Roadway Construction Report for the week of August 1, 2022 – August 7, 2022

MIAMI ( July 29, 2022 )

The following is a list of roadway construction/closure activities for the week of August 1, 2022 – August 7, 2022.

SW 137 Ave. from US-1 to SW 200 St. – Project No. 20180089 (Miami-Dade Commission District 8): Work consists of a new two lane roadway which will include, but is not limited to: sidewalks (for a portion of the project), curb and gutters, a continuous storm drainage system, signalization, pavement markings and signage, standard roadway lighting system, bicycle facilities, landscaping, a bridge crossing over Canal C-102, a culvert crossing at Canal C-102N, and the filling of the borrow pit at SW 240 Street within the right-of-way limits. Construction is anticipated to be completed by October 2022. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Bridge Replacement at North Miami Avenue over Litter River Canal-Project No. 20160165 (Miami-Dade Commission District 3): Work includes but is not limited to the bridge replacement project is located along SW North Miami Avenue from NW 85 Street to NW 86 Street. The proposed project consists of replacing the bridge currently spanning the Little River Canal along North Miami Avenue, within Miami-Dade County, the City of Miami and the Village of El Portal, with a new bridge that will improve pedestrian facilities. The existing bridge will be replaced entirely with a new concrete bridge that provides 6-foot-wide raised concrete sidewalks on both sides while maintaining two lanes of traffic in each direction.  Construction is anticipated to be completed by March 2023. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Malibu Way/NE 34 Ter. & SW 312 St. Project No. 202000150 WO# 8 (Miami-Dade Commission District 8): Traffic Signal Installation; Work includes, but is not limited to, the construction and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter. Project began March 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Edison Park K-8 Center at 500 NW 67 St.  Project # 20190263 (FM # 438165-1) WO#2 (Miami-Dade Commission District 2): This project has been initiated to improve the traffic signalization conditions. The purpose of this work is to enable and encourage students in grades K-8 to walk and or bicycle to and from school to make walking and bicycling to school safer and more appealing, and to facilitate the planning, development, and implementation of projects that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools and includes  the Install new concrete for sidewalk and ramps, improving of traffic signals installation of school sings and striping.  Project began March 2021 and is anticipated to be completed by July 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Miami Ave. from SE 1 St. to NE  11 Ter. – SE 1 Ave. from SE 1 St. to NE 11 St. – NW 5 St. and NW 6 St. from NW 3 Ave. to NE 2 Ave. – Project No. 20200140 Improvement to Downtown Mobility Network (Miami-Dade Commission Districts 3 & 5): The scope of work includes milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by July 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Sweetwater Elementary School Project No. 20190257 (FM # 438147-1) WO#4 (Miami-Dade Commission District 12): This project has been initiated to improve the traffic signalization conditions. The purpose of this work is to enable and encourage students in grades K-8 to walk and or bicycle to and from school to make walking and bicycling to school safer and more appealing, and to facilitate the planning, development, and implementation of projects that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools and includes  the Install new concrete for sidewalk and ramps, improving of traffic signals installation of school sings and striping.  This work will start by the begging of June 2021 and is anticipated to be completed by July 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 79 Ave. & NW 56 St. Project No. 20200149 WO#19 (Miami-Dade Commission District 12): Traffic Signal Installation; Work includes, but is not limited to, the construction and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter. This work started by the beginning of August 2021 and is anticipated to be completed by July 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 97 Ave. And SW 120 St. (Intersection Improvements) – Project No. 20200255-R (Miami-Dade Commission District 8): The project consists in the improvement of Traffic Circle located at SW 97 Ave and SW 120 Street, including clearing and grubbing; improving the geometry of the NE corner on the existing Traffic Circle; installing new pedestrian crossing; drainage installation; refurbishing pavement including milling; resurfacing; pavement markings; sodding; installation of two Warning Flashers and upgrading lighting at the Traffic Circle, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by October 2022. 

