Miami-Dade Legislative Item
File Number: 261269
Printable PDF Format Download Adobe Reader    

File Number: 261269 File Type: Report Status: Accepted
Version: 0 Reference: Control: County Commission
File Name: WATER AND WASTEWATER RETAIL RATE ADJUSTMENT REPORT Introduced: 7/9/2026
Requester: Mayor Cost: Final Action: 7/21/2026
Agenda Date: 7/21/2026 Agenda Item Number: 14B1
Notes: LATE ITEM Title: REPORT REGARDING A PROPOSED 6% WATER AND WASTEWATER RETAIL RATE ADJUSTMENT FOR THE MIAMI-DADE WATER AND SEWER DEPARTMENT, EFFECTIVE OCTOBER 1, 2026
Indexes: NONE
Sponsors: NONE
Sunset Provision: No Effective Date: Expiration Date:
Registered Lobbyist: None Listed


Legislative History

Acting Body Date Agenda Item Action Sent To Due Date Returned Pass/Fail

Board of County Commissioners 7/21/2026 14B1 Accepted P

Office of the Chairperson 7/20/2026 Additions

ROY COLEY 7/9/2026 Assigned Office of Agenda Coordination

Legislative Text


TITLE
REPORT REGARDING A PROPOSED 6% WATER AND WASTEWATER RETAIL RATE ADJUSTMENT FOR THE MIAMI-DADE WATER AND SEWER DEPARTMENT, EFFECTIVE OCTOBER 1, 2026

HEADER
Date:

To: Honorable Chairman Anthony Rodriguez
and Members, Board of County Commissioners

From: Daniella Levine Cava
Mayor

Subject: Report Regarding a Proposed 6% Water and Wastewater Retail Rate Adjustment for the Miami-Dade Water and Sewer Department, Effective October 1, 2026.

STAFF RECOMMENDATION
Executive Summary
On May 21, 2013, via Resolution No. R-393-13, the Board directed Miami-Dade County (the County) to enter into a Consent Decree with the United States of America, the State of Florida and the Florida Department of Environmental Protection, fully acknowledging that compliance with these regulatory mandates would require rate adjustments for WASD to fund the necessary infrastructure improvements. Consistent with that commitment, WASD�s annual budget has historically incorporated projected retail revenue adjustments necessary to fund the Department�s Capital Improvement Program (CIP) and meet its regulatory obligations. Over the past five years, anticipated rate increases to support the CIP have ranged between 5% to 10% annually. Despite the needed rate increases that have been projected, the Department has consistently implemented retail rate adjustments below projected levels to minimize impacts to ratepayers in line with the Board�s direction.

With the June 2028 Consent Decree compliance deadline rapidly approaching and the program already approximately 89% complete, stopping or slowing progress now would jeopardize years of investment, and place the County at risk of violating a court-mandated federal order, which could expose the County to enforcement actions and significant financial consequences, including penalties of up to $5,000 per day, in addition to public health and environmental impacts.

A proposed 6% retail rate adjustment is necessary to allow WASD to fulfill its obligations under the Consent Decree, the State-mandated Ocean Outfall Legislation Program, the Advanced Metering Infrastructure (AMI) Implementation, and other critical regulatory requirements. Maintaining compliance and protecting the County�s infrastructure requires continued investment at this critical juncture. These investments are not discretionary. Past underinvestment in critical infrastructure directly contributed to system failures, sanitary sewer overflows, environmental harm to Biscayne Bay, violations of the Clean Water Act, and the federal enforcement actions that gave rise to the current Consent Decree. Absent approval of the proposed 6% rate adjustment, the Department would be forced to immediately suspend critical projects currently programmed for funding for FY 2026-27. Delaying action now will not eliminate the need for additional revenue; rather, it will mandate steeper, more burdensome rate increases in the future.

