|
Miami-Dade
Legislative Item File Number: 261754 |
Printable PDF Format
|
| File Number: 261754 | File Type: Resolution | Status: Deferred | ||||||
| Version: 0 | Reference: | Control: County Commission | ||||||
|
||||||||
| Requester: Water & Sewer Department | Cost: | Final Action: | ||||||
|
||||||||
|
||||||||
|
||||||||
| Sunset Provision: No | Effective Date: | Expiration Date: | ||||||
| Registered Lobbyist: | None Listed |
Legislative History |
|||||||
| Acting Body | Date | Agenda Item | Action | Sent To | Due Date | Returned | Pass/Fail |
| |
|||||||
| Board of County Commissioners | 10/20/2026 | 8O2 | Deferred | ||||
| |
|||||||
| Office of the Chairperson | 10/19/2026 | Deferrals | |||||
| REPORT: | Administration is requesting a deferral to no date certain. | ||||||
| |
|||||||
| ROY COLEY | 10/2/2026 | Assigned | Office of Agenda Coordination | 10/2/2026 | 10/2/2026 | ||
| |
|||||||
| Office of Agenda Coordination | 10/2/2026 | Assigned | County Attorney | 10/20/2026 | |||
| REPORT: | WASD - No sponsor - no cmte - County attorney Sarah E Davis - attachments: exhibits A-C - PGS 54 | ||||||
| |
|||||||
| County Attorney | 10/2/2026 | Assigned | Sarah E. Davis | 10/2/2026 | |||
| |
|||||||
| Legislative Text |
|
TITLE RESOLUTION RATIFYING ACTION BY THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE RELATED TO MIAMI-DADE WATER AND SEWER DEPARTMENT�S CONSENT DECREE AND CAPITAL IMPROVEMENT PROGRAMS ACCELERATION ORDINANCE PURSUANT TO SECTION 2-8.2.12 OF THE CODE OF MIAMI-DADE COUNTY, FLORIDA, SPECIFICALLY APPROVAL OF CHANGE ORDER NO. 1 TO PROJECT NO. DB20-WASD-01 � CONTRACT NO. 20LCCF003, DESIGN-BUILD SERVICES TO INSTALL A 54-INCH DIAMETER WATER TRANSMISSION MAIN ALONG RED ROAD, FROM THE JOHN E. PRESTON WATER TREATMENT PLANT TO WEST 53RD STREET, BETWEEN MIAMI-DADE COUNTY AND LANZO CONSTRUCTION CO., FLORIDA, WHICH CHANGE ORDER INCREASES THE CONTRACT BY $2,000,000.00 AND GRANTS A 106-DAY NON-COMPENSABLE TIME EXTENSION BODY WHEREAS, this Board desires to accomplish the purposes outlined in the accompanying memorandum, a copy of which is incorporated herein by reference, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MIAMI-DADE COUNTY, FLORIDA, that this Board ratifies the action of the County Mayor or County Mayor�s designee, as authorized by section 2-8.2.12 of the Code of Miami-Dade County, Florida, specifically, approval of Change Order No. 1 to Project No. DB20-WASD-01, Contract No. 20LCCF003, Design-Build Services To Install a 54-Inch Diameter Water Transmission Main Along Red Road, from the John E. Preston Water Treatment Plant to West 53rd Street, between Miami-Dade County and Lanzo Construction Co., Florida. Change Order No. 1 increases the Contract by $2,000,000.00 and grants a 106-day non-compensable time extension. A copy of Change Order No. 1 is attached to the accompanying memorandum as Exhibit A. HEADER Date: To: Honorable Chairman Anthony Rodriguez and Members, Board of County Commissioners From: Daniella Levine Cava Mayor Subject: Resolution Ratifying Change Order No. 1 to Project No. DB20-WASD-01, Contract No. 20LCCF003, for Design-Build Services to Install a 54-inch Diameter Water Transmission Main Along Red Road, from the John E. Preston Water Treatment Plant to West 53rd Street with Lanzo Construction Co., Florida STAFF RECOMMENDATION Executive Summary The item seeks ratification by the Board of County Commissioners (the Board) of the action of the County Mayor or County Mayor�s designee approving Change Order No. 1 to Project No. DB20-WASD-01, Contract No. 20LCCF003 (the Contract), between Miami-Dade County (the County) and Lanzo Construction Co., Florida (the Contractor) for Design-Build Services to Install a 54-inch Diameter Water Transmission Main Along Red Road, from the John E. Preston Water Treatment Plant to West 53rd Street (the Project). Change Order No. 1 increases the Contract by $2,000,000.00 and grants a 106-calendar day non-compensable time extension The Project includes the design and construction of approximately 3.2 miles of a 54-inch diameter ductile iron pipe (DIP) water transmission main, including approximately 2,540 liner feet (LF) of micro-tunneling for the 54-inch diameter carrier pipe at crossings with canals, Metrorail, railroad tracks, Florida Department of Transportation (FDOT) roadways, and major intersections. The new water main will originate at the John E. Preston Water Treatment Plant (JEPWTP) and extend east along West 13th Street to West 1st Avenue. From there, it will continue north along West 1st Avenue to West 29th Street, then west along West 29th Street to Service Road. The alignment will proceed along Service Road to West 53rd Street where it will connect to the existing 54-inch water main on Red Road, south of the Little River Canal. Change Order No. 1 