1 MINUTES PREPARED BY:  
  REPORT: Selena Hadley, Commission Reporter
(305) 375-1475
 
1A INVOCATION AS PROVIDED IN RULE 5.05 (H)  
  REPORT: Commissioner Gilbert III led the invocation.  
1B ROLL CALL  
  REPORT: Chairwoman Cohen Higgins called the Aviation and Seaport Committee (ASC) meeting to order at 10:40 a.m.

In addition to committee members, the following staff members were present:
~ Mr. Jimmy Morales, Chief Operating Officer, Office of the Mayor;
~ Assistant County Attorneys (ACA) Ryan Zagare and David Murray;
~ Mr. Ralph Cutie Director, Miami-Dade Aviation Department (MDAD);
~ Ms. Namita Uppal, Director, Strategic Procurement Department (SPD); and
~ Deputy Clerks Selena Hadley and Mr. Israel Alonso, Clerk of the Board (COB).

MOTION TO SET THE AGENDA
ACA Ryan Zagare advised that Chairwoman Cohen Higgins had been listed as the prime sponsor for Agenda Item 3G, and the administration had requested the item be deferred to the June 8, 2026 ASC meeting.

Commissioner Gilbert III moved that the committee approve today�s agenda, with the aforementioned changes. This motion was seconded by Commissioner Milian Orbis, and upon being put to a vote, passed 4-0 (Vice Chairman Gonzalez was absent).

Following discussions and the vote related to Agenda Item 3I, Commissioner Gilbert III moved to simultaneously consider the remaining agenda items (Agenda Items 3A � 3F, 3H and 7A This motion was seconded by Commissioner Milian Orbis, and upon being put to a vote, passed 5-0.

Note: Agenda Items 3A, 3B, 3C, 3D, 3E, 3F, and 3H were forwarded to the Board of County Commissioners (Board) with a favorable recommendation; and Agenda Item 7A was received by the Committee.
 
1C PLEDGE OF ALLEGIANCE  
  REPORT: In addition to committee members, the following staff members were present:  
1D REASONABLE OPPORTUNITY FOR THE PUBLIC TO BE HEARD AS PROVIDED IN RULE 6.06  
  REPORT: Chairwoman Cohen Higgins opened the reasonable opportunity to be heard; and the following person appeared before the committee:

Jorge Lopez, 2665 South Bayshore Drive, Miami, Florida appeared on behalf of Basketball Properties, and spoke in support of deferring Agenda Item 3G as recommended by staff.

Seeing no one else come forward to speak, Chairwoman Cohen Higgins closed the reasonable opportunity to be heard.
 
