Solicitation Details - MCC 7360 RPQ P20199
Back To Search SolicitationsTitle:
NDWWTP Sodium Hypochlorite Bldg. Ventilation Improvements
Opening Date:
6/10/2025 10:00:00 AM
Announcement Info:
Scope of Work:
(Contractor must obtain and submit all permits prior to performing any work).
A. Scope
1. This Section describes the project in general and provides an overview of the extent
of the Work to be performed under this Contract. Detailed requirements and extent of
Work is stated in the applicable Specification and shown on the Plans.
2. The Contractor shall, except as otherwise specifically stated herein or in any
applicable parts of the Contract Documents, provide and pay for all labor, materials,
equipment, tools, construction equipment, and other facilities and services
necessary for proper execution, testing, and completion of the Work under this
Contract.
B. The Work is located at the North District Wastewater Treatment Plant (NDWWTP) owned
by the Miami-Dade Water and Sewer Department (the Department). The NDWWTP is
located 2575 NE 156 Street, North Miami, Florida. Throughout the Contract Documents,
the NDWWTP may be referred to as the Plant.
C. Notes Regarding Substantial Completion.
1. Where a Phased Substantial Completion of a Facility is indicated and allowed within
these Contract Documents, completion of the Acceptance Test Phase for the Facility
is required prior to obtaining this Phased Substantial Completion.
2. Substantial Completion for the completion of all of the Work will not be granted until
completion of the Acceptance Test Phase for all Facilities has been achieved.
3. Reference the General Conditions for conditions of requesting and acceptance of
Substantial Completion and Final Completion.
D. Notes regarding Dry Season and Wet Season
1. Throughout these Contract Documents, there are requirements for work to be
performed during the Dry Season. The Dry Season and Wet Season are defined as
follows:
a. Dry Season: December 1st through May 31st
b. Wet Season: June 1st through November 30th.
E. Transition to E-builder
1. The Contractor shall be prepared at no additional cost to the Department to
transition to electronic submittals using E-Builder software package of all invoicing,
submittals, RFI’s and all other submittal requirements included in the Contract
Documents when directed to do so by the Department.
1.02 SPECIFICATIONS
A. The Specifications included in these Contract Documents establish the minimum
performance and quality requirements for materials and equipment together with the
minimum standards for quality of workmanship and appearance. Generally, there has
NDWWTP SODIUM HYPOCHLORITE BUILDING VENTILATION
IMPROVEMENTS
SUMMARY OF WORK
PAGE 01 01 00 – 2
been no attempt to separate the Specifications into groups for the Work of separate
Subcontractors, or for Work to be performed by the various trades. Should there be any
question as to the interpretation of any particular Specification Section or part of a
Specification Section, such question should be directed to the Engineer prior to the
submittal of a proposal for the Work under this Contract.
B. The Work shown on the Plans is intended to be comprehensive and descriptive, not an
exact and complete representation of the actual finished Work. Installed Work shall
include fittings, joints, supports, nuts, bolts, and all other accessories required to provide
complete and satisfactory systems, even though some items may not be specifically
shown on the Plans.
C. It is the intent of the Department to obtain a complete functional, and satisfactory
installation under this project, and any items of labor, equipment or materials, which may
be reasonably assumed as necessary to accomplish this end shall be supplied, whether
or not they are specifically shown or specified in the Contract Documents, which may be
supplied or stated herein. The Contractor shall provide all materials for the project unless
they are specifically called out in these specifications as being supplied by the
Department. The Contractor shall also supply all sheeting, shoring, dewatering, bracing
and all other labor, material or equipment required to preclude damage to, or loss of
functionality of, any existing facility and systems.
D. No request for additional compensation for delays or additional Contract time (except for
a non-compensable time extension at the discretion of the Engineer and the Department,
whose decision shall be final) resulting from encountering utilities or structures not
shown, or differing in location or elevation from that shown, will be considered. The
Contractor shall explore sufficiently ahead of the Work to allow time for any necessary
adjustments without delay to the progress of the installation. Costs due to delays
occasioned by encountering underground utilities or structures which could have or
should have been discovered by timely exploration ahead of the Work, shall rest solely
with the Contractor.
