space Procurement Management
Home | Search Solicitations | Vendors | Contracts | Other Governments | County Departments | Contact Us miamidade.gov
space
space

Solicitation Details - W30025 This Solicitation is expired.

Title  :   Miami-Dade County Courthouse Facade Restoration Project
 
Opening Date  : 5/15/2013
 
Opening Time  : 02:00 PM
 
Announcement  Info  :   The scope of work for this project includes repairs to the exterior terra cotta facade, repairs to the existing exterior windows, repairs to the plaza, removal/replacement of the exterior light fixtures presently attached to the terra cotta panels, and removal and replacement of the existing flat roof. Terra Cotta Facade Restoration Scope of Work: In particular, repairs to the terra cotta facade include but are not limited to, providing access to the entire building facade, installing proper protection; removal and resetting of displaced terra cotta units; stabilization of cracked terra cotta units by pinning; replacement of selected distressed terra cotta units with new terra cotta units; replacement of missing original terra cotta ornamentation with replica terra cotta units; installation of through-wall flashing at selected repair areas; cleaning, coating, and supplementing of existing vertical and lateral support steel; replacement of severely corroded steel shelf angles and components; repointing of selected mortar joints; repairs to terra cotta glaze at selected locations; installation of horizontal and vertical expansion/relief joints at selected locations; and cleaning of the facade with a mild cleaning system. Windows Restoration Scope of Work: Work related to the existing fixed windows includes, but is not limited to, removal of existing sealant, installation of new wet sealant and new anodized aluminum trim, resetting of select window sashes, and installation of selected faux strip separating two glass panels with a sash. Repairs to operable windows located on the seventh to 22nd floors include but are not limited to: removal of existing sealant, installation of new wet sealant, resetting of select window sashes, and installation of selected faux muntins. These windows are intended to remain operable. Repairs to operable windows located on the 23rd through 25th floors, include, but are not limited to, resetting of all sashes, removal of existing sealant and fasteners penetrating window sashes, removal of interior plaster perimeter on the 24th and 25th floors, installation of new wet sealant and silicone extrusions, installation of new interior perimeter grout and supplemental window anchors on the 24th and 25th floors, and installation of interior tamper-resistant screws to render the windows (except for two access windows on the 24th floor) inoperable. Plaza Restoration Scope of Work: The plaza work includes, but is not limited to, removal, resetting, and replacement (where necessary) of slate pavers, granite and waterproofing below the stairs; repairs to plaza concrete, concrete framing, and bridges over the service entrances; and repairs to the three existing planters. Roof Replacement Scope of Work: Repairs to the existing flat roof system on the fourth, seventh, 20th and 24th floors include, but are not limited to, removal and disposal of existing roofing, concrete slab repairs where necessary and installation of new roof system including a vapor retarder, tapered insulation and modified bituminous roofing system. This work also includes new roof drains, overflow scuppers and all new metal flashing. Lighting Replacement / Relocation Scope of Work: Lighting-related work includes, but is not limited to, removal and disposal of existing metal halide and florescent exterior building lighting system and accessories on the fourth, seventh, twentieth and twenty fourth floors; installation of a new light-emitting diode (LED) lighting system; fabrication and installation of new supports for the lighting system; and installation of electrical conduits, wires, junction boxes and electrical accessories as required to connect into the existing building electrical system.
 
Technical  Certification  :   Miami-Dade County Contractor's Certification is required in one of the following categories: General Building, General Engineering, or other category as applicable to Chapter 10 of the Miami-Dade County Code, or a State of Florida General Contractor's License.
 
CodeDescription
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
 
 
Download Solicitation/Addendums/RFI/Bidders List 

space
space
space
space
Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
© 2007 Miami-Dade County. All rights reserved.
Miami-Dade County Logo