Miami-Dade
Legislative Item File Number: 261269 |
Printable PDF Format
|
| File Number: 261269 | File Type: Report | Status: Accepted | ||||||
| Version: 0 | Reference: | Control: County Commission | ||||||
|
||||||||
| Requester: Mayor | Cost: | Final Action: 7/21/2026 | ||||||
|
||||||||
|
||||||||
|
||||||||
| Sunset Provision: No | Effective Date: | Expiration Date: | ||||||
| Registered Lobbyist: | None Listed |
Legislative History |
|||||||
| Acting Body | Date | Agenda Item | Action | Sent To | Due Date | Returned | Pass/Fail |
| |
|||||||
| Board of County Commissioners | 7/21/2026 | 14B1 | Accepted | P | |||
| |
|||||||
| Office of the Chairperson | 7/20/2026 | Additions | |||||
| |
|||||||
| ROY COLEY | 7/9/2026 | Assigned | Office of Agenda Coordination | ||||
| |
|||||||
| Legislative Text |
|
TITLE REPORT REGARDING A PROPOSED 6% WATER AND WASTEWATER RETAIL RATE ADJUSTMENT FOR THE MIAMI-DADE WATER AND SEWER DEPARTMENT, EFFECTIVE OCTOBER 1, 2026 HEADER Date: To: Honorable Chairman Anthony Rodriguez and Members, Board of County Commissioners From: Daniella Levine Cava Mayor Subject: Report Regarding a Proposed 6% Water and Wastewater Retail Rate Adjustment for the Miami-Dade Water and Sewer Department, Effective October 1, 2026. STAFF RECOMMENDATION Executive Summary On May 21, 2013, via Resolution No. R-393-13, the Board directed Miami-Dade County (the County) to enter into a Consent Decree with the United States of America, the State of Florida and the Florida Department of Environmental Protection, fully acknowledging that compliance with these regulatory mandates would require rate adjustments for WASD to fund the necessary infrastructure improvements. Consistent with that commitment, WASD�s annual budget has historically incorporated projected retail revenue adjustments necessary to fund the Department�s Capital Improvement Program (CIP) and meet its regulatory obligations. Over the past five years, anticipated rate increases to support the CIP have ranged between 5% to 10% annually. Despite the needed rate increases that have been projected, the Department has consistently implemented retail rate adjustments below projected levels to minimize impacts to ratepayers in line with the Board�s direction. With the June 2028 Consent Decree compliance deadline rapidly approaching and the program already approximately 89% complete, stopping or slowing progress now would jeopardize years of investment, and place the County at risk of violating a court-mandated federal order, which could expose the County to enforcement actions and significant financial consequences, including penalties of up to $5,000 per day, in addition to public health and environmental impacts. A proposed 6% retail rate adjustment is necessary to allow WASD to fulfill its obligations under the Consent Decree, the State-mandated Ocean Outfall Legislation Program, the Advanced Metering Infrastructure (AMI) Implementation, and other critical regulatory requirements. Maintaining compliance and protecting the County�s infrastructure requires continued investment at this critical juncture. These investments are not discretionary. Past underinvestment in critical infrastructure directly contributed to system failures, sanitary sewer overflows, environmental harm to Biscayne Bay, violations of the Clean Water Act, and the federal enforcement actions that gave rise to the current Consent Decree. Absent approval of the proposed 6% rate adjustment, the Department would be forced to immediately suspend critical projects currently programmed for funding for FY 2026-27. Delaying action now will not eliminate the need for additional revenue; rather, it will mandate steeper, more burdensome rate increases in the future. For Fiscal Year (FY) 2026�27, the proposed retail rate adjustment would increase the monthly bill for low-usage households by approximately $0.82 and for the typical residential customer the increase would be approximately $3.77, or 12 cents per day.The adjustment is projected to generate approximately $65.6 million in recurring annual revenue, which is necessary to support approximately $435 million in bond financing. Rather than borrowing the full contract value upfront at the time of award, WASD utilizes a cash-flow funding model that finances projects incrementally based on actual construction progress and project schedules. This approach allows the Department to align borrowing with actual cash needs, minimize financing costs, avoid premature