compensation for any and all deliverables under the contract. The County shall retain the 2% UAP for use by the County to help defray the cost of its procurement program. Contractor participation in this pay request reduction portion of the UAP is mandatory.” “Pursuant to Ordinance 13-103, if the base bid is above $500,000, the UAP will be applicable.”
 
Technical  Certification  :   GENERAL BUILDING CONTRTACTOR BUILDING CONTRACTOR STRUCTURAL
 
CodeDescription
90638 GENERAL CONSTRUCTION SERVICES
90699 MISCELLANEOUS CONSTRUCTION
 
 
Download Solicitation/Addendums/RFI/Bidders List 

space
space
space
space
Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
© 2007 Miami-Dade County. All rights reserved.
Miami-Dade County Logo