For Fiscal Year (FY) 2026�27, the proposed retail rate adjustment would increase the monthly bill for low-usage households by approximately $0.82 and for the typical residential customer the increase would be approximately $3.77, or 12 cents per day.The adjustment is projected to generate approximately $65.6 million in recurring annual revenue, which is necessary to support approximately $435 million in bond financing. Rather than borrowing the full contract value upfront at the time of award, WASD utilizes a cash-flow funding model that finances projects incrementally based on actual construction progress and project schedules. This approach allows the Department to align borrowing with actual cash needs, minimize financing costs, avoid premature debt issuance, and maintain prudent fiscal stewardship. The next planned bond issuance is anticipated in Fiscal Year 2026�27 and is dependent upon the revenues generated by the proposed 6% retail rate adjustment. Importantly, even with the proposed adjustment, the average combined water and sewer bill will continue to remain below 1% of the median household income, well within national utility affordability standards as set by the U.S. Environmental Protection Agency.

Recommendation
This report provides information to the Board regarding the proposed 6% water and wastewater retail rate adjustment for WASD, effective October 1, 2026, including the Department�s regulatory and financial basis for the proposed adjustment and the impacts associated with maintaining a flat retail rate. In order to be implemented, the retail rate adjustment would require an amendment to Implementing Order 4-110, WASD�s Schedule of Rates, Fees, and Charges.

Scope
The proposed retail rate increase of 6%, effective October 1, 2026, will have a countywide impact to retail customers in WASD�s service areas.

Fiscal Impact/Funding Source
The additional revenues that will be generated by this 6% rate increase (approximately $65.6 million) will support the issuance of approximately $435 million in bonds. The proposed adjustment applies only to retail customers. Wholesale customer rates will be evaluated separately in accordance with applicable interlocal agreements following review by the bond consultant, with finalized rates presented as part of the annual County-wide budget ordinance in July.

Background
WASD�s CIP reflects regulatory drivers and broader system needs. The CIP includes approximately $1.15 billion for Consent Decree compliance and $1.37 billion to meet Ocean Outfall requirements as well as funding for critical system upgrades that are necessary for regulatory compliance. Of the total CIP, about half is expected to be financed through loans and bond issuances, while the remaining amount is supported through operating revenues, municipal contributions, per-and polyfluoroalkyl substances (PFAS) settlement monies and Building Better Communities General Obligation Bond proceeds.

The Department�s Capital Improvement Program includes Professional Service Agreements (PSA) for engineering design, permitting, construction support, inspection, program management, and other technical services necessary to deliver projects. Without the requested increase, work under these PSAs will be cancelled. In addition, the cancellation of approximately $435 million in projects would significantly reduce the number of active projects requiring consultant support. As a result, certain task authorizations, including the Jacobs Engineering, AECOM, and Hazen and Sawyer PSAs, would also be terminated because the associated services would no longer be required.

A significant number of ongoing and current projects would need to be immediately stopped and suspended. The impacts would be far-reaching and will affect projects needed for compliance with the Consent Decree, Ocean Outfall Legislation initiatives, Advanced Metering Infrastructure (AMI) implementation, and other critical infrastructure improvements essential to maintaining regulatory compliance and system reliability. A list of projects that will be immediately cancelled are further identified on Figure 1 below.

Figure 1: Projects and PSAs that would be immediately cancelled

OMB No.
Proposed Allocation
Project Name
Professional Services Agreements
Contractor
Various
$12,788,783
Ocean Outfall Program
JACOBS ENGINEERING
VARIOUS
Various
$183,464
Consent Decree Program and Construction Management
AECOM
VARIOUS
Various
$1,900,000
Water and Sewer Design Services
AECOM
VARIOUS
Various
$4,400,000
Wastewater Design Services
HAZEN AND SAWYER
VARIOUS
Various
$4,400,000
Wastewater Design Services
BLACK AND VEATCH
VARIOUS
Various
$4,400,000
Wastewater Design Services
BROWN & CALDWELL
VARIOUS
Various
$2,200,000
Capacity, Management, Operations and Maintenance
HDR ENGINEERING
VARIOUS
964120
$41,032,387
Building Access Safety
KHAN AND ASSOCIATES
ALLIED CONTRACTORS