debt issuance, and maintain prudent fiscal stewardship. The next planned bond issuance is anticipated in Fiscal Year 2026�27 and is dependent upon the revenues generated by the proposed 6% retail rate adjustment. Importantly, even with the proposed adjustment, the average combined water and sewer bill will continue to remain below 1% of the median household income, well within national utility affordability standards as set by the U.S. Environmental Protection Agency. Recommendation This report provides information to the Board regarding the proposed 6% water and wastewater retail rate adjustment for WASD, effective October 1, 2026, including the Department�s regulatory and financial basis for the proposed adjustment and the impacts associated with maintaining a flat retail rate. In order to be implemented, the retail rate adjustment would require an amendment to Implementing Order 4-110, WASD�s Schedule of Rates, Fees, and Charges. Scope The proposed retail rate increase of 6%, effective October 1, 2026, will have a countywide impact to retail customers in WASD�s service areas. Fiscal Impact/Funding Source The additional revenues that will be generated by this 6% rate increase (approximately $65.6 million) will support the issuance of approximately $435 million in bonds. The proposed adjustment applies only to retail customers. Wholesale customer rates will be evaluated separately in accordance with applicable interlocal agreements following review by the bond consultant, with finalized rates presented as part of the annual County-wide budget ordinance in July. Background WASD�s CIP reflects regulatory drivers and broader system needs. The CIP includes approximately $1.15 billion for Consent Decree compliance and $1.37 billion to meet Ocean Outfall requirements as well as funding for critical system upgrades that are necessary for regulatory compliance. Of the total CIP, about half is expected to be financed through loans and bond issuances, while the remaining amount is supported through operating revenues, municipal contributions, per-and polyfluoroalkyl substances (PFAS) settlement monies and Building Better Communities General Obligation Bond proceeds. The Department�s Capital Improvement Program includes Professional Service Agreements (PSA) for engineering design, permitting, construction support, inspection, program management, and other technical services necessary to deliver projects. Without the requested increase, work under these PSAs will be cancelled. In addition, the cancellation of approximately $435 million in projects would significantly reduce the number of active projects requiring consultant support. As a result, certain task authorizations, including the Jacobs Engineering, AECOM, and Hazen and Sawyer PSAs, would also be terminated because the associated services would no longer be required. A significant number of ongoing and current projects would need to be immediately stopped and suspended. The impacts would be far-reaching and will affect projects needed for compliance with the Consent Decree, Ocean Outfall Legislation initiatives, Advanced Metering Infrastructure (AMI) implementation, and other critical infrastructure improvements essential to maintaining regulatory compliance and system reliability. A list of projects that will be immediately cancelled are further identified on Figure 1 below. Figure 1: Projects and PSAs that would be immediately cancelled OMB No. Proposed Allocation Project Name Professional Services Agreements Contractor Various $12,788,783 Ocean Outfall Program JACOBS ENGINEERING VARIOUS Various $183,464 Consent Decree Program and Construction Management AECOM VARIOUS Various $1,900,000 Water and Sewer Design Services AECOM VARIOUS Various $4,400,000 Wastewater Design Services HAZEN AND SAWYER VARIOUS Various $4,400,000 Wastewater Design Services BLACK AND VEATCH VARIOUS Various $4,400,000 Wastewater Design Services BROWN & CALDWELL VARIOUS Various $2,200,000 Capacity, Management, Operations and Maintenance HDR ENGINEERING VARIOUS 964120 $41,032,387 Building Access Safety KHAN AND ASSOCIATES ALLIED CONTRACTORS Oxygen Production Facility BLACK AND VEATCH TBD RAS Pump Station Upgrade Plant 1 STANTEC CONSULTING TBD Digesters Rehabilitation Cluster 3 BROWN & CALDWELL TBD 968150 $4,500,000 48-in PCCP Forcemain Replacement - Opa Locka (Phase 2) HDR ENGINEERING TBD 964440 $826,450 Pump Station Upgrades (Regional) HBC ENGINEERING MAESTRE CONSTRUCTION 962670 $4,390,120 Industrial