1E SPECIAL PRESENTATION(S)  
1E1  
  260825 Presentation     Danielle Cohen Higgins        
  MIA RUNWAY 5K 2025 SERIES - DONATION CHECK PRESENTATION TO MAKING STRIDES AGAINST BREAST CANCER Presented
1F DISCUSSION ITEM(S)  
1G PUBLIC HEARING(S)  
2 COUNTY COMMISSION  
3 DEPARTMENT(S)  
3A  
  260675 Resolution     Aviation Department
  RESOLUTION APPROVING A CONTRACT BETWEEN MIAMI-DADE COUNTY AND PROFESSIONAL SERVICE INDUSTRIES, INC. AS PART OF A POOL OF ARCHITECTURAL AND ENGINEERING CONSULTANTS TO PROVIDE PROFESSIONAL CONSTRUCTION MATERIALS TESTING SERVICES FOR THE MIAMI-DADE AVIATION DEPARTMENT AT MIAMI INTERNATIONAL AIRPORT, CONTRACT NO. E24AV03A, IN A COMBINED MAXIMUM AMOUNT OF $41,353,125.00 FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR RENEWAL OPTION; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME, AND TO EXERCISE THE PROVISIONS THEREOF, INCLUDING TERMINATION Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
3B  
  260676 Resolution     Aviation Department
  RESOLUTION APPROVING A CONTRACT BETWEEN MIAMI-DADE COUNTY AND NV5, INC. AS PART OF A POOL OF ARCHITECTURAL AND ENGINEERING CONSULTANTS TO PROVIDE PROFESSIONAL CONSTRUCTION MATERIALS TESTING SERVICES FOR THE MIAMI-DADE AVIATION DEPARTMENT AT MIAMI INTERNATIONAL AIRPORT, CONTRACT NO. E24AV03C, IN A COMBINED MAXIMUM AMOUNT OF $41,353,125.00 FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR RENEWAL OPTION; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME, AND TO EXERCISE THE PROVISIONS THEREOF, INCLUDING TERMINATION Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
3C  
  260677 Resolution     Aviation Department
  RESOLUTION APPROVING A CONTRACT BETWEEN MIAMI-DADE COUNTY AND BLASCOM ENGINEERING, INC. AS PART OF A POOL OF ARCHITECTURAL AND ENGINEERING CONSULTANTS TO PROVIDE PROFESSIONAL CONSTRUCTION MATERIALS TESTING SERVICES FOR THE MIAMI-DADE AVIATION DEPARTMENT AT MIAMI INTERNATIONAL AIRPORT, CONTRACT NO. E24AV03D, IN A COMBINED MAXIMUM AMOUNT OF $41,353,125.00 FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR RENEWAL OPTION; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME, AND TO EXERCISE THE PROVISIONS THEREOF, INCLUDING TERMINATION Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
3D  
  260678 Resolution     Aviation Department
  RESOLUTION APPROVING A CONTRACT BETWEEN MIAMI-DADE COUNTY AND TERRACON CONSULTANTS, INC. AS PART OF A POOL OF ARCHITECTURAL AND ENGINEERING CONSULTANTS TO PROVIDE PROFESSIONAL CONSTRUCTION MATERIALS TESTING SERVICES FOR THE MIAMI-DADE AVIATION DEPARTMENT AT MIAMI INTERNATIONAL AIRPORT, CONTRACT NO. E24AV03B, IN A COMBINED MAXIMUM AMOUNT OF $41,353,125.00 FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR RENEWAL OPTION; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME, AND TO EXERCISE THE PROVISIONS THEREOF, INCLUDING TERMINATION Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
3E  
  260679 Resolution     Aviation Department
  RESOLUTION APPROVING A CONTRACT BETWEEN MIAMI-DADE COUNTY AND WINGERTER LABORATORIES, INC. AS PART OF A POOL OF ARCHITECTURAL AND ENGINEERING CONSULTANTS TO PROVIDE PROFESSIONAL CONSTRUCTION MATERIALS TESTING SERVICES FOR THE MIAMI-DADE AVIATION DEPARTMENT AT MIAMI INTERNATIONAL AIRPORT, CONTRACT NO. E24AV03E, IN A COMBINED MAXIMUM AMOUNT OF $41,353,125.00 FOR A TERM OF FIVE YEARS WITH ONE FIVE-YEAR RENEWAL OPTION; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME, AND TO EXERCISE THE PROVISIONS THEREOF, INCLUDING TERMINATION Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
3F  
  260747 Resolution     Aviation Department
  RESOLUTION APPROVING CONTRACT MIAMI INTERNATIONAL AIRPORT TERMINAL WIDE RE-ROOFING AND LIGHTNING SYSTEM UPGRADES PROJECT NO. AA078A BETWEEN MIAMI-DADE COUNTY AND LEGO CONSTRUCTION CO. IN AN AMOUNT NOT TO EXCEED $125,703,562.22; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME, AND TO EXERCISE THE PROVISIONS THEREOF, INCLUDING TERMINATION Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
  REPORT: Commissioner Milian Orbis asked whether MDAD was considering solar panels as part of the re-roofing project and the timeframe for the installation.