Miami Ave & N 20 St. - Project No. 20200149 WO # 22 (Miami-Dade Commission District 3): Traffic Signal Installation; Work includes, but is not limited to, the construction and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by the beginning of November 2021 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 11 St. and NW 30 Ave. (Intersection Improvements) – Project No. 20200031 WO #1 (Miami-Dade Commission District 5): The scope of work consists of construction of Traffic Circle to improve traffic conditions at the intersection and is not limited to, clearing and grubbing, Traffic Circle construction, drainage installation, construction of new curb and gutter and sidewalks, pedestrian ramps and connectors, milling and resurfacing, adjustment of manholes and valves, signage and pavement markings installation, sodding, as well as any ancillary items associated with the project scope of work. Construction is anticipated to be completed by July 2022.

NW 97th Ave. from NW 58th St. to NW 70th St.- Project No. 20200117 (Miami-Dade Commission Districts 12): Work consists of widening the existing roadway from two (2) lanes to a four (4) lane divided roadway. Work also includes, but is not limited to sidewalks, curb and gutters, bike lanes, continuous storm drainage system, pavement markings and signage, signalization, lighting and landscaping. Construction is anticipated to be completed by May 2023. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 18 Ave from 62 St. to NW 71 St. – Project No. 20200296 (Miami-Dade Commission District 3): Work includes but is not limited to the construction and installation of drainage structures, French drains, regrade existing swale, miscellaneous drainage improvements, grading, sodding, and miscellaneous roadway restoration including construction of concrete curb and gutters, pavement marking and sidewalks where needed in accordance with the construction plans and specifications and Installation of a Water Main. Construction is anticipated to be completed by November 2022.  Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Bayshore Dr & Atlaka St. /Mercy Way.  Project No. 20200150 WO # 3 (Miami-Dade Commission District 7): Traffic Signal Installation; Work includes, but is not limited to, the re construction of the existing span wire and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Miller Dr. & SW 62 Av. Project No. 20210088 WO # 1 (Miami-Dade Commission District 7): Traffic Signal Installation; Work includes, but is not limited to, the re construction of the existing span wire and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Ludlam Rd. & Sunset Dr. Project No. 20210086 WO # 2 (Miami-Dade Commission District 7): Traffic Signal Installation; Work includes, but is not limited to, the re construction of the existing span wire and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 97 Av. (W 36 St.) & NW 146 St (W 92 St.) Project No. 20210087 WO # 3 (Miami-Dade Commission District 12): Traffic Signal Installation; Work includes, but is not limited to, the installation of traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour.

NW 37 Av. & NW 153 St.  Project No. 20210089-R WO # 1 (Miami-Dade Commission District 1): Traffic Signal Installation; Work includes, but is not limited to, the installation of traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by September 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NE 2 Av. & NE 199 St. Project No. 20210087 WO # 2 (Miami-Dade Commission District 1): Traffic Signal Installation; Work includes, but is not limited to, the re construction of the existing span wire and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by September 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 107 Av. & NW 27 St. PN 20200149 WO # 27 (Miami-Dade Commission District 12): Traffic Signal Installation; Work includes, but is not limited to, the modification of the existing traffic signal intersection, relocation of existing mast arm, installation of traffic signal head, pedestrian head, installation of loops and controller modification. This work started January 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

W 16 Av & W 37 St. Project # 20210089-R, WO # 2 (Miami-Dade Commission District 13): Modification at the existing Traffic Signal; Work includes, but is not limited to, adding Pedestrian features and installation of, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, traffic signal heads, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, construction of sidewalks, curb and gutter. This work started by February 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 5 Av. & NW 95 St. Project No. 20210087 WO # 4 (Miami-Dade Commission District 3): Traffic Signal Installation; Work includes, but is not limited to, the re construction of the existing span wire and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by January 2022 and is anticipated to be completed by September 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 344 Street/Palm Drive and SE 13 Avenue/Valencia Gardens Dr. Project No. 20200150 WO # 22 (Miami-Dade Commission District 9): Traffic Signal Installation; Work includes, but is not limited to, the construction and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway works. This work started by the end of September 2021 and is anticipated to be completed by August 2022 Motorists are advised to seek an alternate route or follow the posted maintenance of traffic.

