Solicitation Details - MCC 7360 RPQ 95068R

Back To Search Solicitations

Title:
HCD Bathtub Repair / Replacement
Opening Date:
7/1/2025 10:00:00 AM
Announcement Info:
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Project Overview: This project involves the removal of existing bathtubs and the installation of new bathtubs in multiple units. The work will ensure that the bathtubs are the same size as the ones being replaced, white in color, and fully operational. The installation includes repairing the surrounding walls and tiles to restore the bathroom area to a fully functional state. Additionally, each bathtub installation will include a new bathtub overflow and tub drain assembly. Work Items: 1. Removal of Existing Bathtubs: *Remove and dispose of all existing bathtubs at the listed units. *Inspect the surrounding walls and tiles for any damage caused during the removal. 2. Installation of New Bathtubs: *Install new white bathtubs of the same size and configuration as the removed tubs. *Ensure that the tubs are installed securely and level. 3. Installation of New Overflow and Tub Drain: *Install a new bathtub overflow assembly and a new tub drain for each bathtub. *Ensure the overflow and drain assembly is properly connected to the existing plumbing system to prevent leaks and ensure proper drainage. *Verify that all drain components are properly sealed and aligned. 4. Wall and Tile Repairs: *Repair or replace any damaged walls or tiles surrounding the bathtub area. *Ensure that the new tiles match the existing design and are properly aligned. *Apply grout and sealant to ensure a water-tight fit around the tub and wall joints. 5. Shower Diverter and Tub Spout Installation: *Install new shower diverters and tub spouts with diverters. *Ensure proper alignment and functionality of all fixtures to avoid leaks. 6. Final Inspection and Testing: *Conduct a full inspection of the installation, including the integrity of the bathtub, overflow, drain, tiles, diverter, and spout. *Perform water testing to ensure there are no leaks and that all plumbing works properly. *Ensure that the bathroom is left clean and fully functional for use after installation. Work Locations & Cost Breakdown: The following units will require the described work, with cost breakdowns for each installation component: Group Unit Unit Address Tub Configuration Price per Tub Install & Wall / Tile repairs 1 001081 6226 NW 2 Place Right Hand $ 1 051074 150 NE 69 Street #326 Right Hand $ 2 044162 2200 NW 54 Street #1501 Right Hand $ 2 044064 2200 NW 54 Street #607 Right Hand $ 2 044045 2200 NW 54 Street #501 Right Hand $ 2 015143 2220 NW 57 Street #G Left Hand $ 2 044152 2200 NW 54 Street #1404 Left Hand $ 2 044135 2200 NW 54 Street #1113 Left Hand $ 3 065027 930 NW 95 Street #303 Right Hand $ 3 065043 930 NW 95 Street #403 Right Hand $ 3 043073 950 NW 95 Street #810 Left Hand $ 3 065035 930 NW 95 Street #311 Right Hand $ 3 043100 950 NW 95 Street #1107 Left Hand $ 6 833009 2005 NW 23 Street Left Hand $ 6 845010 1338 NW 34 Street Left Hand $ 7 075006 571 NW 4 Court Left Hand $ 7 075069 419 NW 5 Street Left Hand $ 9 077013 16811 SW 105 Avenue Left Hand $ 9 077009 10464 SW 169 Terrace Left Hand $ 10 841020 15201 SW 288 Street #204 Left Hand $ Grand Total $ Timeline: The work should be completed within a set timeframe, with each unit being scheduled based on priority and availability. Quality Assurance: • Ensure all materials used are of high quality and meet applicable building codes and standards. • Maintain clear communication with the client regarding progress and any issues encountered during installation. • Perform thorough leak testing for overflow and drain installations. Additional Notes: • All new bathtubs, overflow assemblies, tub drains, diverters, and spouts will be installed to match the original tub configuration (Right Hand or Left Hand). • Pricing should reflect material, labor, and any additional unforeseen repair work that may be required.
Technical Certification:
General Building Contractor; Plastering; Plumber, Master

Commodities
Code Description
91464 PLASTERING
91468 PLUMBING
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package MCC_7360_RPQ_95068R.pdf