space Procurement Management
Home | Search Solicitations | Vendors | Contracts | Other Governments | County Departments | Contact Us miamidade.gov
space
space

Solicitation Details - MCC 7360 PLAN RPQ WAP-041 B This Solicitation is expired.

Title  :   Weatherization Assistance Program WAP
 
Opening Date  : 7/23/2019
 
Opening Time  : 02:00 PM
 
Announcement  Info  :   Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) A. GENERAL CONDITIONS Contractor is responsible for verifying all existing dimensions, quantities and job site conditions prior to submitting his/her bid. Contractor shall not place any debris or equipment on adjacent properties. Contractor must clean all areas affected by work under this Contract. All left over debris must be removed and disposed of by legal means. Property must be left in broom clean condition. All related construction items removed or replaced shall become the property of contractor unless prior agreement with Owner has been reached in writing and approved by County. Contractor shall be responsible for any damage done to Owner’s home, furnishings and personal property as a result of the work performed by Contractor under these Bid Specifications. The Contractor is responsible for scheduling and coordinating all subcontractor work. The Contractor shall provide all necessary materials, equipment and personnel who have the appropriate qualifications and experience to undertake the scope of work specifications. It is the Owner’s responsibility to remove and replace all personal property to facilitate the performance of the work. This includes, but is not limited to, furniture, rugs, curtains, and alarm systems. Contractor shall repair/relocate any phone wires that are affected by this work; Owner is responsible for all TV cables or satellite wiring. The work shall be complete in the time limit(s) specified and in accordance with the work specifications and plans. If there are any conflicts between the Owner and the Contractor, the requirements citied in the Work Specifications shall prevail. Exception: Contractor and Owner must receive written approval from the Homeowner Association or Condo Association for all work items. B. CHANGE ORDERS No changes will be permitted to the Contract Agreement unless in an emergency nature, code violations, a requirement by the Building Department or other instances as deemed necessary and executed by the Contractor and County prior to the start of the Change Order work. In the event a change order is required, the Contractor shall provide picture images of the work to be performed prior to the commencement of the change order work. • Change orders must be authorized by the Program in advance. Authorization can be initiated verbally (e.g. over the phone) but must ultimately be in writing and signed off by Contractor and Program staff. Only approved written change orders will be acknowledged upon invoicing. • Change orders must be comprised of measures on the unit price list, and will be paid at the same rates as the Contractor’s unit prices. C. CODES, ORDINANCES AND PERMITS All work to be performed in the Contract Agreement, including plans and bid specifications shall comply with all current building codes, ordinances, and permitting requirements from the County and/or applicable City. This includes the current Florida Building Code (F.B.C.) with the latest revisions. It is the Contractor’s responsibility to identify and pull all required permits. The installation of all materials and products shall be done in accordance with the manufacturer’s specifications and in accordance with the latest revised addition of the Florida Building Code, ordinances, permitting requirements, and Weatherization guidelines Contractors must inform the Project Manager if he/she is experiencing undue delays in the permitting process. D. BUILDING DEPARTMENT INSPECTIONS Building Department Inspections shall be as per Florida Building Code and Miami Dade County Building Code Work that has been concealed without a Compliance Inspection may result in payment delays or denial. Contractor shall be responsible for requesting all mandatory inspections as per Florida Building Code and Miami Dade County Building Code. E. WORKMANSHIP & MATERIAL STANDARDS The Contractor must perform work specified in the Work Specifications section in a high quality good workmanlike manner using specified materials or approved equals. Materials must 1) be high quality, 2) installed in accordance with manufacturer’s specs and 3) meet requirements of building inspectors. All “equals” must be submitted and approved by the Program Manager. Final decision on workmanship will be determined by the Project Manager and/or Inspector. F. WORK SCHEDULE Contractor shall schedule and coordinate work with the Owner between the hours of 7:00 am and 6:00 pm, Monday through Friday. Requests to work before or after these hours and on weekends must be approved by the Owner. The Owner shall provide the water and electric services necessary to accomplish this work. Work requiring a program