Solicitation Details - MCC 7360 RPQ P12558

Back To Search Solicitations

Title:
UPGRADE OF SEWAGE PUMP STATION No. 0442 AND 6-INCH FORCE MAIN
Opening Date:
8/4/2025 10:00:00 AM
Announcement Info:
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). 1.00 SCOPE The project consists of furnishing all materials, labor, and equipment necessary to upgrade Sewage Pump Station No. 0442, including, but not limited to, providing uninterrupted bypass pumping capabilities for the existing pump station flow during all construction times and until the new pump station is completely operational and accepted by the Owner; cutting, filling with flowable fill, capping and abandoning in place the existing 4-inch asbestos-cement (AC) force main; demolition and removal of the existing dry/wet well pump station structure including, but not limited to the following: the existing dry/wet well, pumping equipment and appurtenances, piping and fittings, electrical equipment and conduits, and all other items deemed necessary to be removed; site preparation, clearing and grubbing as necessary; furnishing and installing new valve vault structure including concrete top slab and access hatch; furnishing and installing new wet well structure including concrete top slab with access hatch; furnishing and installing new submersible pumps and related equipment; all pipe, fittings and appurtenances for the new pump station and valve vault including emergency pump out piping connection; furnishing and installing new control panel, electrical service with main disconnect, motor connection box and including concrete slabs and mounting structures; installation of 275 (total) linear feet of primary underground duct bank consisting of 215 linear feet of two (2) 6- inch diameter HDPE “Bore Pipe” (supplied by FPL) using trenchless technology (directional drilling) and 60 linear feet of two (2) 5-inch diameter PVC primary conduit (supplied by Contractor) using open cut trenching installation; coordination with FPL and connection of the new electrical service to the proposed pump station; proposed new pad mounted transformer; site restoration; start up and testing; and other appurtenant and miscellaneous items and work for a complete, satisfactory and functional installation. Pumping Station 0442 is located at 20591 N.W. 30th Court, Miami Gardens, Florida, in Section 33, Township 51 South, Range 41 East, Miami-Dade County, Florida. The project scope also includes furnishing all labor, material and equipment including, but not limited to, furnishing and installing, by directional drilling, 505 linear feet of 6-inch ductile iron (DI) pipe, valves and fittings for sewage force main, constructing automatic air release valve assembly; making a tapping connection to the existing 10-inch DI force main with 10 x 10-inch tapping sleeve and 10-inch tapping valve; perform maintenance of traffic; temporary and permanent paving repairs; restoration of sidewalk; and landscaping restoration together with all other miscellaneous and appurtenant items and work for a complete, functional and satisfactory installation. Installation of 6-inch force main piping shall be accomplished using a combination of trenchless technology (directional drilling) and open-cut trenching to minimize disruption of Buccaneer Park. The project work shall be confined to the limits of the Park property and the easements provided with the use of a single entry/exit pit within these limits for each of the directional drilling operations. Staging areas are required to be coordinated with the City of Miami Gardens and WASD Construction Manager. ER S049191 PCTS 12558 The project scope also includes the furnishing all labor, material and equipment including, but not limited to, furnishing and installing 111 linear feet of 8” diameter PVC gravity sanitary sewer pipe and two 4’ diameter sanitary sewer manholes and the connection to two existing sanitary sewer manholes. The existing Pump Station # 0442 Receiving Manhole will NOT be replaced as part of the Scope of Work for this project; therefore, cleaning, visual inspection and evaluation of the upstream VCP piping are not required unless ordered by the Engineer at which time the request will be considered a Change Order/Additional Services. The existing Receiving Manhole northeast invert 8” VCP pipe will be removed and the wall penetration shall be modified as indicated. See approved Contract Documents and Construction Drawings for details. The scope of this Work may require the removal of small portions of asbestos and/or lead and/or other hazardous materials from the project site, including but not limited to asbestos-cement (AC) pipes. The removal, transport and disposal of hazardous materials shall be performed by Florida Licensed Asbestos Abatement Contractor (FLAAC) and trained personnel wearing personal protective equipment (PPE). All work involving hazardous materials shall be coordinated with the M-D WASD Asbestos and Industrial Waste Compliance Unit (ALWCU) (Telephone number (786) 552-8578) for evaluation, and do not continue the Work until instructed to proceed by the Engineer. Refer to Technical Specification - General Covenants and Conditions, Section 44. The Department reserves the right to issue the Notice to Proceed (NTP) to the Contractor at any time after the Award Letter has been issued.
Technical Certification:
General Engineering; Pipe Lines; Pipelines Engineering Contractor; Underground Utility / Excavation; Paving; (NIGP 98852) Landscaping ; Sodding Services (NIGP 79050).

Commodities
Code Description
91394 PAVING/RESURFACING, ALLEY AND PARKING LOT
96814 ALLEY RESURFACING (PAVING)
96856 MAJOR STREETS - RESURFACING (PAVING) ANDREPAIR
96866 RESIDENTIAL STREET RESURFACING (PAVING)
98852 LANDSCAPING (INCLUDING DESIGN, FERTILIZIN
98868 PAVING AND REPAIR OF PARKING LOTS (NOT INCLUDING
21055 PAVING AND STEPPING BLOCKS
79050 SOD, GRASS
Solicitation Package/Addendums
Type File Name
Package MCC_7360_RPQ_P12558.pdf