Oxygen Production Facility
BLACK AND VEATCH
TBD

RAS Pump Station Upgrade Plant 1
STANTEC CONSULTING
TBD

Digesters Rehabilitation Cluster 3
BROWN & CALDWELL
TBD
968150
$4,500,000
48-in PCCP Forcemain Replacement - Opa Locka (Phase 2)
HDR ENGINEERING
TBD
964440
$826,450
Pump Station Upgrades (Regional)
HBC ENGINEERING
MAESTRE CONSTRUCTION
962670
$4,390,120
Industrial Reuse System (South)
BLACK AND VEATCH
TBD
2000002314
$30,250,000
Treatment Filters Upgrade (Orr Plant)
HDR ENGINERRING
TBD


Advanced Metering Infrastructure
ARDURRA
CORE & MAIN


Flood Mitigation and Lightning Protection Improvements
HAZEN AND SAWYER
TBD


Generator Replacement (Water)
PARSONS
TBD


New 96-in raw water main
CHA CONSULTING
TBD


Inspection /Cleaning of Drains
WASD ENGINEERING
FLOTECH ENVIRONMENTAL
9653411
$7,170,731
Effluent Pump Station Upgrade
BROWN & CALDWELL
POOLE & KENT


Monitoring Well Installation (North)
CDM SMITH INC
TBD


Drainage Improvements (North)
PREMIERE DESIGN
TBD


Secondary Clarifiers Ventilation
JACOBS ENGINEERING
TBD
9653421
$27,893,326
Hypochlorite Building Hardening
STANTEC CONSULTING
COMTECH ENGINEERING


Grant Funded: PS 2 Structural and Hardening Upgrades
JACOBS ENGINEERING
TBD


Grant Funded: PS 1 Structural and Hardening Upgrades
STANTEC CONSULTING
TBD


New Headwork Facility (Central)
HAZEN AND SAWYER
TBD
9655481
$2,970,784
Monitoring Well Installation
CDM SMITH INC
ALL WEBBS ENTERPRISES
9653401
$13,578,864
Co-Generation Facility HVAC Improvements (South)
JACOBS ENGINEERING
TBD


Installation of Effluent Pump (South)
JACOBS ENGINEERING
TBD


Cogeneration Facility Rehabilitation
JACOBS ENGINEERING
TBD


Plantwide Disinfection System Evaluation
HAZEN AND SAWYER
TBD
967190
$3,076,322
Transmission Main Replacement
KIMLEY-HORN
TBD
9650201
$15,605,946
FED Required - Inflow and Infiltration Inspection & Repairs
WASD ENGINEERING
TBD
9653311
$5,500,000
JPA with City of Miami - Auburndale Neighborhood
CHA CONSULTING
DAVID MANCINI AND SONS
9653201
$11,734,255
Compliance Upgrade: Lab and Control Room
JACOBS ENGINEERING
TBD


Compliance Upgrade: Lab and Control Room
STANTEC CONSULTING
TBD


Plantwide Structural Assessment (Central)
ARCADIS U S INC
TBD
9650271
$5,050,950
Control Room Facility Upgrade (Hialeah)
KIMLEY-HORN
TBD
9654061
$16,797,319
Supply Wells Upgrade
BLACK AND VEATCH
MAESTRE CONSTRUCTION


Monitoring Well Installation for Effluent Disposal System
WASD ENGINEERING
NV5 INC


New Supply Wells (Wellfield)
BLACK AND VEATCH
TBD


Everglades Plant Upgrade
HAZEN AND SAWYER
ALL WEBBS ENTERPRISES


Naranja Plant Upgrade
HAZEN AND SAWYER
TBD
9650021
$2,125,304
Sludge Line Replacement (Orr)
HAZEN AND SAWYER
TBD
9650241
$8,975,000
Connect 2 Protect - Lateral Expansion
WASD ENGINEERING
CENTRAL CIVIL