inspection by a Project Manager can only be performed during normal business hours, Monday through Friday. The Contractor is responsible for scheduling and coordinating subcontractor work. The Contractor acknowledges that the Project Manager and Inspector shall perform pre and post inspections of all work performed. The Contractor must call and schedule a post inspection (Final Walk-Through) with the Project Manager. A ladder must be provided by the Contractor for the Inspector at the Final Walk-Through. Final and full payment for all work completed pursuant to the work specifications (as amended/modified, if applicable) shall be done upon completion of all inspections required by the program and the work has been deemed satisfactory. G. GENERAL WARRANTY Materials installed and work performed shall have a one-year Contractor warranty from the date of final acceptance of the work by the Owner and Project Manager. Roof warranties must be valid for a period of no less than five years from final completion date of all work required under this contract H. GENERAL CLEAN-UP Contractor is to provide clear and safe passageways in and around the structure during the project. Contractor to remove all debris and materials from in and around structure being repaired at the end of each work day. All shall be stored on site in a code approved storage container or dumpster and be legally dumped at a code approved dump or recycling center regularly and at the end of the project. In progress and final clean-up to include-but is not limited to-damp wiping, sweeping, mopping and vacuuming. I. PRIVATE AGREEMENTS It is understood that only the work contained in these permitted specifications shall be done. There shall be no private agreements of any kind between the Owner and Contractor other then as referenced in the County’s Invitation for bid. Scope of Work # 124 Pages 1 - 3 Folio # 18-3101-031-0390 Work Site Address: 8627 NE 1 Avenue Install Smoke Detectors: Furnish and Install, battery operated smoke detectors in all sleeping rooms and in hallways. 10 year manufacturer warranty provided lithium battery along with a tamper proof cover is required. Materials_____________ Locations 3 Labor________________ Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location 1 Labor _________________ Repair Window to Close Properly Provide all necessary materials and labor to install replacement balances, seals, locks, hardware or lubricant to have all designated windows restored and repaired to function as originally intended. Adjacent exterior and interior surfaces shall be restored to original condition. Material _____________ Location Bedroom 1 Labor _______________ Type Single Hung Install or add insulation Furnish and install, blown type Fiberglass attic insulation. Attic must have; minimum R-value of R-30, staple R-30 fiberglass batt type insulation. To attic access hatch generate 1/2"plywood x 12"ht hatch blocking and apply foam and tape to seal between hatch and opening frame, must install blocking around opening to equal finish height of insulation (12"). • Provide insulation installer's card that is visible from opening with the following information; name of company installing, name of installer, date, insulation type, lot or batch #, R-Value, number of bags, sq. ft. of coverage, and thickness in inches. • Contractor is responsible to obtain an R-30 thickness regardless of the bags estimated. Materials _________________ Quantity 14 Bags Labor ____________________ Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location Hallway Labor ____________________ Install Solar Screen Furnish and Install Solar Screens with a minimum of .80 solar coefficient and approximately 20% charcoal to the following Glass Locations: Materials __________________ Square feet 190 SQF Labor _____________________ Location: See plans as specified by “tint” marking Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Location Type: Regular Replace Refrigerator Furnish and install New Energy STAR Refrigerator with proper measurements to fit in the current location. Old Equipment must be hauled away and de-manufactured through removal off the grid and completion/receipt of the de-manufacturing certificate as signed by the owner of the residence and the vendor. Include the ice line and connection there of (a separate line item for disposal fees MUST BE included on the invoice) Materials _________________ Square feet 21 CF Labor ____________________ Color Black Disposal Fee ______________ Type: Top Freezer With Ice Maker REMOVE WALL AC AND SEAL WALL REMOVE WALL A/C AND SEAL WALL. Materials________________ Location South Wall Labor___________________ Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: Garage Labor ___________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 121 Folio # 01-3114-043-2200 Work Site Address 1238 NW 57 ST Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location Hallway Labor _________________ Quantity 1 Install Shower Heads Furnish and install, Shower-Head made of ABS thermoplastic with Chrome-plated