1.03 REASONABLY IMPLIED PARTS OF THE WORK SHALL BE DONE THOUGH ABSENT FROM
SPECIFICATIONS
A. Any part of the Work which is not mentioned in the Specifications but is shown on the
Plans, or any part not shown on the Plans but described in the Specifications, or any part
not shown on the Plans nor described in the Specifications, but which is necessary or
normally required as a part of such Work, or is necessary or required to make each
installation satisfactorily and legally operable, shall be performed by the Contractor,
without extra cost to the Department, as if fully described in the Specifications and
shown on the Plans, and the expense thereof shall be included in the applicable unit
prices or lump sum bid for the Work.
1.04 MILESTONE DATES
A. The following construction schedule milestone dates have been determined to be critical
for the completion of this construction contract.
NDWWTP SODIUM HYPOCHLORITE BUILDING VENTILATION
IMPROVEMENTS
SUMMARY OF WORK
PAGE 01 01 00 – 3
Milestone No. Milestone Type/Name Calendar Days after
Notice to Proceed
1 Substantial Completion 205
2 Final Completion 212
1.05 DESCRIPTION OF WORK
A. The Work generally includes, construction and installation of a new ventilation system
that consists of supply and exhaust fans and replacement of the existing louvers.
B. The Work in these Contract Documents generally include the following:
1. Demolition
a. Demolition of existing louvers and inline fan as indicated in the Plans.
2. Construction
a. Furnishing and installation of one inline exhaust fan, two wall mounted supply
fans, two wall mounted circulating fans, and associated appurtenances.
b. Connection of new equipment to existing electrical system.
c. Replacement in kind of the existing louvers.
C. The Contractor shall furnish start-up and commissioning services including equipment
startup and testing; piping testing; providing the services of field technicians and
personnel by the Suppliers to provide the services for installation, startup, and training;
coordination with the Department, Engineer, other contractors, and regulatory agencies.
D. The Contractor shall furnish all required material, labor, equipment, appurtenances, and
miscellaneous items for the project.
E. Plant Operations: The Work shall be executed while the wastewater plant is in operation.
The Contractor’s activities shall not adversely affect the operations or impact the
treatment capacity of the plant. Refer to the requirements outlined in Section 01 10 00 –
Special Project Procedures.
F. Asbestos Work
1. All existing electrical equipment is assumed to contain asbestos. Hence, it is
suspected asbestos may be encountered and abatement may be required as part of
this Work.
2. The Contractor shall contact MDWASD’s Environmental Compliance Section to
confirm the presence of asbestos, once electrical equipment is de-energized.
3. The contact person for MDWASD ECS is Jose Tovar, Environmental Resources Project
Supervisor for the Asbestos & Industrial Waste Compliance Unit (AICU).
a. Phone: (786) 402-7603
b. Email: [email protected]
4. If the electrical equipment is confirmed to have asbestos, engage a Florida-Licensed
Asbestos Contractor remove the asbestos containing material (ACM) before any
renovation or demolition may be performed.
5. The demolition, handling, and removal of materials containing asbestos encountered
during construction in any existing structure or existing field item within the
NDWWTP SODIUM HYPOCHLORITE BUILDING VENTILATION
IMPROVEMENTS
SUMMARY OF WORK
PAGE 01 01 00 – 4
boundaries of the Work shall be funded in accordance with Section 01 29 00 -
Measurement and Payment and done in accordance with:
a. OSHA 29 CFR 1910.134 and 1926.1101
b. EPA 40 CFR Part 61, Subpart M (NESHAP)
c. State of Florida’s Administrative Code 62-204.800
d. State of Florida, Chapter 62-257, F.A.C. (Asbestos Program)
e. Florida Statues, Chapter 469, Licensing Requirements
f. Miami-Dade County Division of Environmental Resources Management (DERM)
Chapter 24.
1.06 MINIMUM CONSTRUCTION EXPERIENCE OF THE CONTRACTOR
A. With the bid, the successful Bidder shall submit proof that the firm has at least the
minimum successful contract experience as required below for this Contract. Such proof
shall consist of a list of projects, completed prior to the bid date, with the names and
telephone numbers of the Department’s or representatives that the Department can
contact to confirm the listed experience.
B. The Bidder and proposed project manager shall have successfully completed a minimum
of three (3) project demonstrating experience with installation and furnishing of HVAC
fans and associated systems. This project shall have been performed within the past ten
(10) years from the date of the Invitation to Bid.