NW 87 Av & NW 54 St. P# 20210087 WO # 1 (Miami-Dade District 12): Traffic Signal Installation; Work includes, but is not limited to, the re construction of the existing span wire and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter and roadway works. This work started by end of February 2022 and is anticipated to be completed by October 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 58 St. from NW 97 Ave. to SR-826- Project No. 20200098 (Miami-Dade Commission District 12): Work consists of reconstruction of the existing road to a 4-lane roadway with a continuous center turning lane. The scope of work includes, but is not limited to sidewalks, curb and gutters, bike lanes, continues storm drainage system, culverts, pavement markings and signage, upgraded traffic signalization, and roadway lighting. Construction is anticipated to be completed by December 2023. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 25 St. And NW 112 Ave. (Intersection Improvements) – Project No. 20210015 WO #2 (Miami-Dade Commission District 12): The scope of work includes, but is not limited to, clearing and grubbing, remove existing curb and gutter, widening, installation of new curb and gutter, milling and resurfacing, installation of pavement markings and sodding. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route. Construction is anticipated to be completed by August 2022.

SW 107 Ave. And SW 176 St. (Intersection Improvements) – Project No. 20200231 WO #4 (Miami-Dade Commission District 9): The scope of work includes, but is not limited to, clearing and grubbing, drainage installation, construction of Traffic Circle, installation of curb and gutter and sidewalks, milling and resurfacing, adjustment of valves, installation of pavement markings, signage, and sodding. Construction is anticipated to be completed by August 2022.

SW 162 Ave. from Bird Road to Kendall Dr. (Intersection Improvements) – Project No. 20200231 WO #5 (Miami-Dade Commission District 11): The scope of work includes, but is not limited to, clearing and grubbing, installation of Concrete Medians, milling and resurfacing, adjustment of valves, installation of pavement markings and sodding. Construction is anticipated to be completed by September 2022.

ADA Ramps And Connectors at Lakes of the Meadows. (Intersection Improvements) – Project No. 20190236 WO #13 (Miami-Dade Commission District 11): The project is located at the following intersections: W Meadow Lake Dr and SW 47th Street, E Meadow Lake Dr and SW 47th Street, and E Meadow Lake Dr and SW 152nd Avenue within Miami-Dade County Commission District 11. This project has been initiated to construct ADA Ramps and Connectors. The scope of work includes, but is not limited to, clearing and grubbing, remove existing curb and gutter, installation of new curb and gutter, sidewalks, pedestrian ramps, and connectors, milling and resurfacing, installation of pavement markings and sodding. Construction is anticipated to be completed by June 2022.

SW 17 St. from SW 104 Ct. to SW 104 Ave. – Project No. 20210002 Work Order #3 (Miami-Dade Commission District 10):  Work includes, but is not limited to, the construction and installation of drainage structures, French drains, swale blocks, miscellaneous drainage improvements, grading, sodding and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by July 2022. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 162 Av. & SW 320 St.  Project No. 20210086 WO # 1 (Miami-Dade Commission District 8): Traffic Signal Installation; Work includes, but is not limited to, the installation of traffic controller, assembly, ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter. This work started by April 2022 and is anticipated to be completed by November 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NE 207 Ter. from NE 9 Ct. to NE 9 Pl. & NE 205 St. from NE 8 Ct. to NE 9 Pl. & NE 8 Ct. from NE 205 St. to NE 205 Ter.- Project No. 20200277 WO# 6 (Miami-Dade Commission District 1): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, Manatee Gates, swale blocks, miscellaneous drainage improvements, grading, sodding and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by August 2022. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 22 Ave And NW 7 St. (Intersection Improvements) – Project No. 20210015 WO# 5 (Miami-Dade Commission District 13): The scope of work includes, but is not limited to, clearing and grubbing, remove existing curb and gutter, installation of new curb and gutter and pedestrian ramps, milling and resurfacing, installation of pavement markings and signage. Construction is anticipated to be completed by August 2022.

NW 170 St. from NW 97 Ave. to W 35 Ct. (Intersection Improvements) – Project No. 20210015 WO# 11 (Miami-Dade Commission District 13): The scope of work includes, but is not limited to, clearing and grubbing, remove existing curb and gutter, milling and resurfacing, installation of pavement markings and signage. Construction is anticipated to be completed by August 2022.