finish, self-cleaning and maintenance free, non-removable flow compensator. Maximum flow rate of 2.5 GPM (gallons per minute) • Shower-head will be tested to determine if equipment is tightened adequately to prevent leakage at the point of connection Materials ______________ Quantity 1 Labor _________________ Type Hand Held Install or add insulation Furnish and install, blown type Fiberglass attic insulation. Attic must have; minimum R-value of R-30, staple R-30 fiberglass batt type insulation. To attic access hatch generate 1/2"plywood x 12"ht hatch blocking and apply foam and tape to seal between hatch and opening frame, must install blocking around opening to equal finish height of insulation (12"). • Provide insulation installer's card that is visible from opening with the following information; name of company installing, name of installer, date, insulation type, lot or batch #, R-Value, number of bags, sq. ft. of coverage, and thickness in inches. • Contractor is responsible to obtain an R-30 thickness regardless of the bags estimated. Materials _________________ Quantity 14 Bags Labor ____________________ Type Fiberglass Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location Hallway Labor ____________________ Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Locations Type: Regular Replace Refrigerator Furnish and install New Energy STAR Refrigerator with proper measurements to fit in the current location. Old Equipment must be hauled away and de-manufactured through removal off the grid and completion/receipt of the de-manufacturing certificate as signed by the owner of the residence and the vendor. Include the ice line and connection there of (a separate line item for disposal fees MUST BE included on the invoice) Materials _________________ Square feet 21 CF Labor ____________________ Color White Disposal Fee ______________ Type: Top Freezer with Ice Maker Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: Utility Room Labor ___________________ INSTALL WATER HEATER WRAP Furnish and Install Insulation blanket with a minimum R-6 value. Seal with tape with a maximum flame spread rating of 25. (Duct tape is not allowed). Secure blankets with straps at a maximum of 1" from the top and 1" from the bottom of the Water heater. Carefully cut out for any Access panels and PT valves. Maintain insulation wrap with proper clearance from vent flute, thermostat, valves, access or intake areas. Must be installed as per Florida WAP materials, installation and workmanship standards. Materials_______________ Location Utility Room Type Tall Labor _________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 126 Folio # 30-3116-009-6040 Work Site Address 2768 NW 55 ST Replace Exterior Metal Door: • Furnish and install 1-3/4" pre-hung insulated 6 panel steel entry door (Stanley or equivalent) • Unit to include jamb, keyed entry lock, single cylinder dead bolt, metal threshold, weather strip, door stopper or safety chain, peep hole and hinges. • Unit approved by MDC Product Control Division to resist hurricane forces, per the FBC and Miami-Dade Building Code. Stanley or equivalent quality to fit opening. Materials __________ Size 36X80 White Panel O/S L/H Labor ____________ TYPE: Front Door - Metal Permit Fees _______ Install Smoke Detectors: Furnish and Install, battery operated smoke detectors in all sleeping rooms and in hallways. 10 year manufacturer warranty provided lithium battery along with a tamper proof cover is required. Materials_____________ Locations Bedroom Labor________________ Quantity 3 Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location Hallway Labor _________________ Quantity 1 Install Shower Heads Furnish and install, Shower-Head made of ABS thermoplastic with Chrome-plated finish, self-cleaning and maintenance free, non-removable flow compensator. Maximum flow rate of 2.5 GPM (gallons per minute) • Shower-head will be tested to determine if equipment is tightened adequately to prevent leakage at the point of connection Materials ______________ Quantity 1 Hand Held Labor _________________ Install Weather Strip Furnish and install, Rigid and or Kerf type (Hollow gasket attached to an extruded aluminum carrier) weather strip designed for installation on door stop. Must be adjustable and attached with screws spaced a maximum 9" apart. Install on header, and sides of door jamb. Door threshold may not be bumper type or be higher than 3/4" inches in height. Materials ________________ Location Rear Door Labor ___________________ Repair Window to Close Properly Provide all necessary materials and labor to install replacement balances, seals, locks, hardware or lubricant to have all designated windows restored and repaired to function as originally intended. Adjacent exterior and interior surfaces shall be restored to original condition. Material _____________ Location All Location (11) Labor _______________ Type Single Hung Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location Closet Labor ____________________ Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Location