C. The Bidder or Bidder’s Electrical Subcontractor shall have successfully completed a
minimum of three (3) projects demonstrating experience with HVAC upgrades including
supply and exhaust fan installation. These projects shall have been performed within the
past ten (10) years from the date of the Invitation to Bid.
D. In the event that the Bidder is established by executives, supervisors and other senior
field staff (key employees) that would have met these minimum experience requirements
with a prior firm, the Department reserves the right to qualify the firm based on
Department’s sole determination and evaluation of the knowledge and prior experience
of these key employees employed by the new firm. The experience of key senior
personnel with other firms may be counted towards the experience requirement, if
acceptable to the Engineer. Should such evidence not be satisfactory to the Engineer,
whose decision shall be final, the bid will be considered non-responsive, and the second
lowest bidder will be considered for award. The qualifying proof shall be submitted in a
separate sealed envelope with the bid.
1.07 TESTING PROCEDURES
A. Testing procedures shall be submitted to the Engineer and will be subject to review and
approval. The Department reserves the right to require test procedures and equipment
changes and revisions to the test procedures, to the extent considered appropriate by
the Engineer, whose decision shall be final.
B. The Contractor is advised that all testing shall be carried out in accordance with the best
practices of the trade, best management practices (BMP) and as recommended in
writing by the engineering/technical/test staff of the Supplier of the equipment and
NDWWTP SODIUM HYPOCHLORITE BUILDING VENTILATION
IMPROVEMENTS
SUMMARY OF WORK
PAGE 01 01 00 – 5
should plan and price the test Work accordingly. In no case will test recommendations of
a Supplier's sales or management groups be considered sufficient.
C. All necessary temporary power sources, test materials, test instrumentation, qualified
test personnel including Supplier's representatives, fuels and lubricants shall be provided
by the Contractor and shall be as approved by the Engineer and, if not approved, the
Contractor shall change the item(s) to the satisfaction of the Engineer. Where required by
the Engineer, testing shall be carried out utilizing contractor-supplied power sources and
load banks prior to any connection with FPL. The Contractor shall include in the price bid
all costs for testing and no extra compensation for this item will be allowed.
D. Factory testing of equipment, including witnessed testing, shall be in accordance with the
requirements provided in the Specifications. All costs for factory testing, including travel
for witnessed testing, shall be included in the price of the bid, and no extra
compensation will be allowed. Test data from these tests shall be provided to the
Engineer and approved prior to shipment. During the cost breakdown process, the
Contractor shall agree with the Engineer on the amount of a credit to Department for
each item to be witness tested in the instance such test is agreed to be canceled.
E. Onsite testing shall conform to the protocol previously approved by the Engineer and
shall include testing and calibration prior to energizing of individual cubicles followed by
testing and calibration as a whole system or group of systems. The Contractor shall
supply all material, equipment, power, time, and fully qualified specialist personnel to
perform all system integration Work as necessary to provide systems that talk to one
another and correctly react to one another, including systems that must communicate
with, and react to existing systems, and systems being or to be installed by others. It is
an absolute requirement that upon completion, all systems installed in the Work be able
to correctly communicate and react to one another and to systems in existence, being or
to be installed, external to the Work. Final testing and calibration will be performed with
the equipment energized and will only take place when the Engineer is satisfied with the
results of earlier tests. Full written reports of tests and results shall be furnished by the
Contractor to the Department. All costs for this testing, calibration, system integration
and reporting, including the costs for factory and specialist personnel required during
testing, calibration and system integration, shall be included in the bid prices, and no
extra compensation will be allowed. Any delays or costs occasioned by test procedures or
results not being satisfactory to the Engineer shall rest solely with the Contractor and no
extra time or compensation will be allowed. All on site testing shall be witnessed by the
Department, and the Contractor shall make timely arrangements and fully coordinate
tests with the Engineer.
F. After installation is completed, the Contractor shall provide records of nondestructive
electrical insulation tests performed by a certified institution approved by the Engineer,
witnessed by the Department personnel and attesting that the dielectric condition of the
equipment and wiring is acceptable.
Technical Certification:
General Building Contractor; Air Conditioning Unlimited; Electrical Contractor
Commodities
Code | Description |
---|---|
91438 | ELECTRICAL |
96820 | BUILDING CONSTRUCTION |
96842 | GENERAL CONSTRUCTION |
Solicitation Package/Addendums
Type | File Name |
---|---|
Package | MCC_7360_RPQ_P20199.pdf |