Solicitation Details - RPQ No 18650-26

Back To Search Solicitations

Title:
South Dade Landfill Stormwater Improvements
Opening Date:
8/19/2026 2:00:00 PM
Announcement Info:
Funding Source: This project is partially funded by the State of Florida Department of Environmental Protection. Project name: South Dade Landfill Stormwater Improvements RPQ No. 18650-26 Site Address: 23707 SW 97th Ave., Homestead, FL 33190 Site Hours of Operation: 7:00 AM to 7:00 PM, Monday through Sunday Work Hours: 7:00 AM to 7:00 PM, Monday through Friday Special Work Hour Requirements: Construction of the access road from the facility entrance to Cell 5 of the landfill must be performed outside of the site’s hours of operation to avoid interference with ongoing operations. Work that does not hinder facility operations may be conducted between 7:00 a.m. and 7:00 p.m., Monday through Friday; however, all proposed work hours, including any exceptions, must be reviewed and approved by the County prior to the commencement of construction activities. Purpose: The Miami Dade County’s Department of Solid Waste Management (DSWM) South Dade Landfill has a 30-acre site, including administration and operational areas that are currently experiencing stormwater management issues. Existing conditions include ponding along the access road and areas south of the administration building. The County is seeking a licensed General Contractor or Building Contractor to improve and restore the stormwater management system within the project area. Description of Work: The project consists of furnishing all labor, materials and equipment necessary for roadway and stormwater improvements at the South Dade Landfill. The scope includes, but is not limited to, the following: • Milling and resurfacing of on-site and off-site roads • Road reconstruction of on-site and off-site roads • Milling and resurfacing of the parking lot • Restoration of existing detention areas • Grading and drainage improvements • Upgrading and restoring signage and pavement markings • Installation of a new electrical service General Requirements: • The Contractor shall coordinate with the Facility Supervisor and the Engineer of Record (EOR) to phase the work in a manner that minimizes disruptions to facility operations, equipment, and circulation of vehicles. • Facility operations shall remain uninterrupted during the site’s normal operating hours.
Technical Certification:
General Building Contractor, Building Contractor

Commodities
Code Description
90638 GENERAL CONSTRUCTION SERVICES
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package RPQ_No_18650-26.pdf
Package BID_DOCS_RPQ18650-26.pdf