image Miami-Dade County Seal

Miami-Dade
Legislative
Item

File Number: 261811

File Number:261811
File Type:Discussion Item
Status:Add-on
Version:0
Reference:
Control:Intergovernmental and Economic Impact Committee
File Name:DISCUSSION ITEM REGARDING DTPW OVERTIME REDUCTION PLAN
Introduced:10/14/2026
Requester:None
Cost:
Final Action:
Agenda Date:
Agenda Item Number:
Notes:
Title:
DISCUSSION ITEM REGARDING DTPW OVERTIME REDUCTION PLAN
Indexes:
NONE
Sponsors:
Roberto J. Gonzalez, Prime Sponsor
Sunset Provision:No
Effective Date:
Expiration Date:
Registered Lobbyist:
None Listed
LEGISLATIVE HISTORY
Acting Body
Date
Agenda Item
Action
Sent To
Due Date
Returned
Pass/Fail
Intergovernmental and Economic Impact Committee
10/15/2026
1F1
Presented
REPORT:
Ms. Miller appeared before the Committee and gave a PowerPoint presentation on DTPW's overtime management and reduction strategy, as well as an overview of the department and its goals. She explained that overtime at DTPW was predominantly driven by transit operations, although public works also incurred overtime for work such as overnight road crews, Metromover upgrades, cleaning, painting, and platform work that had to be performed after hours to minimize service disruption. She noted that overtime was built into the budget planning of every major transportation and transit system because certain work had to be performed during off-peak hours, plus overtime covered absences and vacancies without overstaffing shifts. She continued that collective bargaining agreements built overtime into how runs were scheduled, and costs rose annually with cost-of-living adjustments and negotiated raises. She advised that the County Mayor had previously directed DTPW to develop an overtime reduction plan and the presentation reflected that plan in action. Ms. Miller described the four types of overtime managed by DTPW: • Emergency overtime, which was unplanned and critical- or safety-related, such as overnight roadway drainage work after heavy rain; • Unplanned overtime, which stemmed from unforeseeable absenteeism or operating conditions that extended shifts; • Discretionary overtime, which was approved by management for unforeseen events; and • Scheduled overtime, which was built in before scheduled work shifts began through run cuts, picks, lineups, and contracted work rules. Ms. Miller reported that DTPW spent $71 million on overtime in Fiscal Year (FY) 2026, of which 95 percent of that overtime was transit-driven, with bus operations accounting for approximately 47 percent, and that 97 percent of overtime costs were related to operations. She stated that overtime spending had remained largely consistent year over year, tracking cost of living increases under the labor agreements, and that the FY 2027 budgeted amount had been tailored to reflect actual usage in the two most recent years. Ms. Miller stated that DTPW previously had no department-wide overtime policy and was now formalizing its system with clear rules, access to information, and clear accountability of the process. She outlined the components of the plan: • Staffing: Continuous open recruitment for critical classifications such as bus operators, train operators, and rail technicians, with a target of keeping critical vacancies below five (5) percent; • Formal Policy: A transportation administrative policy requiring written pre-approval of overtime, except in emergencies, with every hour reason-coded, logged, and reviewed; • Safety: Strict safety limits of no more than 16 consecutive hours, 12-hour shifts for rail and bus classifications, and no more than 70 hours in any seven-day period; • Standards: A standard operating procedure and template applied uniformly across all divisions; and • Dashboard: A Power BI dashboard that provided managers with real-time data and alerted them when an employee reached 60 hours, approaching the 70-hour limit. Ms. Miller described the purchase of the HASTUS crew-scheduling software as one of the department’s most significant tools for addressing scheduled overtime. She explained that it would automate crew scheduling and daily dispatches, produce better run cuts and rostering with less open work, comply with labor rules, and right-size the board of standby operators to prevent too many operators waiting to cover absences or open runs. Ms. Miller advised that full implementation was targeted for the fourth quarter of FY 2027, following a labor relations review before launch, with a first-year goal of at least a five-percent reduction in schedule-driven overtime. Ms. Miller further described longer-term strategies, including pursuing scheduling flexibility and overtime equalization language in future collective bargaining agreements with the Transport Workers Union (TWU) and Government Supervisors Association of Florida (GSAF). She also described a three-year hiring plan targeting hiring within 90 days or less and 85 percent retention within 12 months of hire, flexible scheduling options such as part-time and contracted staffing to cover peak periods without premium pay, and expanded cross-training and career pathways to deepen the pool of qualified staff. Ms. Miller concluded that DTPW had moved from having an inconsistent, department-wide overtime management system to having a formal policy with a standardized process across all divisions, real-time data access, and a clear accountability path. Also, the next 12 months would bring tangible progress toward managing overtime