NW 199 St. from NW 2 Ave. to NW 14 Ct.  – Project No. 20210056 WO #1 (Miami-Dade Commission District 1): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 170 St. from NW 77 Ct. to NW 87 Ave.  – Project No. 20210190 WO #2 (Miami-Dade Commission District 13): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 199 St. from NW 37 Ave. to NW 47 Ave.  – Project No. 20200096 WO #10 (Miami-Dade Commission District 1): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 79 Place & NW 80 St. – Project No. 20210087 WO # 6 (Miami-Dade Commission District 12): New Traffic Signal Installation. Work includes, but is not limited to, the construction and installation of mast arms assemblies, traffic controller, assembly , ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter, milling, resurfacing and roadway work. This work started In April 2022 and is anticipated to be completed by October 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 48 St. from NW 57 Ave. to Lincoln Rd. – Project No. 20200097 WO # 8 (Miami-Dade Commission District 12): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 147 Ave. And SW 67 Ln. (Intersection Improvements) – Project No. 20190236 WO# 14 (Miami-Dade Commission District 11): The scope of work includes, but is not limited to, clearing and grubbing, remove existing curb and gutter, widening, installation of new curb and gutter, sidewalks, pedestrian ramps, and connectors, milling and resurfacing, installation of pavement markings and sodding. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 27 St. And NW 27 Ave. (Intersection Improvements) – Project No. 20210015 WO# 4 (Miami-Dade Commission District 12): The scope of work includes, but is not limited to, clearing and grubbing, remove existing curb and gutter and sidewalks, widening, installation of new curb and gutter, sidewalks, and connectors, milling and resurfacing, installation of pavement markings and sodding. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

W Flagler St. & W 99 Ct.  Project No. 20210089-R WO # 7. (Miami-Dade District District 10): Traffic Signal Installation; Work includes, but is not limited to, the installation of traffic controller, assembly, ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter.  This work started by June 2022 and is anticipated to be completed by December 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 92 Ave. from Bird Road to Miller Dr. – Project No. 20200203 WO # 7 (Miami-Dade Commission District 10): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NE 12 Ave. from NE 143 St. to NE 149 St. – Project No. 20210190 WO # 1 (Miami-Dade Commission District 2): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 98 Ave. & NW 17 St.  Project No. 20210089-R WO # 5 (Miami-Dade Commission District 12): Traffic Signal Installation: Work includes, but is not limited to, the installation of traffic controller, assembly, ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter. This work started in June 2022 and is anticipated to be completed by December 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 112 St. from SW 130 AVE to SW 129 Place – Project No. 20210002 Work Order # 4 (Miami-Dade Commission District 7): Work includes, but is not limited to, the construction and installation of drainage structures, French drains, swale blocks, miscellaneous drainage improvements, grading, sodding and roadway restoration, including construction of concrete curb and gutters, and sidewalks where needed, in accordance with the construction plans and specifications. Construction is anticipated to be completed by July 2022. Mainline Closure: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Robert R. Moton Elementary School, 18050 Homestead Avenue. PN 20210082 (FM # 439896-1) WO # 2 (Miami-Dade County Commission District 9): This project has been initiated to install traffic calming signs, crosswalk, school zone signs, ramps and removal and installation of sidewalks. The purpose of this work is to enable and encourage students in grades K-8 to walk and/or bike to and from school to make walking and biking to school safer and more appealing. The work will facilitate the planning, development, and implementation of projects that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools and includes the Install new concrete for sidewalk and ramps, improving of traffic signals installation of school sings and striping. This work will start by the end of June 2022 and is anticipated to be completed by March 2023. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 112 Ave. & NW 7 St. PN 20210087 – WO #10 (Miami-Dade County Commission District 12): New Traffic Signal Installation; Work includes, but is not limited to, the installation of traffic controller, assembly, ground electrodes, conduits, pull boxes, foundations, pedestrian signal heads with push buttons and signs, overhead signs, traffic signal heads, internally illuminated street name signs, loop assemblies, signal cables, sidewalk and ramps, any ancillary work including, handicap ramps, ground mounted signs, pavement markings, construction of sidewalks, curb and gutter,. This work started on June 30, 2022 and is anticipated to be completed by December 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Florida City Elementary School, 364 NW 6 Av. Florida City. PN 20210082 (FM # 439896-1) WO # 1 (Miami-Dade County Commission District 8): This project has been initiated to install traffic calming signs, crosswalk, school zone signs, ramps and removal and installation of sidewalks. The purpose of this work is to enable and encourage students in grades K-8 to walk and/or bike to and from school to make walking and biking to school safer and more appealing. The work will facilitate the planning, development, and implementation of projects that will improve safety and reduce traffic, fuel consumption, and air pollution in the vicinity of schools and includes the Install new concrete for sidewalk and ramps, improving of traffic signals installation of school sings and striping. This work will start by the beginning of July 2022 and is anticipated to be completed by April 2023. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 107 Ave. from NW 138 St. to Okeechobee Rd. – Project No. 20210056 WO # 4 (Miami-Dade Commission District 12): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by October 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 57 Ave. from SW 80 St. to SW 88 St. – Project No. 2021057 WO # 2 (Miami-Dade Commission District 7): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 95 St from NW 3 Ave. to NW 6 Ave. – Project No. 20200203 WO # 6 (Miami-Dade Commission District 3): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Ingraham Hwy. from SW 37 Ave. to SW 42 Ave. – Project No. 20210191 WO # 2 (Miami-Dade Commission District 7): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by October 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 57 Ave. from SW 80 St. to SW 88 St. – Project No. 2021057 WO # 2 (Miami-Dade Commission District 7): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 48 St. from NW 57 Ave. to Lincoln Rd. – Project No. 20200097 WO # 8 (Miami-Dade Commission District 12): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by August 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 25 St. & NW 112 Ave. Project No. 20210087 WO # 11 (Miami-Dade Commission District 12): Traffic signal installation work includes, but is not limited to, relocation of pedestrian signal heads, installation of 8 loop assemblies, signal cables. This work started by June 2022 and is anticipated to be completed by August 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 147 Av. & SW 120 St. PN 20210088 WO # 3. (Miami-Dade Commission District 11): Traffic Signal Installation, work includes, but is not limited to the modification of the existing traffic signal intersection, installation of traffic signal head, pedestrian signal head, installation of new FPL service disconnect and controller modification. This work started on July 2022 and is anticipated to be completed by October 2022 Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