Mr. Cutie confirmed that solar panels were included and explained that the project would replace approximately 410,000 square feet of roof across four phases over a four-year period. He noted that the panels were intended to save money and reduce the department's electric bill. Mr. Cutie stated that the solar panels would be installed after the roofing work was completed on each individual phase, and added that he could not yet confirm whether the installations would occur within the individual phases or only after all of the roofing was finished.

Mr. Cutie further explained that the solar panels installation was currently limited to the re-roofing project only and reported that the department was looking to expand the solar panel program to the roofs of the Dolphin, Flamingo, and new Ibis parking garages. He anticipated that, once those phases were implemented, the program would make Miami International Airport (MIA) the highest power-generating airport in the state while reducing the department's power consumption, though he qualified that projection as dependent on his figures being correct.

Hearing no further questions or comments, the Committee proceeded to vote on the foregoing proposed resolution along with Agenda Items 3A � 3F, 3H, and 7A as presented.
 
3G  
  260654 Resolution     Danielle Cohen Higgins        
  RESOLUTION AUTHORIZING WAIVER OF COMPETITIVE BIDDING PROCEDURES PURSUANT TO SECTION 5.03(D) OF THE HOME RULE CHARTER AND SECTION 2-8.1(B) OF THE COUNTY CODE BY A TWO-THIRDS VOTE OF THE BOARD MEMBERS PRESENT AND AWARD A NON-COMPETITIVE REVENUE-GENERATING CONTRACT, CONTRACT NO. BW-10479, AIRBALL SPORTS II, LLC LEASE AND CONCESSION AGREEMENT, TO AIRBALL SPORTS II, LLC WITH PROJECTED REVENUE OF $17,000,000.00 FOR AN EIGHT-YEAR TERM WITH ONE, TWO-YEAR OPTION TO RENEW FOR THE MIAMI-DADE AVIATION DEPARTMENT; AND AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXERCISE ALL PROVISIONS OF THE CONTRACT, INCLUDING ANY CANCELLATION, RENEWAL OR EXTENSIONS, PURSUANT TO SECTION 2-8.1(B) OF THE CODE OF MIAMI- DADE COUNTY, FLORIDA AND IMPLEMENTING ORDER 3- 38 Deferred to June 8, 2026
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 4 - 0
Absent: Gonzalez
  REPORT: The foregoing proposed resolution was deferred to June 8, 2026 ASC meeting with the setting of the agenda.

During consideration of Agenda Item 3I, Chairwoman Cohen Higgins requested a status update on the airport's concessionaire program, referencing the pool of prospective businesses established under a prior item and asking whether those firms had been able to bid on new airport spaces.

Mr. Cutie reported that the Board had approved a 15-year extension of many of the airport's concession areas the previous April, which included a three-year implementation phase for the design and refurbishment of those spaces. He explained that the department was fully engaged in the first two phases, with concessions either under design or under construction. Mr. Cutie pointed out that one space had been completed and another was about to begin construction, and that the department expected to enter the third phase on May 23. He noted that a few areas were slightly behind schedule and were expected to recover during the third phase, and that the department was finalizing discussions on marketplace concessions that fell outside the agreement, along with several service contracts.

Mr. Cutie added that the implementation work would not be complete in time for the World Cup but was progressing well, and that the department was also negotiating the pool of 45 firms, with solicitations to follow for spaces expected to become available.
 