Type: Regular Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: Outside Labor ___________________ REPAIR DOOR Furnish and install necessary labor and material to door in order to work properly. Work may include hardware removal and replacement, hinges, door sanding, weather-stripping etc. Materials _______________ Location Rear Door Labor __________________ INSTALL WATER HEATER WRAP Furnish and Install Insulation blanket with a minimum R-6 value. Seal with tape with a maximum flame spread rating of 25. (Duct tape is not allowed). Secure blankets with straps at a maximum of 1" from the top and 1" from the bottom of the Water heater. Carefully cut out for any Access panels and PT valves. Maintain insulation wrap with proper clearance from vent flute, thermostat, valves, access or intake areas. Must be installed as per Florida WAP materials, installation and workmanship standards. Materials_______________ Location Outside Labor _________________ REPLACEMENT OF WINDOW MOUNT A/C UNIT NOTE: A/C Unit installation is contingent on results emerging from a required electrical load test. Upon written approval from the WAP Program Manager, installation and work may commence. Remove the existing A/C unit and haul away for proper disposal. A de-manufacturing certificate must be provided upon disposal of old existing unit. Furnish and provide all necessary materials and labor for installation of a new window mounted A/C unit. Adjacent exterior and interior surfaces shall be restored to original condition. • Replace existing window glass with ¼” Plexiglas as required to properly seal and prevent air infiltration Materials__________________ Size 6,000 BTU Heat and Cool Labor_____________________ Location BedR # 1 & BedR # 2 REPLACEMENT OF WINDOW MOUNT A/C UNIT NOTE: A/C Unit installation is contingent on results emerging from a required electrical load test. Upon written approval from the WAP Program Manager, installation and work may commence. Remove the existing A/C unit and haul away for proper disposal. A de-manufacturing certificate must be provided upon disposal of old existing unit. Furnish and provide all necessary materials and labor for installation of a new window mounted A/C unit. Adjacent exterior and interior surfaces shall be restored to original condition. • Replace existing window glass with ¼” Plexiglas as required to properly seal and prevent air infiltration Materials__________________ Size 9,000 BTU Heat and Cool Labor_____________________ Location Living Room CONSTRUCT EXTERIOR WATER HEATER HOUSING Furnish and install material and labor to install a plywood shelter to house the exterior water heater. Plywood needs to be extrior grade and painted with elastromeric type paint for water protection. (See Attached sample Photo) Materials_____________ Quantity 1 Labor________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 127 Folio # 30-3103-019-0550 Work Site Address 9941 NW 21 Ave Install Smoke Detectors: Furnish and Install, battery operated smoke detectors in all sleeping rooms and in hallways. 10 year manufacturer warranty provided lithium battery along with a tamper proof cover is required. Materials_____________ Locations All Bedrooms Labor________________ Quantity 3 Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location Hallway Labor _________________ Quantity 2 Install or add insulation Furnish and install, blown type Fiberglass attic insulation. Attic must have; minimum R-value of R-30, staple R-30 fiberglass batt type insulation. To attic access hatch generate 1/2"plywood x 12"ht hatch blocking and apply foam and tape to seal between hatch and opening frame, must install blocking around opening to equal finish height of insulation (12"). • Provide insulation installer's card that is visible from opening with the following information; name of company installing, name of installer, date, insulation type, lot or batch #, R-Value, number of bags, sq. ft. of coverage, and thickness in inches. • Contractor is responsible to obtain an R-30 thickness regardless of the bags estimated. Materials _________________ Quantity 22 BAGS Labor ____________________ Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location Closet Labor ____________________ Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Location Type: Regular Repair Drywall at Ceiling Provide all material and labor necessary to close up, and patch hole to match adjacent surface area. Repair areas may be, but are not limited to, 1/2", 5/8", GWB, MRGWB, and or Duro Rock. Materials _____________ Location All Locations Around Lights Labor ________________ Quantity 10 SQF Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: Garage Labor ___________________ REPAIR DOOR Furnish and install necessary labor and material to door in order to work properly. Work may include hardware removal and replacement, hinges, door sanding, weather-stripping etc. Materials _______________ Location Front Door Labor __________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 125 Folio # 30-3102-010-0140 Work Site