in a transparent, data-driven, and efficient manner while protecting service quality, employee safety, and collective bargaining agreements. Commissioner Gonzalez asked whether the one-year goal of a five-percent reduction was a conservative or a best-case scenario. Ms. Miller responded that it was a conservative goal and that the department's intention was to achieve more, but she wanted to avoid overpromising results with a new software system. In response to Commissioner Gonzalez's request to quantify the anticipated five-percent reduction, Ms. Miller explained that the schedule-driven portion of overtime was approximately $35.5 million. She continued that a five-percent reduction would equal approximately $1.7 million, and that the savings would be realized in FY 2028 because the program would not be fully implemented until the fourth quarter of FY 2027, although DTPW already started using the program. and usage was tied to the department's three (3) annual lineups. She confirmed there were no planned savings in the current fiscal year, as the department was still learning the new software, but that DTPW was aiming to reduce discretionary and unplanned overtime through its new processes. Ms. Miller added that scheduled overtime remained more difficult to reduce until the new program was completely enacted. Commissioner Cohen Higgins asked whether the presentation had been prepared in response to a directive from the Board. Ms. Miller replied that DTPW had been asked to give the presentation but that the overtime reduction plan was already planned for about 18 months, and that the scheduling software was only one (1) component of a broader plan which also included a new policy and standard operating procedures Discussion ensued between Commissioner Cohen Higgins and Ms. Miller about the overtime budget. Commissioner Cohen Higgins asked how DTPW's overtime budget had gone from an actual spend of $67.4 million in FY 2023-24 to $69 million in FY 2024-25, $68 million the following year, and a proposed $75 million in the FY 2026-27 budget. Ms. Miller replied that the increase in actual spending year over year was six (6) percent and explained that after working with OMB the overtime budget had been tailored to actual expenditures, because the majority of overtime was scheduled. Commissioner Cohen Higgins noted that the prior year’s budgeted $58 million and projected $61 million had become $71 million in actual spending, leaving a $10 million difference between the projection and the actual. Ms. Miller clarified that actual FY 2026 spending was $71 million for transit and public works combined. Commissioner Cohen Higgins pointed out that the prior year had been under-budgeted by a difference between the budgeted $58 million and the projected $61 million turned into $71 million actual. She asked Ms. Miller whether the Committee should expect an additional $10 million in actual spending over the $75 million budget. Ms. Miller responded that it should not, because the budgeted amount of overtime for the current fiscal year was right-sized and no dramatic differences were expected as in previous years because the budgeted amount had been reallocated and right-sized to actual needs. Commissioner Cohen Higgins confirmed with Ms. Miller that the anticipated five-percent reduction equaled approximately $1 million of a $71 million overtime budget. Ms. Miller added that discretionary and unplanned overtime were being addressed through other mechanisms but that she did not have an anticipated reduction percentage for those efforts. Commissioner Cohen Higgins asked Ms. Miller for a greater percentage reduction in the department’s overtime budget, noting that the transportation budget was being balanced with approximately $96 million borrowed from another source for this fiscal year, while the only projected savings were $1 million in overtime. Ms. Miller indicated her belief that the Transportation Infrastructure Development (TID) loan to DTPW was for $66 million which she would confirm; she reiterated that scheduled overtime reductions would not occur until FY 2028 and committed to reducing non-scheduled overtime during FY 2027, although a specific reduction percentage was not available. Commissioner Cohen Higgins stated that if tax reform in the state passed, the County would be forced to make budget reductions regardless, and that more aggressive measures should be implemented immediately so that the transition for employees was not abrupt or disruptive. She asked DTPW to increase efforts to scale back overtime in a just, balanced, and measured way, and offered her assistance. Commissioner Gonzalez expressed his concerns regarding plans that did not produce measurable results unless the Board forced the conversation and paid attention. In response to Commissioner Gonzalez’s inquiry of how much the scheduling software had cost, Ms. Miller reported that the initial five-year term for the HASTUS program was $4 million and the 10-year term was $6.3 million. She elaborated that the cost would be recovered in less than four (4) years through overtime savings alone, and two (2) other contracts associated with the prior scheduling software had been canceled, which would save an additional $380,000 per year. She added that the prior scheduling software had cost almost $18 million over a 16-year period, and DTPW would reduce other contracts and produce savings, and that the department needed scheduling software regardless in