increases the Contract by $2,000,000.00 and grants a 106-calendar day non-compensable time extension to complete necessary modifications to the Project�s water main interconnections. The additional work includes revising the northern interconnection to improve system reliability and future maintenance access and adding valves, piping, manholes, specialty fittings, protective gaskets, and environmental safeguards. The Change Order also provides additional time needed to complete the design of a new 36-inch water main interconnection that will provide system redundancy, reduce the risk of service interruptions, and support future improvements. The Project is comprised of a new 54-in diameter pipe that has been certified by DERM and placed into service. The remaining work consists of pavement restoration, which is being coordinated with the City of Hialeah to account for the City�s ongoing project in the area. Therefore, a subsequent time-only Contract closeout Change Order will be brought to the Board for approval that will extend the Final Completion Date to January 2027. This Project is integral to the Water and Sewer Department�s (WASD) ongoing efforts to upgrade and modernize the County�s water and wastewater infrastructure by replacing aging systems and supporting future growth and redevelopment. These efforts help ensure the continued delivery of efficient and reliable service to our nearly 3 million residents throughout the County. Recommendation It is recommended that the Board ratify Change Order No. 1 to the Contract. Change Order No. 1 increases the Contract by $2,000,000.00 and grants a 106-calendar day non-compensable time extension. A copy of Change Order No. 1 is attached hereto as Exhibit A. Basic details about the Project are set forth on Exhibit B attached hereto. Scope The Project extends from WASD�s JEPWTP to West 53rd Street, along Commission District 6 and Commission District 13, represented by Commissioner Natalie Milian Orbis and Senator Rene Garcia, respectively. Delegation of Authority The Contract was awarded pursuant to Section 2-8.2.12 of the Code of Miami-Dade County, Florida (WASD�s Acceleration Ordinance), which delegates authority to the County Mayor or County Mayor�s designee to execute change orders that do not exceed ten percent of the base contract amount, subject to ratification by the Board. Fiscal Impact/Funding Source The additional fiscal impact of Change Order No. 1 to the County is a net increase of $2,000,000.00 to the Contract and will be funded out of WASD Revenue Bonds Sold and Future WASD Revenue Bonds. There is no impact to the General Fund. The Project is in WASD�s Fiscal Year 2026-2027 Proposed Budget and Multi-Year Capital Plan under North Region Water Transmission Mains � Infrastructure Improvements, Program #9654031, Volume #3, Page #127. Track Record/Monitoring WASD�s Deputy Director of Planning, Regulatory Compliance and Capital Infrastructure, Marisela Aranguiz-Cueto, P.E., will oversee the implementation of Change Order No. 1 to the Contract. Background The Contract was awarded by the Board to the Contractor on April 5, 2022, via Resolution No. R-326-22. The total Contract award was $24,309,622.34, with a Contract duration of 1,095 calendar days for Final Completion and a Contingency Time Allowance of 119 calendar days. The Notice to Proceed was dated May 11, 2022, which established May 10, 2025 as the Contract�s Substantial Completion Date and August 13, 2025 as the Contract�s Final Completion Date. WASD granted 119 days through the Contract�s Contingency Time Allowance, which revised the Substantial Completion Date to September 6, 2025 and the Final Completion Date to December 10, 2025. On January 21, 2026, the Board approved a settlement agreement regarding a material price escalation claim for the Contract via Resolution No. R-47-26. The settlement amount of $5,089,185.35 increased the total Contract value from $24,309,622.34 to $29,398,807.69. Change Order No. 1 will increase the Contract by 2,000,000.00 for a total Contract amount of $31,398,807.69. Change Order No. 1 further grants a 106-calendar day non-compensable time extension, thereby extending the Contract�s Substantial Completion Date from September 6, 2025 to December 21, 2025, and the Contract�s Final Completion Date from December 10, 2025 to March 26, 2026. The additional time and monies being added through this Change Order are needed to address two issues that arose on the Project. Revised North Interconnection & Use of EPDM Gaskets � $2,000,000.00, 45-calendar day non-compensable time extension During the design phase, WASD requested revisions to the northern interconnection between the existing system and the new 54-inch main at the intersection of West 53rd Street and West 4th Avenue. The revised configuration