3H  
  260694 Resolution     Strategic Procurement
  RESOLUTION RATIFYING EMERGENCY CONTRACT NO. E-10658, CENTRAL CHILLER PLANT CONDENSER WATER REPAIRS (PHASE 1), TO BOTAS ENGINEERING, INC. IN THE AMOUNT OF $305,228.00 FOR THE MIAMI-DADE AVIATION DEPARTMENT; AND AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXERCISE ALL PROVISIONS OF THE CONTRACT, INCLUDING ANY CANCELLATION OR EXTENSIONS, PURSUANT TO SECTION 2-8.1 OF THE COUNTY CODE AND IMPLEMENTING ORDER 3-38 Forwarded to BCC with a favorable recommendation
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
3I  
  260591 Resolution     Danielle Cohen Higgins        
  RESOLUTION APPROVING, PURSUANT TO SECTION 255.04, FLORIDA STATUTES, THE SPECIFICATION OF CERTAIN SOLE SOURCE MATERIALS AND SYSTEMS IN PROCUREMENT DOCUMENTS FOR IDENTIFIED CAPITAL IMPROVEMENT PROGRAM (�CIP�) PROJECTS FOR THE MIAMI-DADE AVIATION DEPARTMENT; SUBJECT TO CERTAIN CONDITION PRECEDENT, AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO ADVERTISE SOLICITATIONS FOR THE SPECIFIED CIP PROJECTS WITH THE SOLE SOURCE MATERIALS AND SYSTEMS AND RATIFYING ADVERTISEMENT OF TWO PENDING SOLICITATIONS WITH THE SOLE SOURCE MATERIALS AND SYSTEMS Forwarded to BCC with a favorable recommendation
Mover: Danielle Cohen Higgins
Seconder: Oliver G. Gilbert, III
Vote: 4 - 1
No: Gilbert, III
  REPORT: Chairwoman Cohen Higgins voiced her support for the item but requested clarification on the sole sourcing, efficiencies, and continuity of service concerns she had raised at the previous Board meeting. She asked Mr. Ralph Cuti� to provide a status update outlining the savings the department anticipated.

Mr. Cutie reported that the department had reviewed the more than 208 projects in its approximately $14 billion capital program and identified about 13 with significant long-term sole source components. He named the five most significant as the D60 project, both phases of the Central Terminal redevelopment, and the North Terminal gate optimization and gate infrastructure projects. He advised that the department�s consultant performed a comprehensive analysis of the potential savings and the operational and schedule impacts and noted the analysis projected savings exceeding $302 million, along with additional benefits from avoiding schedule delays and the removal of existing infrastructure to accommodate new systems.

Mr. Cutie explained that the item would allow the administration, under a limited delegation of authority, to specify sole sourced components when advertising the projects listed in the exhibit, while other projects remained open to competition. He characterized the $302 million figure as conservative and cited building management systems, airfield lighting systems, and access control as components that would otherwise require significant infrastructure removal.

Chairwoman Cohen Higgins inquired about MIA�s preparations for the 2026 F�d�ration Internationale de Football Association (FIFA) World Cup.

Mr. Cutie reported that a task force established earlier in the year had advanced beautification work throughout the terminals, including pressure cleaning, painting, striping, and lighting improvements, and that the department was working with the Greater Miami Convention and Visitors Bureau (GMCVB) on murals and LED digital signage. He estimated approximately 1.2 million additional passengers would utilize MIA during the event.

On human trafficking, Mr. Cutie reported that the department continued its longstanding partnership with the State Attorney's Office to place awareness signage in restrooms and throughout the terminals and to rotate related messaging on digital signs.

Addressing Chairwoman Cohen Higgins�s comments about the county's Super Bowl signage, he confirmed the airport would demonstrate a comparable level of commitment.

Commissioner Gilbert III questioned whether the projects were legacy contracts in substance, despite not being labeled as such.

Mr. Cutie responded that the existing airport systems were legacy systems and that the item involved sole source solicitations specifying some of them.

Commissioner Gilbert III referenced his standing concerns about the county's frequent use of legacy awards. He took issue with accepting the administration's savings projections and delegating purchasing discretion to the Mayor, citing its inconsistent delivery record and his reluctance to lock in existing providers without weighing potentially better, less costly alternatives.

Commissioner Hardemon questioned how sole sourcing could produce savings when there was nothing comparable to measure it against.

Mr. Cutie explained that integrating new projects with existing proprietary systems, such as Honeywell's building management and airfield lighting systems, avoided removing and replacing that infrastructure, which produced the savings along with cost reductions from the shortened schedule.