Address 1447 NW 100 ST Remove and Replace Exterior Metal Door: • Furnish and install 1-3/4" pre-hung insulated 6 panel steel entry door (Stanley or equivalent) • Unit to include jamb, keyed entry lock, single cylinder dead bolt, metal threshold, weather strip, door stopper or safety chain, peep hole and hinges. • Unit approved by MDC Product Control Division to resist hurricane forces, per the FBC and Miami-Dade Building Code. Stanley or equivalent quality to fit opening. Materials __________ Size 36x80 White Panel O/S L/H Labor ____________ Location Front Door Permit Fees _______ Remove and Replace Exterior Metal Door: • Furnish and install 1-3/4" pre-hung insulated 6 panel steel entry door (Stanley or equivalent) • Unit to include jamb, keyed entry lock, single cylinder dead bolt, metal threshold, weather strip, door stopper or safety chain, peep hole and hinges. • Unit approved by MDC Product Control Division to resist hurricane forces, per the FBC and Miami-Dade Building Code. Stanley or equivalent quality to fit opening. Materials __________ Size 32x80 White Pane O/S R/H Labor ____________ Location Rear Door Permit Fees _______ Install Smoke Detectors: Furnish and Install, battery operated smoke detectors in all sleeping rooms and in hallways. 10 year manufacturer warranty provided lithium battery along with a tamper proof cover is required. Materials_____________ Locations All Bedrooms Labor________________ Quantity 3 Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location Hallway Labor _________________ Quantity 1 Install Shower Heads Furnish and install, Shower-Head made of ABS thermoplastic with Chrome-plated finish, self-cleaning and maintenance free, non-removable flow compensator. Maximum flow rate of 2.5 GPM (gallons per minute) • Shower-head will be tested to determine if equipment is tightened adequately to prevent leakage at the point of connection Materials ______________ Quantity 1 Hand Held Labor _________________ Install Plexiglas at window • Replace and Install Plexiglas (3/8 of an inch width) on all designated windows. Materials ______________ Location South Wall (1) Labor _________________ Repair Window to Close Properly Provide all necessary materials and labor to install replacement balances, seals, locks, hardware or lubricant to have all designated windows restored and repaired to function as originally intended. Adjacent exterior and interior surfaces shall be restored to original condition. Material _____________ Location All Locations (13) Labor _______________ Type Single Hung Install or add insulation Furnish and install, blown type Fiberglass attic insulation. Attic must have; minimum R-value of R-30, staple R-30 fiberglass batt type insulation. To attic access hatch generate 1/2"plywood x 12"ht hatch blocking and apply foam and tape to seal between hatch and opening frame, must install blocking around opening to equal finish height of insulation (12"). • Provide insulation installer's card that is visible from opening with the following information; name of company installing, name of installer, date, insulation type, lot or batch #, R-Value, number of bags, sq. ft. of coverage, and thickness in inches. • Contractor is responsible to obtain an R-30 thickness regardless of the bags estimated. Materials _________________ Quantity 5 Bags Labor ____________________ Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location Hallway Labor ____________________ Install Solar Screen Furnish and Install Solar Screens with a minimum of .80 solar coefficient and approximately 20% charcoal to the following Glass Locations: Materials __________________ Square feet 130 SQF Labor _____________________ Location: See plans as specified by “tint” marking Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Location Type: Regular Replace Refrigerator Furnish and install New Energy STAR Refrigerator with proper measurements to fit in the current location. Old Equipment must be hauled away and de-manufactured through removal off the grid and completion/receipt of the de-manufacturing certificate as signed by the owner of the residence and the vendor. Include the ice line and connection there of (a separate line item for disposal fees MUST BE included on the invoice) Materials _________________ Square feet 21 CF Labor ____________________ Color Black Disposal Fee ______________ Type: Top Freezer With Ice Maker Repair Drywall at wall Provide all material and labor necessary to close up, and patch hole to match adjacent surface area. Repair areas may be, but are not limited to, 1/2", 5/8", GWB, MRGWB, and or Duro Rock. Materials _____________ Location Utility Room Labor ________________ Quantity 8 SQF Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: Utility Labor ___________________ REMOVE WALL AC AND SEAL WALL REMOVE WALL AC AND SEAL WALL Materials__________________ Location West Wall Labor_____________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 118 Folio # 30-4904-002-0060 Work Site Address 15073 SW 8 ST Replace Water Heater: • Furnish and install water heating