includes three (3) additional 54-inch butterfly valves, additional restrained 54-inch pipe, three (3) new access manholes, and a change in connection material from Ductile Iron Pipe (DIP) to Prestressed Concrete Cylinder Pipe (PCCP). These modifications enhance system reliability and provide improved access for future maintenance and condition assessments. In addition, an environmental due diligence review identified the presence of free-floating petroleum product at the gas station located at West 4th Avenue and West 51st Place (UT-659). As a result, protective measures, including the use of Viton gaskets and clean fill, were added to the Project to safeguard the pipeline from potential environmental impacts. The additional work, not included in the original Design Criteria Package but necessary to deliver a complete and reliable final product, includes installation of over 120 feet of 54-inch DIP, removal and disposal of existing 54-inch PCCP, verification of existing utilities, installation of shoring and dewatering systems, installation of bulkheads to prevent cross-contamination during construction and testing, furnishing and installing three (3) additional butterfly valves with associated vaults and access manholes, valve testing, and installing required specialty fittings (flange adapters) and Ethylene Propylene Diene Monomer (EPDM) gaskets. Modifications to the interconnection between the new pipeline and the existing 54-inch main, including the installation of EPDM gaskets, required an additional 45 calendar days to complete. The total cost associated with this additional work is $2,000,000.00. 36-inch Water Main Interconnection � 61-calendar day non-compensable time extension During the initial phases of design, WASD determined that the proposed 36-inch interconnection, from the intersection of West 29th Street and West 4th Avenue to West 6th Avenue, is essential to achieving full redundancy in the water distribution system. Without this interconnection, the system would lack the redundancy necessary to ensure a reliable and uninterrupted water supply. The addition of this interconnection provides a backup source during emergencies, maintenance activities, or unforeseen events, thereby reducing the risk of service interruptions and protecting public health and safety. Furthermore, this segment will support the Department�s ability to implement future large-scale system improvements in a timely and efficient manner. The design cost of $186,314.29 was paid through the Contract�s Design Contingency Allowance. The design change required a total of 180 additional days. WASD previously granted 119 days through the Contract�s Contingency Time Allowance, which revised the Substantial Completion Date to September 6, 2025 and the Final Completion Date to December 10, 2025. Change Order No. 1 grants the remaining 61 calendar days. Small Business Enterprise Measures On June 5, 2026, the Strategic Procurement Department (SPD) reviewed the Contract for compliance with Resolution No. R-1001-15. Resolution No. R-1001-15 requires County contracts with small business measures to meet at least 85 percent of the small business measures applicable to the portion of the contract work performed to date before a change order or contract amendment is considered for Board approval. The Contract was awarded with the following Small Business Enterprise (SBE) goals: 24 percent SBE-Architectural and Engineering (SBE-AE), 10.04 percent SBE-Construction (SBE-Con), and .5 percent SBE-Goods. The Contractor has met the SBE-AE and SBE-Goods goals. However, the Contractor is not in compliance with Resolution No. R-1001-15 as it relates to the SBE-Con goal. The Contractor�s current SBE-Con utilization is equal to $129,259 or 0.66% and the measure is supposed to be 10.04%. In correspondence dated April 14, 2026, the Contractor reported one SBE-Con firm was unavailable to perform and another increased its prices due to escalation in material costs. The Contractor did not notify the County in 2023 and 2024 when these issues occurred and did not follow the required SBE-Con substitution procedures outlined in the SBE-Con Program, Section 10-33.02 of the Code. A letter from the Contractor explaining why the measures have not been met is attached hereto as Exhibit C. The SBE-Con utilization deficit will be addressed with the Contractor through the compliance process specified in Code, which provides firms with an opportunity to appeal any determination of noncompliance. Attachments ______________________________________ Roy Coley Deputy Mayor |
|
Home |
Agendas |
Minutes |
Legislative Search |
Lobbyist Registration |
Legislative Reports
Home | Using Our Site | About | Phone Directory | Privacy | Disclaimer
E-mail your comments,
questions and suggestions to
Webmaster
|