Solicitation Details - MCC 7360 RPQ No AA017B-2
Back To Search SolicitationsTitle:
MIA Central Terminal Public Restrooms Modernization Group 2
Opening Date:
12/2/2026 2:00:00 PM
Announcement Info:
Shall include, but not be limited to: Provide all labor, equipment and materials for the general interior renovation & modernization of 3-sets (male, female, & janitor's closet) of existing public restrooms at the Central Terminal of the Miami International Airport including new partitions, finishes, flooring, ceiling, hardware, and accessories, together with associated modifications to the plumbing, HVAC, electrical, and fire protection systems. The demolition and renovation shall be performed in a minimum of two phases. CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade Aviation Department (MDAD) for work to be completed. Please refer to the Plans & Technical Specifications for further description of the scope of work.
Contractors must agree to perform all work in accordance with the scopes of work established by MDAD, the MCC 7360 contract’s terms and conditions, all required permits and inspections and all applicable federal, state and local laws, codes and regulations. For the MCC 7360 General Contract Conditions, refer to the following link: https://intrax.miamidade.gov/ciis/TheAmendedStandardConstructionGeneralContractConditions.pdf
LICENSE:
Note: Pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, selected Contractors must possess a valid, current, and active State of Florida and/or Miami-Dade County contractor’s license issued by the County’s Construction Trades Qualifying Board and which is consistent with the requirements of their respective trade and the scope of work.
MINIMUM QUALIFICATIONS AND EXPERIENCE:
The selected contractor must possess:
1. Contractors must hold a valid license required to perform work in the following trade: General Contractor License.
2. As per Resolution No. R-1122-21, Contractors must have a minimum of 5 years’ experience performing work in their specific trade. In the event a new firm is established by executives, supervisors, and other senior field staff (key employees) that would have met these minimum experience requirements with a prior firm, MDAD reserves the right to qualify the new firm, based on MDAD’s sole determination and evaluation of the knowledge and prior experience of these key employees employed by the new firm.
3. Contractors must be able to demonstrate that their firm or its key employees, as described above, have experience performing their respective trade within the company’s noted history. Specifically, contractors must submit proof that their respective firms have been regularly and successfully engaged in work related to their specific trade for a minimum of one (1) year. These requirements shall be based on projects completed prior to the submission date. Contact information for projects and/or firms submitted as proof of experience shall be provided by prospective contractors as part of their bid package. MDAD will confirm the listed experience by calling the firm’s owners or representatives. Should such evidence not be satisfactory to MDAD, whose decision shall be final, the submission will be considered non-responsive. The qualifying proof with names and phone numbers shall be submitted in a sealed envelope at the time of bid.
MANDATORY PRE- BID CONFERENCE & SITE VISIT:
Since a Microsoft Teams meeting does not require physical presence, social distancing practices for COVID-19 are being adhered to. Bidders are still required/responsible for participating in the MANDATORY Microsoft Teams meeting. Failure to participate in the MANDATORY Microsoft Teams meeting shall result in the corresponding contractor/company being considered non-responsive. Contractors are extremely encouraged to join 5 minutes before the scheduled meeting time for a roll call. Late arrivals to the Microsoft Teams meeting shall result in the contractor/company being considered non-responsive.
The Microsoft Teams meeting will be recorded.
The join in instructions for the Microsoft Teams meeting are described below:
Join: https://teams.microsoft.com/meet/277054794512314?p=qpHPSDJnfNTdERU9qC
Meeting ID: 277 054 794 512 314
Passcode: st2d4zC3
________________________________________
Need help? | System reference
Dial in by phone
+1 786-687-259, 131619934# United States, Miami
Find a local number
Phone conference ID: 131 619 934#
The agenda for the pre-bid Microsoft Teams meeting will be sent to you via email to be used during the meeting. Make sure you receive it, if not, please check your junk email or contact our office.
Bidders are responsible for attending the mandatory pre-bid Microsoft Teams meeting and site visit.
REQUEST FOR INFORMATION:
The Cone of Silence is in effect. Requests for information (RFIs) related to the RPQ documents shall comply with the Cone of Silence, Administrative Order 3-27. RFIs shall be submitted in writing following the process and forms outlined in the MCC-7360 contract documents. The deadline for submitting questions and/or RFIs is no less than five (5) working days before the RPQ bid due/opening date and time. RFIs shall be submitted to the MDAD PM with a copy to the Clerk of the Board. The MDAD will issue all changes and/or clarifications to the RPQ in writing via an Addendum. Verbal statements made by the County or the Owner’s Representative that are not contained in the RPQ or Addendum are not binding on the County and do not form any basis for a bidder’s response to a RPQ.
BID SUBMITTAL:
All potential bidders are hereby notified that bids for this project must reflect a lump sum amount. The lump sum amount shall be indicated on the MCC-7360 Attachment 5A Bid Form. All quantities provided with the bid documents are estimated quantities based on the project scope of work. It is the bidder’s responsibility to confirm any and all estimated quantities or amounts reflected on the bid documents to generate a "responsive and responsible" bid. Errors, omissions and/or discrepancies in quantities shall be brought to the attention of the MDAD team via the request for information (RFI) process during the bidding phase. Failure to confirm estimated quantities shall not constitute grounds for subsequent change orders. The lump sum bid amount shall be all inclusive to complete the work scope reflected on the construction bid documents. Bidders are responsible for all costs related to permitting, preparation of required shop drawings, special inspections, preparation of as-built drawings, close-out documentation and/or any engineering certificates required.
Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detailed Scope of Work.
Technical Certification:
General Building Contractor
Commodities
| Code | Description |
|---|---|
| 90638 | GENERAL CONSTRUCTION SERVICES |
| 96820 | BUILDING CONSTRUCTION |
| 96842 | GENERAL CONSTRUCTION |
Solicitation Package/Addendums
| Type | File Name |
|---|---|
| Package | MCC_7360_RPQ_No_AA017B-2.pdf |