| File Number: 261136 | File Type: Resolution | Status: In Committee | ||||||
| Version: 0 | Reference: | Control: Transportation Cmte | ||||||
|
||||||||
| Requester: Transportation and Public Works | Cost: | Final Action: | ||||||
|
||||||||
|
||||||||
|
||||||||
| Sunset Provision: No | Effective Date: | Expiration Date: | ||||||
| Registered Lobbyist: | None Listed |
Legislative History |
|||||||
| Acting Body | Date | Agenda Item | Action | Sent To | Due Date | Returned | Pass/Fail |
| |
|||||||
| County Attorney | 6/24/2026 | Assigned | Dale P. Clarke | 6/17/2026 | |||
| |
|||||||
| ROY COLEY | 6/22/2026 | Assigned | Office of Agenda Coordination | ||||
| |
|||||||
| Office of Agenda Coordination | 6/22/2026 | Assigned | County Attorney | 9/1/2026 | |||
| REPORT: | DTPW - Annery Pulgar Alfonso - no sponsor - pending July cmte - Attachment: Agreement - item has 21 pages | ||||||
| |
|||||||
| Legislative Text |
|
TITLE RESOLUTION APPROVING AN OFF-SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT BETWEEN MIAMI-DADE COUNTY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION FOR LOCAL ROADWAY IMPROVEMENTS FOR SR 934/NW 74TH STREET CONNECTOR FROM WEST OF NW 77TH COURT TO EAST OF RED ROAD, A PORTION OF THE PROJECT INCLUDES WORK ON NW 74TH STREET CONNECTOR AND NW 72ND AVENUE, IN MIAMI-DADE COUNTY, FLORIDA; AND AUTHORIZING THE COUNTY MAYOR OR COUNTY MAYOR�S DESIGNEE TO EXECUTE THE SAME AND EXERCISE THE PROVISIONS CONTAINED THEREIN HEADER WHEREAS, this Board desires to accomplish the purposes outlined in the accompanying memorandum, a copy of which is incorporated herein by reference, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MIAMI-DADE COUNTY, FLORIDA, that this Board: Section 1. Approves the Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation, in substantially the form attached hereto and incorporated herein, for the implementation of local roadway improvements within Project No. FM452566-1-52-01, SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. A portion of the project includes work on NW 74th Street Connector and NW 72nd Avenue, in Miami-Dade County, Florida. Section 2. Authorizes the County Mayor or County Mayor�s designee to execute the agreement for and on behalf of Miami-Dade County and to exercise the provisions contained therein. HEADER Date: To: Honorable Chairman Anthony Rodriguez and Members, Board of County Commissioners From: Daniella Levine Cava Mayor Subject: Off-System Construction and Maintenance Agreement with State of Florida, Department of Transportation and Miami-Dade County for Local Roadway Improvements for SR 934/NW 74th Street Connector from West of NW 77th Court to East of Red Road STAFF RECOMMENDATION Executive Summary The purpose of this item is for the Board of County Commissioners (Board) to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for the implementation of local roadway improvements within Project No. FM452566-1-52-01, i.e., SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. A portion of the project includes work on NW 74th Street Connector and NW 72nd Avenue, roads not on the State Highway System. Some of the specific local improvements include the reconstruction of existing sidewalks, curb ramps, and a traffic separator. The project is estimated to cost $5,900,000 and will be funded and built by FDOT. The anticipated construction start date is March 2027. Recommendation It is recommended that the Board approve the attached resolution authorizing the execution of an Off-System Construction and Maintenance Agreement between the County and FDOT for local roadway improvements within Project No. FM452566-1-52-01, i.e., SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The estimated project cost is $5,900,000 and will be funded by FDOT. Scope The project is in Districts 6 and 12, which are represented by Commissioner Natalie Milian Orbis and Commissioner Juan Carlos Bermudez, respectively. Delegation of Authority The authority of the County Mayor or County Mayor's designee to execute and implement this agreement, including exercising all the provisions contained therein, is consistent with those authorities granted under the Code of Miami-Dade County. Fiscal Impact/Funding Source The project is estimated to cost $5,900,000 and will be funded and built by FDOT. The County is required to provide maintenance operations within the County�s right-of-way upon completion of the project. The County�s maintenance costs are funded through DTPW�s General Fund allocation. Track Record/Monitor DTPW is the entity overseeing this project and the person responsible for monitoring it is Maria D. Molina P.E., Chief, Right-of-Way and Stormwater Planning and Design Division. Background This Off-System Construction and Maintenance Agreement is for the construction of local improvements for SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, specifically at the intersection at NW 74th Street Connector and NW 72nd Avenue. The improvements consist of the following: � Curb ramps � Sidewalk � Curb and gutter � Milling and resurfacing � Widening � Striping � Traffic separator � Loops � Signage If the project requires the acquisition of additional right-of-way, FDOT shall acquire such right-of-way to complete the project at no cost to the County. The anticipated construction start date is March 2027. _________________________ Roy Coley Deputy Mayor |
|
Home |
Agendas |
Minutes |
Legislative Search |
Lobbyist Registration |
Legislative Reports
Home | Using Our Site | About | Phone Directory | Privacy | Disclaimer
E-mail your comments,
questions and suggestions to
Webmaster
|