Commissioner Hardemon countered with an analogy to older and newer wiring, observing that newer technology generally required removing the older installation and purchasing both hardware and service.

Mr. Cutie responded that these contracts could require the vendor to keep the county updated with current technology as part of maintenance, citing the existing Honeywell contract as an example.

Responding to Vice Chairman Gonzalez's question about whether the projects had been advertised, Mr. Cutie explained that they had not. He noted that two contracts had been advertised and then placed on hold pending this item, while the remaining projects were listed in Exhibit A. He added that several procurements were still months away, including D60, and that the department's conclusions rested on the consultant's analysis completed within the prior few months

Commissioner Gilbert III stated that the explanation had removed any doubt and confirmed his opposition, since each reference to sole source described what he regarded as legacy projects. He contended that the word legacy had been left out of the title to avoid a strong reaction from the commission, which had been working to move away from legacy awards. He maintained that the projects were not true sole sources, because alternatives existed for each and retention was simply the cheaper option.

Mr. Morales attributed the sole source terminology to the governing Florida statute, explaining that the specification directed contractors to a single source for the particular product while the overall project remained competitively bid. He confirmed that Honeywell was a legacy contract and that the solicitation would require contractors to purchase its parts.

Mr. Cutie added that any new systems installed would also have to integrate with the existing systems.

Commissioner Gilbert III disputed the interpretation, drawing a distinction between going to one source, which he characterized as a directed purchase amounting to a waiver of solicitation, and a genuine sole source, which existed only where no reasonably attainable alternative was available. He noted that the commission had understood the administration's past sole source representations to mean that no alternative existed, and he called the discrepancy a serious matter of trust if the statute set a different standard.

Mr. Morales clarified that the county had committed to particular systems years earlier and that only the original manufacturer could supply the compatible parts and upgrades, which was what rendered those components a sole source.

Commissioner Gilbert III observed that the item went a step further by requiring every bidder to use the specified components. Drawing again on the wiring analogy, he explained that locking all bidders into the existing systems would foreclose any proposal based on newer technology and deny bidders the chance to argue that a more forward-looking option offered better long-term value. He cautioned that each legacy contract reaffirmed existing arrangements and that the request effectively delegated the Board's budgeting and procurement authority. He stated that he would not support the item in committee, though he remained open to further discussion.

Mr. Cutie offered to brief Commissioner Gilbert III individually. He explained that the design documents issued with each solicitation would require the latest technology, that the delegated authority applied to only about 13 of the 208 projects, and that the larger projects included many components open to competition, such as concrete, steel, and roofing. Mr. Cutie noted that the affected legacy systems represented only a portion of a project such as the approximately $1.1 billion D60, and he described the request as a limited authority intended to produce fiscal and schedule benefits.

Commissioner Gilbert III urged the administration to lead future requests with that rationale rather than the sole source designation, and Mr. Cutie confirmed that the cost and schedule justification was accurate.

Chairwoman Cohen Higgins stated that she had reacted similarly when the item was presented for sponsorship and had raised it at the previous Board meeting to remain cautious about extending legacy contracts. She observed that the item referenced legacy systems throughout its fiscal impact section and read a portion into the record, explaining that the legacy systems spanned multiple project boundaries, that assigning a discrete cost to each project for a new terminal-wide system was impractical, and that replacing those systems to accommodate alternative manufacturers would be neither feasible nor economically justified. She cited the key card system as a persuasive example, noting that the item represented the first opportunity in 20 years to build new terminals at Terminal K and D60 and that installing a different system in one terminal from the rest of the airport was not logical, particularly where a properly structured contract required regular updates. She concluded that the outside analysis demonstrated genuine savings and efficiencies, expressed her support, and recommended a briefing for the commissioners before the matter reached the full Board.

