File Number: 261131 File Type: Resolution Status: In Committee
Version: 0 Reference: Control: Transportation Cmte
File Name: CONTRACT AWARD TO HORIZON CONTRACTORS INC. Introduced: 6/22/2026
Requester: Transportation and Public Works Cost: Final Action:
Agenda Date: 9/1/2026 Agenda Item Number: 8N
Notes: Title: RESOLUTION APPROVING THE AWARD OF THE CONTRACT FOR THE CAPITAL PROJECT TITLED ROADWAY IMPROVEMENTS TO NW 58 STREET FROM NW 97 AVENUE TO NW 79 AVENUE, PROJECT NO. 20250068, TO HORIZON CONTRACTORS, INC., FOR A TERM OF 730 CALENDAR DAYS AND A VALUE OF $17,933,304.63, INCLUSIVE OF A CONSTRUCTION CONTINGENCY ALLOWANCE OF $1,618,298.15, AND OTHER ALLOWANCES OF $132,025.00; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR’S DESIGNEE TO EXECUTE SAME AND EXERCISE THE PROVISIONS CONTAINED THEREIN
Indexes: NONE
Sponsors: NONE
Sunset Provision: No Effective Date: Expiration Date:
Registered Lobbyist: None Listed


Legislative History

Acting Body Date Agenda Item Action Sent To Due Date Returned Pass/Fail

County Attorney 6/23/2026 Assigned Bruce Libhaber 6/26/2026

ROY COLEY 6/22/2026 Assigned Office of Agenda Coordination

Office of Agenda Coordination 6/22/2026 Assigned County Attorney 9/1/2026
REPORT: DTPW - Bruce Libhaber - no sponsor - pending July cmte - Attachment: Contract - item has 11 pages

Legislative Text


TITLE
RESOLUTION APPROVING THE AWARD OF THE CONTRACT FOR THE CAPITAL PROJECT TITLED ROADWAY IMPROVEMENTS TO NW 58 STREET FROM NW 97 AVENUE TO NW 79 AVENUE, PROJECT NO. 20250068, TO HORIZON CONTRACTORS, INC., FOR A TERM OF 730 CALENDAR DAYS AND A VALUE OF $17,933,304.63, INCLUSIVE OF A CONSTRUCTION CONTINGENCY ALLOWANCE OF $1,618,298.15, AND OTHER ALLOWANCES OF $132,025.00; AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE SAME AND EXERCISE THE PROVISIONS CONTAINED THEREIN

BODY
WHEREAS, this Board desires to accomplish the purposes outlined in the accompanying memorandum, a copy of which is incorporated herein by reference,

NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MIAMI-DADE COUNTY, FLORIDA, that this Board approves the contract award between Miami-Dade County and Horizon Contractors, Inc., for the roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue in an amount not to exceed $17,933,304.63, inclusive of a construction contingency allowance of $1,618,298.15, and $132,025.00 for other allowances and authorizes the County Mayor or County Mayor�s designee to execute the same and to exercise the provisions contained therein, including termination provisions.

HEADER

Date:

To: Honorable Chairman Anthony Rodr�guez
and Members, Board of County Commissioners

From: Daniella Levine Cava
Mayor

Subject: Contract Award Recommendation in the Amount of $17,933,304.63 to Horizon Contractors, Inc. for Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue

STAFF RECOMMENDATION
EXECUTIVE SUMMARY
The purpose of this item is to gain approval of the Board of County Commissioners (Board) to execute a contract award recommendation for the project titled �Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, Capital Project No. 20250068,� in the amount of $17,933,304.63 to Horizon Contractors, Inc., for a 730-day term. This project is being funded by Mobility Impact Fees.

This project entails the complete reconstruction of the existing roadway along NW 58th Street, an east-west transportation corridor servicing the City of Doral. The improvements will result in a four-lane roadway with continuous center turning lanes, dedicated bike lanes, sidewalks, curbs and gutters, and a modern storm drainage system. Additional enhancements include new pavement markings and signage, upgraded traffic signalization, and roadway lighting. The corridor has experienced significant growth in recent years, and the improvements will ensure adequate mobility along this roadway, which is essential to sustaining this growth, maintaining an acceptable level of service, and supporting the transportation needs of residents, businesses, and visitors within the surrounding communities.