W 24 Av. & W 68 St. PN 20210089-R WO # 6 (Miami-Dade Commission District 12): Traffic Signal Installation, work includes, but is not limited to the modification of the existing traffic signal intersection, relocation of existing mast arm, installation of traffic signal head, pedestrian signal head, installation of loops, thermoplastic striping, and controller modification. This work started by July 2022 and is anticipated to be completed by October 2022 Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 82 AV & NW 162 ST Project No. 20210087 WO # 12 (Miami-Dade Commission District 13): Traffic Signal modification. work includes, but is not limited to; furnish, and install pull boxes, foundations, signal cables, mounting hardware, conduit using directional boring or as directed by Project Manager if needed, relocation of pedestrian signal heads, installation of 3 loop assemblies, signal cables. This work will start by August 2022 and is anticipated to be completed by November 2022. Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 33 St. from SW 57 Ave. to SW 67 Ave. – Project No. 20210190 WO # 3 (Miami-Dade Commission District 6): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 37 Ave. from Ingraham Hwy. to US-1. – Project No. 20200203 WO # 5 (Miami-Dade Commission District 7): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

SW 57 Ave. from SW 80 St to SW 88 St. – Project No. 20210057 WO # 2 (Miami-Dade Commission District 7): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

NW 154 St. from Okeechobee Rd. to NW 122 Ave. And NW 122 Ave. from NW 154 St to NW 169 St. – Project No. 20210057 WO # 4 (Miami-Dade Commission District 12): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by September 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

Hialeah Gardens Blvd. from W 68 St. to W 84 St. – Project No. 20210056 WO #3 (Miami-Dade Commission District 12): The scope of work includes the following: milling and resurfacing, construction of ADA ramps and connectors, adjustment of valve boxes and manholes, pavement markings and signage. Construction is anticipated to be completed by October 2022. Detour: Motorists are advised to seek an alternate route or follow the posted maintenance of traffic (MOT) signs or detour route.

 

PLEASE DON'T TEXT AND DRIVE!