Vice Chairman Gonzalez stated that he largely agreed with Chairwoman Cohen Higgins� conclusions and that his earlier question reflected a similar initial impression that the process avoided competitive bidding. He referenced two solicitations in the item, V100A and T012A, which had incorporated proprietary components but lacked the ability to integrate with the airport's systems, prompting bidders to challenge the specifications. He observed that those bidders could not have satisfied the requirements in any event, and he encouraged the administration to lead with a clear statement of the problem and solution, which Mr. Cutie accepted.

Commissioner Gilbert III stated that the statute permitted a sole source determination only after the governing body weighed all available alternatives and where the specification was recommended by an architect or engineer. He maintained that the projects should be considered individually rather than approved together.

At the Chairwoman's request, ACA Murray clarified that the statute used the term sole source and that the item tracked that language for compliance. He explained that legacy contracts were a creation of the Board that did not appear in state law, which accounted for the apparent disconnect, and that a legacy contract was treated as a type of sole source contract even though the statute referred to it as such.

Chairwoman Cohen Higgins reviewed Exhibit A, titled Sole Sourced Materials and Systems, which listed 15 entries with associated legacy contract numbers.

Mr. Cutie confirmed that the numbers identified contracts from prior competitive or legacy procurements, that the item did not extend any of those contracts, and that it instead allowed the specified legacy components to be incorporated into competitive solicitations for the larger projects.

At Commissioner Gilbert�s III request, ACA Murray read the governing statute into the record. It provided that a Board could not specify sole source materials or systems unless the governing body, after considering all available alternatives, determined the specification justifiable based on cost or interchangeability, the specification was recommended by the architect or engineer of record, and the consideration and justification were documented in the project file.

Commissioner Gilbert III cautioned that sole source and legacy should not be treated as interchangeable, since legacy components generally had alternatives while sole sources did not, and he expressed frustration with how the matter had been framed.

Discussion ensued among the Committee members and staff regarding who drafted the item

Chairwoman Cohen Higgins clarified that it was a staff initiative the administration had asked her to sponsor during a briefing, and that she had neither filed a legislative request nor participated in drafting it.

Commissioner Hardemon stated that his concern was whether the research required by the statute had been performed and documented, and that the committee had not received sufficient information to confirm the item aligned with the law.

Mr. Cutie reiterated that the consultant had performed a comprehensive analysis and prepared the cost estimate, that the engineers of record had submitted supporting letters attached to the item as the statute required, and that the due diligence addressed cost, schedule, and engineering considerations. He offered to provide a more detailed report.

Chairwoman Cohen Higgins asked Mr. Cutie to brief all commissioners before the item reached the full Board so that their concerns could be addressed.

Addressing Mr. Morales attempt to add comments related to Exhibit C, Commissioner Gilbert III cautioned on a point of information that additional explanation risked generating more questions, advising that the administration secure the vote and brief members afterward rather than prompt him to argue against the item.

Hearing no further questions or comments, the Committee proceeded to vote on the foregoing proposed resolution, as presented.
 
4 COUNTY MAYOR  
5 COUNTY ATTORNEY  
6 CLERK OF THE BOARD  
7 REPORT(S)  
7A  
  260750 Report     Mayor
  MIAMI-DADE AVIATION DEPARTMENT: AVIATION CAPITAL PROGRAM REPORT � MAY 2026 Report Received
Mover: Oliver G. Gilbert, III
Seconder: Natalie Milian Orbis
Vote: 5 - 0
8 ADJOURNMENT  
  REPORT: There being no further business to come before ASC, the meeting adjourned at 11:38 a.m.  


11/23/2026       Agenda Key: 5509

Home  |   Agendas  |   Minutes  |   Legislative Search  |   Lobbyist Registration  |   Legislative Reports
2026 BCC Meeting Calendar  |   Miami-Dade County Code of Ordinances   |   ADA Notice  |  

Home  |  Using Our Site  |  About  |  Phone Directory  |  Privacy  |  Disclaimer

E-mail your comments, questions and suggestions to Webmaster  

Web Site � 2026 Miami-Dade County.
All rights reserved.