unit, include; shut off valve and electrical disconnect as per code. • Electrical connection must be up-graded to manufactures recommendation and Florida Building Code and or any applicable Miami-Dade County Building Codes. • Contractor must use # 6 cable Materials ___________ Size 40 GAL Labor ______________ Type: TALL Permit Fees __________ Disposal Fee ________ Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location 1 Labor _________________ Install Shower Heads Furnish and install, Shower-Head made of ABS thermoplastic with Chrome-plated finish, self-cleaning and maintenance free, non-removable flow compensator. Maximum flow rate of 2.5 GPM (gallons per minute) • Shower-head will be tested to determine if equipment is tightened adequately to prevent leakage at the point of connection Materials ______________ Quantity 1 Regular Labor _________________ Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location Hallway Labor ____________________ Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Location Type: Regular Repair Sliding Glass Door Furnish and provide all necessary labor and material to repair and restore door to function as originally intended. Work may include hardware removal and replacement of Tracks, Wheels and Handles. Materials ______________ Location See Plans Labor _________________ Type SGD REPAIR ATTIC HATCH Furnish and Install new Attic Hatch or Repair existing Materials______________ Location Hallway Labor_________________ Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: _____________ Labor ___________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 123 Folio # 30-6901-008-0570 Work Site Address 19843 NW 118 Ave Replace Water Heater: • Furnish and install water heating unit, include; shut off valve and electrical disconnect as per code. • Electrical connection must be up-graded to manufactures recommendation and Florida Building Code and or any applicable Miami-Dade County Building Codes. • Contractor must use # 6 cable Materials ___________ Size 40 GAL Labor ______________ Type: TALL Permit Fees __________ Disposal Fee ________ Install Smoke Detectors: Furnish and Install, battery operated smoke detectors in all sleeping rooms and in hallways. 10 year manufacturer warranty provided lithium battery along with a tamper proof cover is required. Materials_____________ Locations ALL BEDROOMS Labor________________ Quantity 4 Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location HALLWAY Labor _________________ Quantity 2 Repair Window to Close Properly Provide all necessary materials and labor to install replacement balances, seals, locks, hardware or lubricant to have all designated windows restored and repaired to function as originally intended. Adjacent exterior and interior surfaces shall be restored to original condition. Material _____________ Location ALL LOCATIONS Labor _______________ Type SH 15 Install Batt, Blocking & Foam Tape Install Batt and Foam Tape according to Weatherization Program Guidelines to include Blocking around perimeter of hatch as necessary based on attic pitch and size. Materials _________________ Location HALLWAY Labor ____________________ Install Solar Screen Furnish and Install Solar Screens with a minimum of .80 solar coefficient and approximately 20% charcoal to the following Glass Locations: Materials __________________ Square feet 115 SQF Labor _____________________ Location: See plans as specified by “tint” marking Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location AL LOCATION Type: REGULAR Replace Refrigerator Furnish and install New Energy STAR Refrigerator with proper measurements to fit in the current location. Old Equipment must be hauled away and de-manufactured through removal off the grid and completion/receipt of the de-manufacturing certificate as signed by the owner of the residence and the vendor. Include the ice line and connection there of (a separate line item for disposal fees MUST BE included on the invoice) Materials _________________ Square feet 21 CF Labor ____________________ Color WHITE Disposal Fee ______________ Type: TOP FREEZER WITH ICE MAKER Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: 4 LINEAR FEET Labor ___________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ Work Order # 122 Folio # 30-6007-003-0040 Work Site Address 11488 SW 214 ST Remove and Replace Exterior Metal Door: • Furnish and install 1-3/4" pre-hung insulated 6 panel steel entry door (Stanley or equivalent) • Unit to include jamb, keyed entry lock, single cylinder dead bolt, metal threshold, weather strip, door stopper or safety chain, peep hole and hinges. • Unit approved by MDC Product Control Division to resist hurricane forces, per the FBC and Miami-Dade Building Code. Stanley or equivalent quality to fit opening. Materials __________ Size 36X80White Panel O/S R/H Labor ____________ Location Front Door Permit Fees _______ Remove and Replace Exterior Metal Door: • Furnish and install 1-3/4" pre-hung insulated 6 panel steel entry door (Stanley or equivalent) • Unit to include jamb, keyed