The Department of Transportation and Public Works (DTPW) initially planned to deliver the project as a �design-build;� however, the project was cancelled due to utility conflicts that could not be addressed. Following the contract cancellation, DTPW assumed the design contract and resolved the utility conflicts ahead of this procurement.

RECOMMENDATION
This contract award recommendation is for the project titled �Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue, procured under Capital Project No. 20250068, between Miami-Dade County and Horizon Contractors, Inc., in the amount of $17,933,304.63 for a 730-day term.

SCOPE
The project is located primarily within District 12, which is represented by Commissioner Juan Carlos Bermudez.


PROJECT NAME:
Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue

DTPW PROJECT NO:
20250068

CONTRACT NO:

20250068

PROJECT DESCRIPTION:
The work includes but is not limited to the following: furnishing all supervision, materials, equipment, tools and performing all operations necessary for roadway improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue. The work consists of reconstruction of the existing road to a four-lane roadway with continuous center turning lane, bike lanes, sidewalks, curbs and gutters, storm drainage system, pavement markings and signage, upgraded traffic signalization, and roadway lighting.
PROJECT LOCATION:
District 12, Commissioner Juan Carlos Bermudez

APPROVAL PATH:
Board of County Commissioners

USER DEPARTMENT:

Department of Transportation and Public Works

MANAGING DEPARTMENT:

Department of Transportation and Public Works

Delegation of Authority
The authority of the County Mayor or County Mayor's designee to execute and implement the contract is consistent with those authorities granted under the County Code.

Fiscal Impact / Funding Source
The fiscal impact for the contract is $17,933,304.63, inclusive of a contingency allowance of $1,618,298.15 and $132,025.00 for other allowances. The annual estimated operations and maintenance costs are approximately $33,961.38, consisting of $24,796.76 for operations and $9,164.62 for maintenance. Project No. 77230 is associated with the roadway improvement project along NW 58 Street from NW 97 Avenue to NW 79 Avenue. This contract is funded through the following source:

Program Name / Program Number County Budget Funding Source
Arterial Roads - Countywide / 2000000538 FY 25 - 26 Adopted Budget and Multi � Year Capital Plan, Volume 2, Page 135 Mobility Impact Fees


PTP FUNDING:
No

GOB FUNDING:
No

ARRA FUNDING:
No

BID PACKAGES ISSUED:
Electronic Download

BIDS RECEIVED:
8

CONTRACT PERIOD:
730 calendar days � for all work required by the contract documents with substantial completion occurring within 657 days from the Notice to Proceed

IG FEE INCLUDED IN BASE CONTRACT:
Yes

ART IN PUBLIC PLACES:
No

BASE CONTRACT AMOUNT:
$16,182,981.48

CONTINGENCY ALLOWANCE (SECTION 2-8.1
MIAMI DADE COUNTY CODE):
TYPE PERCENT AMOUNT COMMENT
Construction 10% 1,618,298.15

PERMIT ALLOWANCE:

$4,000.00
OFF-DUTY LAW ENFORCEMENT OFFICER ALLOWANCE: $80,000.00
BITUMINOUS MATERIALS ADJUSTMENT ALLOWANCE: $40,000.00
FPL CONNECTION ALLOWANCE: $6,000.00
For Reimbursement of Cost Associated with The Utility Access Program (UAP) Fee (2%) Applied to All Other Allowances Paid at Invoice Cost: $1,800.00
For Reimbursement of Cost Associated with The Independent Private Sector Inspector General (0.25%) Applied to All Other Allowances Paid at Invoice Cost: $225.00
TOTAL AMOUNT:
$17,933,304.63
Track Record / Monitor
Fernando Mardones, DTPW Engineer III, is the Project Manager.