New Regional Pump Station - Downtown Miami
CHA CONSULTING
TBD
9653371
$3,091,050
2050 Planning Horizon Integrated Master Plan - Wastewater
HAZEN AND SAWYER
N/A
9654031
$25,836,782
Small Diameter Replacement NE 203 Terr
BND ENGINEERS INC
TBD


54-in PCCP Watermain SW 56th St & SW 67th Av
WADE TRIM INC
TBD


36-in Crossing Normandy Isle along 79th St via HDD
WADE TRIM INC
TBD
9652101
$20,147,250
Replacement of 36-in Forcemain NE 163rd St
JACOBS ENGINEERING
TBD


PS-0415 to PS-0422 Transmission Force Main Replacement
CHA CONSULTING
ROADWAY CONSTRUCTION


Aventura (Biscayne Blvd) Force Main Replacement
KIMLEY-HORN
TBD


Replacement of 36-in Forcemain Snake Creek Canal
STANTEC CONSULTING
TBD
2000000784
$45,408,826
Pump Station 49, 425 Upgrade
PARSONS
TBD


Pump Station 0300 Upgrade
CHA CONSULTING
POOLE & KENT


Pump Station 0613, 616 Relocation
MILIAN SWAIN
TBD


Pump Station No. 0618 Upgrade
HSQ GROUP LLC
TBD


Pump Station No. 455, 812, 831, 856, 867, 882, 894 Upgrade
MILLER LEGG
TBD


Pump Station No. 2, 345, 347 and 348 Generator / Upgrade
HDR ENGINEERING
TBD


Pump Station 374, 404, 408, 409, 410 Upgrade
PREMIERE DESIGN
TBD


Pump Station 18, 33, 34, 41, and 315, 413, 443, 1163
SRS ENGINEERING INC
TBD


Pump Station 0703 Upgrade
C SOLUTIONS INC
TBD


Pump Station 0339 Upgrade
BND ENGINEERS INC
TBD


Pump Station 63, 382, 549, 704, 803, 815, 865, 1034
CES CONSULTANTS
TBD
9650031
$39,976,612
Regulatory Lab & Operator Control Room Replacement
HDR ENGINEERING
TBD


East and West Pump Room Upgrades
HDR ENGINEERING
TBD


Holding Tanks and Contact Basins Improvement (Orr)
HDR ENGINEERING
TBD


Lime Plant Fire and HVAC (Orr)
GARVER LLC
TBD


Electrical Replacement and Upgrade (Orr)
HDR ENGINEERING
TBD


Electrical Distribution Building Upgrade (Orr)
HDR ENGINEERING
TBD


Pumping Facility Upgrade (Orr)
HAZEN AND SAWYER
TBD
9650041
$40,981,155
New Hypochlorite Facility (Preston)
BLACK AND VEATCH
TBD


Filter Backwash Tank (Hialeah)
BLACK AND VEATCH
RF ENVIRONMENTAL


East and West Pump Room Upgrades (Hialeah)
BLACK AND VEATCH
TBD


Electrical Distribution Building Upgrade
BLACK AND VEATCH
TBD


Operator's Control Room Upgrade (Hialeah)
BLACK AND VEATCH
TBD


Building Access Safety and Code Compliance (WTPs)
WANTMAN GROUP
TBD


Plantwide Structural Assessment - Hialeah
DIAZ, CARRENO, SCOTTI
TBD


Pumping Facility Upgrade (Preston)
BLACK AND VEATCH
TBD


Electrical Upgrades Medium Voltage
HDR ENGINEERING
TBD


Lime Plant Holding Tanks Upgrade (Hialeah)
BLACK AND VEATCH
TBD


Filter Overhaul and Automation (Hialeah)
HDR ENGINEERING
TBD
2000000072
$27,552,609
Watermain Upgrade: Green Tech Corridor S-4
CHEN MOORE
TBD