entry lock, single cylinder dead bolt, metal threshold, weather strip, door stopper or safety chain, peep hole and hinges. • Unit approved by MDC Product Control Division to resist hurricane forces, per the FBC and Miami-Dade Building Code. Stanley or equivalent quality to fit opening. Materials __________ Size 30X80 White Panel O/S L/H Labor ____________ Location Rear Door Permit Fees _______ Repair Window to Close Properly Provide all necessary materials and labor to install replacement balances, seals, locks, hardware or lubricant to have all designated windows restored and repaired to function as originally intended. Adjacent exterior and interior surfaces shall be restored to original condition. Material _____________ Location Bedroom1 & Bath 1 Labor _______________ Type ________________ Replace Water Heater: • Furnish and install water heating unit, include; shut off valve and electrical disconnect as per code. • Electrical connection must be up-graded to manufactures recommendation and Florida Building Code and or any applicable Miami-Dade County Building Codes. • Contractor must use # 6 cable Materials ___________ Size 30 GAL Labor ______________ Type: Tall Permit Fees __________ Disposal Fee ________ Install Smoke Detectors: Furnish and Install, battery operated smoke detectors in all sleeping rooms and in hallways. 10 year manufacturer warranty provided lithium battery along with a tamper proof cover is required. Materials_____________ Locations Bedrooms Labor________________ Quantity 2 Install CO Detector: Furnish and Install one (1) Carbon Monoxide Detector with 10 year manufacturer lithium battery along with a tamper proof covering near gas appliances. Installed location must not interfere or obstruct with any cabinet or drawer functions. Materials_______________ Location Hallway Labor _________________ Quantity 1 Install Shower Heads Furnish and install, Shower-Head made of ABS thermoplastic with Chrome-plated finish, self-cleaning and maintenance free, non-removable flow compensator. Maximum flow rate of 2.5 GPM (gallons per minute) • Shower-head will be tested to determine if equipment is tightened adequately to prevent leakage at the point of connection Materials ______________ Quantity 2 Labor _________________ Type Hand Held Provide CFLs Bulbs Furnish and install, Compact fluorescent light bulbs to replace existing incandescent light bulbs in fixtures that receive 2 or more hours of use each day as marked in the attached plans. Note: new CFL's must be installed prior to inspection to be counted as complete. Materials _________________ Quantity 12 Labor ____________________ Location All Location Type: Regular Replace Refrigerator Furnish and install New Energy STAR Refrigerator with proper measurements to fit in the current location. Old Equipment must be hauled away and de-manufactured through removal off the grid and completion/receipt of the de-manufacturing certificate as signed by the owner of the residence and the vendor. Include the ice line and connection there of (a separate line item for disposal fees MUST BE included on the invoice) Materials _________________ Square feet 21 CF Labor ____________________ Color White Disposal Fee ______________ Type: Top Freezer Install W/H Pipe Insulation Insulate exposed hot and cold water pipes from water heater only. Insulate cold water pipes within specified (4) linear feet of heater and all accessible hot water pipes. Do not cover the following items; T & P valve, valve handles, control and safety devises, T & P drain line, and any leaking pipes. Use standard pre-formed type to fit standard pipe diameters, must be a minimum of 3/4" thick and have an R-Value of R-3.5 or more. Cover all elbows and cured pipes without compression or gaps. All seams must face down on horizontal pipes and be taped or glued shut. Materials ________________ Locations: Utility Room Labor ___________________ Subtotal Materials: _____________ Subtotal Labor: ________________ Subtotal Permit Fees:___________ TOTAL PROJECT COST: ________ COMMENTS: In accordance with Miami-Dade County Implementing Order 3-9, Accounts Receivable Adjustments, if money is owed by the Contractor to the County, whether under this Contract or for any other purpose, the County reserves the right to retain such amount from payment due by County to the Contractor under this Contract. Such retained amount shall be applied to the amount owed by the Contractor to the County. The Contractor shall have no further claim to such retained amounts which shall be deemed full accord and satisfaction of the amount due by the County to the Contractor for the applicable payment due herein.
 
Technical  Certification  :   GENERAL BUILDING CONTRACTOR
 
CodeDescription
90638 GENERAL CONSTRUCTION SERVICES
90699 MISCELLANEOUS CONSTRUCTION
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
 
 
Download Solicitation/Addendums/RFI/Bidders List 

space
space
space
space
Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
© 2007 Miami-Dade County. All rights reserved.
Miami-Dade County Logo