Reuse System (South) BLACK AND VEATCH TBD 2000002314 $30,250,000 Treatment Filters Upgrade (Orr Plant) HDR ENGINERRING TBD Advanced Metering Infrastructure ARDURRA CORE & MAIN Flood Mitigation and Lightning Protection Improvements HAZEN AND SAWYER TBD Generator Replacement (Water) PARSONS TBD New 96-in raw water main CHA CONSULTING TBD Inspection /Cleaning of Drains WASD ENGINEERING FLOTECH ENVIRONMENTAL 9653411 $7,170,731 Effluent Pump Station Upgrade BROWN & CALDWELL POOLE & KENT Monitoring Well Installation (North) CDM SMITH INC TBD Drainage Improvements (North) PREMIERE DESIGN TBD Secondary Clarifiers Ventilation JACOBS ENGINEERING TBD 9653421 $27,893,326 Hypochlorite Building Hardening STANTEC CONSULTING COMTECH ENGINEERING Grant Funded: PS 2 Structural and Hardening Upgrades JACOBS ENGINEERING TBD Grant Funded: PS 1 Structural and Hardening Upgrades STANTEC CONSULTING TBD New Headwork Facility (Central) HAZEN AND SAWYER TBD 9655481 $2,970,784 Monitoring Well Installation CDM SMITH INC ALL WEBBS ENTERPRISES 9653401 $13,578,864 Co-Generation Facility HVAC Improvements (South) JACOBS ENGINEERING TBD Installation of Effluent Pump (South) JACOBS ENGINEERING TBD Cogeneration Facility Rehabilitation JACOBS ENGINEERING TBD Plantwide Disinfection System Evaluation HAZEN AND SAWYER TBD 967190 $3,076,322 Transmission Main Replacement KIMLEY-HORN TBD 9650201 $15,605,946 FED Required - Inflow and Infiltration Inspection & Repairs WASD ENGINEERING TBD 9653311 $5,500,000 JPA with City of Miami - Auburndale Neighborhood CHA CONSULTING DAVID MANCINI AND SONS 9653201 $11,734,255 Compliance Upgrade: Lab and Control Room JACOBS ENGINEERING TBD Compliance Upgrade: Lab and Control Room STANTEC CONSULTING TBD Plantwide Structural Assessment (Central) ARCADIS U S INC TBD 9650271 $5,050,950 Control Room Facility Upgrade (Hialeah) KIMLEY-HORN TBD 9654061 $16,797,319 Supply Wells Upgrade BLACK AND VEATCH MAESTRE CONSTRUCTION Monitoring Well Installation for Effluent Disposal System WASD ENGINEERING NV5 INC New Supply Wells (Wellfield) BLACK AND VEATCH TBD Everglades Plant Upgrade HAZEN AND SAWYER ALL WEBBS ENTERPRISES Naranja Plant Upgrade HAZEN AND SAWYER TBD 9650021 $2,125,304 Sludge Line Replacement (Orr) HAZEN AND SAWYER TBD 9650241 $8,975,000 Connect 2 Protect - Lateral Expansion WASD ENGINEERING CENTRAL CIVIL New Regional Pump Station - Downtown Miami CHA CONSULTING TBD 9653371 $3,091,050 2050 Planning Horizon Integrated Master Plan - Wastewater HAZEN AND SAWYER N/A 9654031 $25,836,782 Small Diameter Replacement NE 203 Terr BND ENGINEERS INC TBD 54-in PCCP Watermain SW 56th St & SW 67th Av WADE TRIM INC TBD 36-in Crossing Normandy Isle along 79th St via HDD WADE TRIM INC TBD 9652101 $20,147,250 Replacement of 36-in Forcemain NE 163rd St JACOBS ENGINEERING TBD PS-0415 to PS-0422 Transmission Force Main Replacement CHA CONSULTING ROADWAY CONSTRUCTION Aventura (Biscayne Blvd) Force Main Replacement KIMLEY-HORN TBD Replacement of 36-in Forcemain Snake Creek Canal STANTEC CONSULTING TBD 2000000784 $45,408,826 Pump Station 49, 425 Upgrade PARSONS TBD Pump Station 0300 Upgrade CHA CONSULTING POOLE & KENT Pump Station 0613, 616 Relocation MILIAN SWAIN TBD Pump Station No. 0618 Upgrade HSQ GROUP LLC TBD Pump Station No. 455, 812, 831, 856, 867, 882, 894 Upgrade MILLER LEGG TBD Pump Station No. 2, 345, 347 and 348 Generator / Upgrade HDR ENGINEERING TBD Pump Station 374, 404, 408, 409, 410 Upgrade PREMIERE DESIGN TBD Pump Station 18, 33, 34, 41, and 315, 413, 443, 1163 SRS ENGINEERING INC TBD Pump Station 0703 Upgrade C SOLUTIONS INC TBD Pump Station 0339 Upgrade BND ENGINEERS INC TBD Pump Station 63, 382, 549, 704, 803, 815, 865, 1034 CES CONSULTANTS TBD 9650031 $39,976,612 Regulatory Lab & Operator Control Room Replacement HDR ENGINEERING TBD East and West Pump Room Upgrades HDR ENGINEERING TBD Holding Tanks and Contact Basins Improvement (Orr) HDR ENGINEERING TBD Lime Plant Fire and HVAC (Orr) GARVER LLC TBD Electrical Replacement and Upgrade (Orr) HDR ENGINEERING TBD Electrical Distribution Building Upgrade (Orr) HDR ENGINEERING TBD Pumping Facility Upgrade (Orr) HAZEN AND SAWYER TBD 9650041 $40,981,155 New Hypochlorite Facility (Preston) BLACK AND VEATCH TBD Filter Backwash Tank (Hialeah) BLACK AND VEATCH RF ENVIRONMENTAL East and West Pump Room Upgrades (Hialeah) BLACK AND VEATCH TBD Electrical Distribution Building Upgrade BLACK AND VEATCH TBD Operator's Control Room Upgrade (Hialeah) BLACK AND VEATCH TBD Building Access Safety and