Solicitation Details - MCC 7360 Plan RPQ C24-CUA-MDCA-DEMOPH1
Back To Search SolicitationsTitle:
Miami-Dade County Auditorium Phase1-AsbestosAbatement/Construction/MaterialProtection/SelectiveDemo
Opening Date:
6/10/2024 2:00:00 PM
Announcement Info:
Scope of Work:
(Contractor must obtain and submit all permits prior to performing any work).
A summary of the work includes but it is not limited to, the following:
Design work to completely renovate and expand the Auditorium is currently in progress and the first phase of the work, selective demolition, material protection, and asbestos abatement is being procured under this solicitation.
The Project consists of the selective demolition of interior and exterior areas, protection of specialized theater equipment, as well as proper waste management in compliance with LEED specifications, and proper salvage and storage, as well as asbestos abatement as per report and bid documents package.
Prospective bidders are advised that:
1) The County reserves the right to directly purchase materials, equipment, supplies and other items for this project, which are included in the Contractor’s Base Bid and/or the Contract, substantially in accordance with the Contract Documents and;
2) A Recommendation for Contract Award will be conditioned upon the submittal of any and all documents required by the County as part of the bid evaluation process, including but not limited to the schedule of values.
ACM Samples per field tests performed by Terracon Consultants, Inc. on 1/11/23
Exterior
a. Demolish (2) mechanical enclosures at northwest corner and everything contained in them; see keynotes 31 and 63 and sheets D-01, D-03, D-04, and D-05; see electrical drawings for electrical scope of work, FP&L coordination, and phasing
b. Demolish storage building on west side, including walls, roof, doors, foundations, and all concrete ramps, railings, and platforms surrounding the building; see keynote 49 and sheets D-01 and D-03
c. Building envelope shall not be compromised except for the following elements:
• Demolish exterior ducts, plywood duct enclosures, and all scaffolding on the east side of the building. Patch all resulting holes as per keynote 65; see sheet D-04
• Penetrations as a result of demolishing elements within mechanical enclosures noted in item a. above. See keynotes 31 and 63; see sheets D-04 and D-05
d. Demolish loading dock and ramp at north side; see keynote 13 and sheets D-01 and D-03
Interior
a. See electrical drawings for scope of work, FP&L coordination, and phasing
b. Demolish all interior finishes and furnishings, including but not limited to: interior partitions, finishes, ceilings, railings, stone panels, column covers, millwork, and theater seats throughout the building unless otherwise noted
c. Demolish all mechanical, electrical, fire alarm, plumbing, and fire protection pipes, ducts, devices, machinery, and infrastructure throughout all existing building unless otherwise noted. Roof drain pipes to remain
d. Demolish (1) interior monumental stair #2 in lobby, west side; see keynote 59 and sheet D-03
e. Saw cut a new opening into portion of existing 2nd floor lobby floor construction; see keynote 64 and sheet D-04
f. Excavate area on east side for future elevator and stair extension to basement; see keynote 35 and 64; see sheets D-03 and D-04; see structural drawings
g. Demolish slab on grade and ramp on grade at east side vestibule; see keynote 64 and sheet D-03
h. Demolish stair #7 and all framing in its entirety; see keynote 14 and sheets D-02 and D-03
i. Demolish all interior walls, finishes, ceilings, and millwork at back of balcony; see keynote 53 and sheet D-05
j. Remove (2) portions of concrete platforms at south end of auditorium for seat reconfiguration; see keynote 35 and sheet D-03
k. Remove portions of interior masonry for future doors and space reconfiguration at various locations throughout existing building as noted in drawings; see keynote 55 and sheets D-01, D-02, D-03, D-04, D-05, and D-08
l. Demolish interior stair, production offices, and electrical room within loading area; all partitions, doors, finishes, curtains, etc. shall be removed and discarded; see keynote 19 and sheet D-03
m. Salvage and store at stage:
• Sliding door at north side of stage covered with signatures; see keynote 56 and sheet D-03
• Phone booth wood frame in lobby; see keynote 54 and sheet D-03
• 2 wood doors in 2nd floor lobby; see keynote 44 and sheet D-04
• 8 seat end panels at auditorium; see keynote 20 and sheets D-03, D-04, and D-05
• 4 pole railings at auditorium aisles, see keynote 23 and sheet D-05
n. Areas to Protect:
• Build new temporary partition to protect 4’ space on east side of stage to protect rigging lines; see keynote 69 and sheet D-03
• Do not touch upper portion of stage house - see building sections on D-06 and D-07
o. Abatement:
1. All items in abatement report dated 1/11/23 that are within project scope shall be properly abated including, but not limited to:
A. Ceiling in auditorium
B. Perforated panels at auditorium
C. Mastic associated with HVAC ducts
2. Hazardous oil at orchestra pit
Storage
a. Establish a fixed monthly fee for storage and moving services for a period of 24 months, commencing from the project start date. Movers to assist in round-trip packing, loading, transporting, and unloading at secure storage facility with a total area of approximately 3,500 square feet; ensure the storage space is equipped with air conditioning to maintain optimal storage conditions of goods and equipment; guarantee accessibility to the storage area by designated Miami-Dade County staff
b. Additional - Establish a fixed monthly fee for item a. to extend beyond the initial 24 months, as needed
Technical Certification:
General Building Contractor
Commodities
Code | Description |
---|---|
96820 | BUILDING CONSTRUCTION |
96842 | GENERAL CONSTRUCTION |
Solicitation Package/Addendums
Type | File Name |
---|---|
Package | MCC_7360_RPQ_C24-CUA-MDCA-DEMOPH1.pdf |