order to schedule its runs. Commissioner Gonzalez estimated the net savings at roughly $700,000 after the software cost, than the $1.7 million projected. He commented that the Board would be paying attention to all County departments and would diligently examine the savings achieved so they could be spent for the benefit of the taxpayers. Chairwoman Lopez stated that the information on software costs and savings from discontinued software should have been included in the presentation, because savings were never just one element. She requested that the administration provide the Committee with comprehensive information moving forward, including what the department had before, what it no longer had, the savings realized, the cost of the new software, and when the savings would begin to be recouped. Chairwoman Lopez referred to the presentation slide listing the four types of overtime and noted that emergency overtime for clearing roadways during rain pointed to a broader infrastructure need in her district rather than an actual emergency. She requested Ms. Miller, to provide the Committee with a breakdown of the prior year’s overtime by category (emergency, unplanned, discretionary, and scheduled), including the amount of unplanned overtime attributable to absences and whether a particular person, unit, or group repeatedly generated the need for overtime, in advance of the January 2027 Committee meeting. Ms. Miller answered the department could provide that information and explained that in prior years there had been no code for emergency overtime, which had been recorded as discretionary unless related to an emergency that was reimbursable by the Federal Emergency Management Agency (FEMA), and that overtime would be coded differently going forward. She also noted that DTPW had a formal, long-standing process and disciplinary methodology for addressing excessive absenteeism. Chairwoman Lopez suggested adding subcategories such as absences, detours, weather, and illness, with dollar figures attached, and requested that DTPW return on a quarterly basis to report on its progress and any problematic areas that incurred overtime. Ms. Miller pointed out that the data did not exist for past years but that the department would determine which categories it could analyze and reason-code going forward. Commissioner Cohen Higgins requested Ms. Miller to return to the January 2027 Committee meeting to report on the department’s progress in reducing overtime during FY 2026-27. She noted that the department's salaries, excluding fringe benefits, were approximately $376 million according to the budget book, so that $75 million in overtime represented almost 20 percent of wages, and asked whether that was the industry standard for large transportation systems. Ms. Miller responded that she did not have that information and would investigate and explained that comparisons were difficult because each system operated under different collective bargaining agreements and requirements. Commissioner Cohen Higgins indicated that overtime metrics for other transportation systems would be of interest to study, and asked what percentage of DTPW's overtime was directly correlated to collective bargaining agreement (CBA) obligations. Ms. Miller responded that CBA obligations affected portions of scheduled, unplanned, and discretionary overtime and that further analysis would be needed to quantify them. Dr. Edwards stated that the administration could identify benchmarks, determine where DTPW compared relative to its peers, and perform a regression analysis of the variables driving any difference, one of which would be the CBAs. She said that while she could not attribute specific dollars to the CBAs, she could share the cost of particular work rules. She also noted that overtime functioned as both an employee benefit and a management tool, and that the administration wanted to bring more transparency to how it was used. Commissioner Cohen Higgins requested Ms. Miller and Dr. Edwards to provide the Committee, prior to the January 2027 Committee meeting, with benchmarks comparing DTPW’s overtime as a percentage of wages to other large transportation systems, a regression analysis of the variables driving any difference, the percentage of DTPW overtime attributable to collective bargaining agreement (CBA) obligations, and the cost of specific CBA work rules.[ Commissioner Gonzalez voiced his concerns that the department was not already comparing itself to other major metropolitan transportation systems. He remarked that Ms. Miller was responsible for the department’s future and directors needed to be proactive and operate on the level of the private sector. He supported Chairwoman Lopez's suggestion of quarterly reporting, not only for DTPW but for other County departments. Chairwoman Lopez stated that the quarterly reporting requirement could be discussed in the future and requested Ms. Miller to identify, within the overtime figures provided to the Committee, how much CBA-related overtime fell within the unplanned and discretionary categories. Dr. Edwards noted that DTPW had the requested information but simply did not have it available for today’s meeting. Chairwoman Lopez acknowledged this and asked that such details with dollar figures be included in future presentations.
Office of the Chairperson
10/14/2026
Additions
LEGISLATIVE TEXT
There is no text currently available online for this item.
An unhandled error has occurred. Reload 🗙