Watermain Upgrade: Green Tech Corridor D2
ROSS ENGINEERING INC
TBD


Watermain Upgrade: SW 87th AVE and Caribbean Blvd
300 ENGINEERING
TBD


Watermain Upgrade: NW 1st St and NW 11th Ave
HSQ GROUP LLC
TBD


Watermain Upgrade: NE 6 & 7 Ct and Snapper Creek
PREMIERE DESIGN
TBD


Watermain Upgrade: Atlas W32 Quadrant A&B
NOVA CONSULTING
TBD


Watermain Upgrade: SW 9th & 5th Ave
SRS ENGINEERING INC
TBD


Valves and Access Manholes Replacement
CHA CONSULTING
TBD


Watermain Upgrade: SW 5th, and E Palm Dr
CHEN MOORE
TBD


Watermain Upgrade: Atlas P16 Quadrant C
300 ENGINEERING
TBD


Watermain Upgrade: Atlas Q16
ADA ENGINEERING
TBD


Watermain Upgrade: Atlas V31
CHEN MOORE
TBD


Watermain Upgrade: Atlas K3 Quadrant C
HSQ GROUP LLC
TBD


Watermain Upgrade: Atlas F13
PREMIERE DESIGN
TBD


Watermain Upgrade: Atlas R26
ROSS ENGINEERING INC
TBD


Watermain Upgrade: Atlas K17
SRS ENGINEERING INC
TBD


2050 Planning Horizon Integrated Master Plan - Water
HAZEN AND SAWYER
TBD
TOTAL: $434,744,289

For ongoing multi-year construction projects and professional service agreements, work stoppages could trigger stipulated penalties, contractor claims, delay damages, remobilization costs, and increased project delivery expenses, while also exposing the Department to potential service disruptions, regulatory violations and enforcement actions.

In addition, maintaining flat rates would have serious implications for WASD�s financial compliance requirements.�Specifically, it would hinder the Department�s ability to meet the minimum annual investment thresholds for system renewal and replacement required under the County�s 1993 Master Bond Ordinance, as well as the required debt service coverage ratios for the issuance of additional bonds: 1.10 for senior obligations and 1.00 for subordinate obligations. Falling below these thresholds would constitute a violation of bond covenants, requiring disclosure to financial markets and likely resulting in reduced investor confidence. This, in turn, could trigger a credit rating downgrade, increasing borrowing costs, limiting access to favorable financing, and constraining the Department�s ability to fund future projects.

The proposed 6% retail rate adjustment, coupled with the aggressive cost-control measures implemented by the Department as part of FY 2025-26, represents a balanced, disciplined, and fiscally responsible approach to sustaining WASD�s critical progress while continuing to protect ratepayers and the broader community. Even with the FY 2026-27 adjustment, WASD�s rates will remain below the average of major cities and among the most affordable, as shown in Figure 2. In addition, through its WISE305 initiative, the Department continues to invest in advanced leak detection technologies that proactively identify leaks, helping reduce water loss, improve operational efficiency, and maximize the value of every dollar invested by ratepayers.

Moreover, approval of the proposed rate adjustment will support the successful completion of the Consent Decree program, which is necessary not only to satisfy the County�s federal compliance obligations, but also to better position the County to advance related regulatory reforms. Because the existing Fats, Oils, and Grease (FOG) Ordinance was adopted pursuant to the Consent Decree following federal and state regulatory review, delays in completing the program could further constrain the County�s ability to implement more efficient, locally tailored FOG Ordinance amendments requested by the Board. The Administration remains firmly committed to prudent fiscal stewardship and will continue to aggressively pursue operational efficiencies, cost-containment strategies, and revenue optimization initiatives to minimize impacts to ratepayers while strengthening the utility�s long-term financial stability.

Figure 2: WASD Rates Compared to Comparable Utilities



Home  |   Agendas  |   Minutes  |   Legislative Search  |   Lobbyist Registration  |   Legislative Reports
2026 BCC Meeting Calendar  |   Miami-Dade County Code of Ordinances   |   ADA Notice  |  

Home  |  Using Our Site  |  About  |  Phone Directory  |  Privacy  |  Disclaimer

E-mail your comments, questions and suggestions to Webmaster  

Web Site � 2026 Miami-Dade County.
All rights reserved.