Furnish and Install 8-inch PVC C900 Force Main and 8-inch PVC C900 Water Main along SW 152nd St
Opening Date:
10/26/2026 10:00:00 AM
Announcement Info:
1.00 SCOPE The Project, including mobilization and demobilization, consists of furnishing and installing water main and sewage force main improvements as described below. FORCE MAIN The Project, including mobilization and demobilization, consists of furnishing and installing approximately 6,330 linear feet of 8-inch diameter PVC C900 DR18 pipe for a Sewage Force Main. The pipeline will extend along SW 152nd Street from SW 77th Ave to SW 74th Ave, and from SW 72nd CT to the west side of the canal at the Paradise Point Drive entrance to Royal Harbour Yacht Club. The installation includes ductile iron (D.I.) zinc-coated and polyethylene encased fittings, as well as joint restraints. Additionally, the project involves the placing of service and grout filling of approximately 1,930 linear feet of 8-inch D.I.P. force main and about 570 linear feet of 6-inch D.I.P. force main. Tasks involve exploratory excavation for connections to existing 6-inch through 16-inch pipes and a6 existing utility crossings, one connection to an existing reducer with an 8-inch 45-degree bend, and the installation of one 16” M.J. plug valve. Cut-in plug connections to existing sewage 8-inch and 6-inch force main will be made for grout injection and abandonment in place. The scope also includes locating the existing 6-inch force main west of the canal crossing, connecting it to the existing 6-inch sewage force mains, and installing mechanical joint restraints as necessary. Additional project components include automatic air release valve assemblies for the sewage force mains, polyethylene encasement for ductile iron valves, fittings, and restraints, as well as sheeting, and shoring, and any additional suitable backfill if required. Coordination with the Miami-Dade Water and Sewer Department (MDWASD) is essential for all connections, including those to adjacent sewer services. The project will also furnish all materials, equipment, and supplies necessary for cleaning and testing the force main. The scope also includes the removal of existing asphalt pavement, sod, and legal disposal of demolition material. Traffic control, as well as the temporary and permanent replacement of any damaged pavement, driveways, sod, landscaping, and pavement markings, are also part of the project. WATER MAIN The Project, including mobilization and demobilization, involves furnishing and installing approximately 1,860 linear feet of 8-inch diameter P.V.C. C-900 DR18 pipe for a new water main. It also includes ductile iron (D.I.) fittings that are zinc-coated and polyethylene wrapped, with joint restraints, along SW 152nd Street, from SW 67th Avenue to the west side of the canal at Paradise Point Drive and the entrance to Royal Harbour Yacht Club. Additionally, the project includes abandoning in place and grouting approximately 1,950 linear feet of 16-inch D.I.P. water main. The work also involves digging to make connections to the 16- inch water main and to cross existing utilities, installing one (1) resilient seated gate valve; two (2) fire hydrant assemblies with 6-inch PVC C900 DR18 fire hydrant lead piping and 6-inch gate valves; two (2) 1-inch long water services, and connecting to an existing 16-inch butterfly valve using a 16-inch x 8-inch D.I. reducer. Other tasks include installing one 8-inch solid sleeve, making plug connections to the existing 16- inch water main for grout injection and abandonment, and installing air release valve assemblies for water main. The project also involves sheeting and shoring, which may stay in place if ordered by the Engineer, and coordinating with MDWASD for all connections, including to nearby water services. Additional work includes providing suitable backfill and compaction as needed, furnishing all materials, equipment and supplies required for cleaning, testing and disinfecting the mains as well as the removal of existing asphalt pavement, sod and demolition materials. The project also requires the transport, salvage and legal disposal of demolition materials, placing existing water mains out of service once the work is completed. Finally, the project includes the temporary and permanent replacement of any pavement, sidewalk, sod, pavement markings and/or driveway damage during construction, along with all other appurtenant and miscellaneous work for a complete and fully functional installation. The Project is in a portion of Section 22-27, Township 55, Range 40 E, in the Village of Palmetto Bay, in Miami-Dade County, Florida. The intent of this