EXPLANATION:
According to the Small Business Development (SBD) Office and its database, there are no violations on record within the last three years for Horizon Contractors, Inc., and a 1.00% Small Business Development Goods & Services goal has been established for this project.

The project was advertised on Thursday, October 16, 2025. On Friday, October 17, 2025, eight contractors submitted bids. The three lowest responsive and responsible bids were as follows:

� Horizon Contractors, Inc. submitted the lowest base bid of $16,182,981.48, which is 0.55% below the County�s cost estimate.
� H&R Paving, Inc. submitted the second lowest base bid of $16,662,061.25, which is 2.40% above the County�s cost estimate.
� General Asphalt Co., Inc. submitted the third lowest base bid of $18,655,434.96, which is 14.65% above the County�s cost estimate.

This project was bid on a unit price basis. A copy of all bids, and the bid tabulation for this project, is available by contacting the Chief of Capital Improvements, DTPW.

Within the last 15 years, Horizon Contractors, Inc., had 10 evaluations in the Capital Improvements Information System, with an average evaluation score of 3.3 out of a maximum score of 4.

Due diligence was conducted in accordance with Procurement Guidelines to determine contractor responsibility, including verifying corporate status with the Florida Department of State�s Division of Corporations and reviewing performance and compliance issues. Furthermore, pursuant to Resolution No. R-1181-18, copies of Occupational Safety & Health Form 300 � Log of Work-Related Injuries and Illnesses for the last three years are on file with DTPW and are available upon request. No major issue related to safety was found.

BID OPEN DATE:
11/19/2025

BID BOND EXPIRES:
05/19/2026

BID VALID UNTIL:
11/19/2026

PRIME CONTRACTOR:
Horizon Contractors, Inc.

COMPANY PRINCIPALS:
Jose M. Sanchez

COMPANY QUALIFIER:
Jose M. Sanchez
COMPANY EMAIL ADDRESS:
[email protected]


COMPANY STREET ADDRESS:

8175 W 32 Ave, Suite #2

COMPANY CITY-STATE-ZIP:
Hialeah, Florida 33018

EXCEED LEGAL REQUIREMENTS:

No

STANDARD PAYMENT AND PERFORMANCE BOND:

Yes

REVIEW COMMITTEE:
MEETING DATE: 04/17/2025 SIGNOFF DATE: 04/17/2025


RESPONSIBLE WAGES:
(RESOLUTION No. R-54-10)

REVIEW COMMITTEE ASSIGNED CONTRACT MEASURES:

No

TYPE GOAL
SBE-G&S 1.00%
CWP N/A

MANDATORY CLEARING HOUSE:

Yes

SEA LEVEL RISE: (ORDINANCE 14-79) Yes

SUSTAINABLE
BUILDINGS
ORDINANCE:
(I.O. NO. 8-8)

Yes
CONTRACT MANAGER NAME / PHONE / EMAIL:
Tiondra Wright, Chief
(305) 375-4891 [email protected]

PROJECT MANAGER NAME / PHONE / EMAIL:
Rene Idarraga, Chief (305) 275-2111 [email protected]

BACKGROUND:
The existing segment of NW 58 Street features four lanes with a striped center turning lane. However, the roadway lacks sidewalks, curbs and gutters, and dedicated bicycle facilities. The existing guardrail on the north side, adjacent to the canal, does not meet current resistance standards and must be upgraded. Additionally, the traffic signals require timing optimization and other improvements, and new roadway lighting is necessary throughout the corridor to enhance safety and visibility.


____________________
Roy Coley
Deputy Mayor




Home  |   Agendas  |   Minutes  |   Legislative Search  |   Lobbyist Registration  |   Legislative Reports
2026 BCC Meeting Calendar  |   Miami-Dade County Code of Ordinances   |   ADA Notice  |  

Home  |  Using Our Site  |  About Phone Directory  |  Privacy  |  Disclaimer

E-mail your comments, questions and suggestions to Webmaster  

Web Site � 2026 Miami-Dade County.
All rights reserved.