Code Compliance (WTPs) WANTMAN GROUP TBD Plantwide Structural Assessment - Hialeah DIAZ, CARRENO, SCOTTI TBD Pumping Facility Upgrade (Preston) BLACK AND VEATCH TBD Electrical Upgrades Medium Voltage HDR ENGINEERING TBD Lime Plant Holding Tanks Upgrade (Hialeah) BLACK AND VEATCH TBD Filter Overhaul and Automation (Hialeah) HDR ENGINEERING TBD 2000000072 $27,552,609 Watermain Upgrade: Green Tech Corridor S-4 CHEN MOORE TBD Watermain Upgrade: Green Tech Corridor D2 ROSS ENGINEERING INC TBD Watermain Upgrade: SW 87th AVE and Caribbean Blvd 300 ENGINEERING TBD Watermain Upgrade: NW 1st St and NW 11th Ave HSQ GROUP LLC TBD Watermain Upgrade: NE 6 & 7 Ct and Snapper Creek PREMIERE DESIGN TBD Watermain Upgrade: Atlas W32 Quadrant A&B NOVA CONSULTING TBD Watermain Upgrade: SW 9th & 5th Ave SRS ENGINEERING INC TBD Valves and Access Manholes Replacement CHA CONSULTING TBD Watermain Upgrade: SW 5th, and E Palm Dr CHEN MOORE TBD Watermain Upgrade: Atlas P16 Quadrant C 300 ENGINEERING TBD Watermain Upgrade: Atlas Q16 ADA ENGINEERING TBD Watermain Upgrade: Atlas V31 CHEN MOORE TBD Watermain Upgrade: Atlas K3 Quadrant C HSQ GROUP LLC TBD Watermain Upgrade: Atlas F13 PREMIERE DESIGN TBD Watermain Upgrade: Atlas R26 ROSS ENGINEERING INC TBD Watermain Upgrade: Atlas K17 SRS ENGINEERING INC TBD 2050 Planning Horizon Integrated Master Plan - Water HAZEN AND SAWYER TBD TOTAL: $434,744,289 For ongoing multi-year construction projects and professional service agreements, work stoppages could trigger stipulated penalties, contractor claims, delay damages, remobilization costs, and increased project delivery expenses, while also exposing the Department to potential service disruptions, regulatory violations and enforcement actions. In addition, maintaining flat rates would have serious implications for WASD�s financial compliance requirements.�Specifically, it would hinder the Department�s ability to meet the minimum annual investment thresholds for system renewal and replacement required under the County�s 1993 Master Bond Ordinance, as well as the required debt service coverage ratios for the issuance of additional bonds: 1.10 for senior obligations and 1.00 for subordinate obligations. Falling below these thresholds would constitute a violation of bond covenants, requiring disclosure to financial markets and likely resulting in reduced investor confidence. This, in turn, could trigger a credit rating downgrade, increasing borrowing costs, limiting access to favorable financing, and constraining the Department�s ability to fund future projects. The proposed 6% retail rate adjustment, coupled with the aggressive cost-control measures implemented by the Department as part of FY 2025-26, represents a balanced, disciplined, and fiscally responsible approach to sustaining WASD�s critical progress while continuing to protect ratepayers and the broader community. Even with the FY 2026-27 adjustment, WASD�s rates will remain below the average of major cities and among the most affordable, as shown in Figure 2. In addition, through its WISE305 initiative, the Department continues to invest in advanced leak detection technologies that proactively identify leaks, helping reduce water loss, improve operational efficiency, and maximize the value of every dollar invested by ratepayers. Moreover, approval of the proposed rate adjustment will support the successful completion of the Consent Decree program, which is necessary not only to satisfy the County�s federal compliance obligations, but also to better position the County to advance related regulatory reforms. Because the existing Fats, Oils, and Grease (FOG) Ordinance was adopted pursuant to the Consent Decree following federal and state regulatory review, delays in completing the program could further constrain the County�s ability to implement more efficient, locally tailored FOG Ordinance amendments requested by the Board. The Administration remains firmly committed to prudent fiscal stewardship and will continue to aggressively pursue operational efficiencies, cost-containment strategies, and revenue optimization initiatives to minimize impacts to ratepayers while strengthening the utility�s long-term financial stability. Figure 2: WASD Rates Compared to Comparable Utilities |
|
Home |
Agendas |
Minutes |
Legislative Search |
Lobbyist Registration |
Legislative Reports
Home | Using Our Site | About | Phone Directory | Privacy | Disclaimer
E-mail your comments,
questions and suggestions to
Webmaster
|