Project is to replace Department-owned water and wastewater facilities that are deficient due to age, capacity, or documented condition, and that affect reliable service within the project limits. If, during construction, the Department identifies additional facilities that: (a) are within or adjacent to the project corridor, or (b) are directly connected to the facilities being replaced and necessary to maintain reliable service, the Department may approve adjustments to the Project scope to include such facilities. Any such adjustments will be documented by the Department, must demonstrate a direct relationship to the Project's purpose of maintaining continuous and reliable service, and be executed in accordance with the contract provisions governing changes in work. 1.01 MINIMUM REQUIREMENTS OF THE BIDDER A. License Requirements 1. At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and these Solicitation and Contract Documents, the Bidder must hold a valid, current, and active: a. Certificate of Competency from the County's Construction Trades Qualifying Board as a General Engineering Contractor or as a Pipeline Engineering Contractor. The Pipeline Engineering Contractor shall subcontract with a qualified contractor any work which is incidental to the pipeline specialty but is specified in the aforementioned Code as being the work of other than that of the Engineering Specialty for which certified; or MIAMI-DADE WATER AND SEWER DEPARTMENT Version: 20251010 TECHNICAL SPECIFICATIONS BID SET Page 3 of 171 b. Certification, as a General Contractor or as an Underground Utility and Excavation Contractor, provided by the State of Florida Construction Industry Licensing Board, pursuant to the provisions of Section 489.115, Florida Statutes. MINIMUM EXPERIENCE REQUIRED: B. Experience 1. In addition to the license requirements in Section 1.01, A above, the Bidder must have a minimum of three (3) years of experience, under its current business name (which can include the experience of key supervisory employees that would man the project), in the construction of roadway/ horizontal projects of similar scope and scale involving public right-of-way construction/ installation/ repair/ replacement of water main distribution systems and/or sanitary sewer main collection systems, and maintenance of vehicular traffic, supported by references for three (3) projects completed within the past ten (10) years. Submitted reference Projects must demonstrate that the Bidder served as the Prime Contractor for the referenced Projects provided. 2. The Bidder must demonstrate that it has full-time personnel with the necessary experience to perform the Project's Scope of Work. This experience shall include work in successfully completed projects performed by the identified personnel whose bulk of work performed in the public right-of-way is similar in detail to the Project's Scope of Work described in these Solicitation Documents. Demonstrate the experience requirement by: a. Providing a detailed description of at least three (3) projects similar in detail to the Project's Scope of Work described in these Solicitation Documents and in which the Bidder's identified personnel is currently engaged or has completed within the past ten (10) years. List and describe the aforementioned projects and state whether the work was performed for the County, other government clients, or private entities. For each project listed, the pipe installation shall have been completed and accepted by the project owner prior to the bid submittal date. The description must identify for each project: 1) The identified personnel and their assigned role and responsibilities for the listed project 2) The client name and address including a contact person and phone number for reference 3) Description of work 4) Total dollar value of the contract 5) Contract duration 6) Statement or notation of whether Bidder's referenced personnel is/was employed by the prime contractor or subcontractor, and 7) For completed projects, provide letters of certification of final acceptance or similar project closure documentation issued by the client and available Contractor's performance evaluations.
Technical Certification:
Building Contractor, General Building Contractor, Pipe Lines, Pipelines Engineering Contractor, General Engineering, Underground Utility/Excavation

Commodities
Code Description
90638 GENERAL CONSTRUCTION SERVICES
92533 ENGINEERING SERVICES PROFESSIONAL
96291 UTILITY LOCATOR SERVICE (UNDERGROUND)
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
96865 PIPE LINE CONSTRUCTION AND REPAIR
28080 UNDERGROUND CABLES AND WIRES, SOLID AND STRANDED,