Solicitation Details - MCC 7360 RPQ No PP-015-MC
Back To Search SolicitationsTitle:
Peace and Prosperity Rehab Program
Opening Date:
11/9/2026 2:00:00 PM
Announcement Info:
Donal Coleman
14355 SW 92 Terr
Miami FL, 33186
786-484-5927
Exterior Repairs:
Permits and inspections are required for all work
1)Kitchen Cabinets Rehab:
Provide materials and labor to remove existing kitchen cabinets, to include but not limited to remove of cabinets, backsplash, counter tops, sink.
Demolish existing kitchen: Furnish labor and equipment to remove and haul away old kitchen cabinets over kitchen walls. Dispose of debris in accordance with county ordinances and codes. Proper care should be used to protect furnishings and other finished. Damage directly related to the demolition activities shall be promptly corrected by the contractor at no additional cost.
Laminated color selection by owner
Kitchen cabinets, Wall Units: Furnish and install wall cabinets, made with plywood cases and wood face frames clad with 1/16” laminate. All interior to be vinyl clad. All shelf edges shall be trimmed with 1/16” laminate. All necessary hardware to include. But not limited to the following should be better grade, doors pull, knobs, drawer slides, and catches. Installed as per shop drawings.
Approximately 18 lineal feet
Laminated color selection by owner
Countertop: shall be approximately 25” wide 18” backsplash, same shape as existing, both made of plywood, with 1/16” minimum on top and 1/16” on all edges.
Approximately 18 lineal feet
Laminated color selection by owner
Owner will keep existing appliances
Single compartment sink: replace, furnish and install stainless steel single compartment sink sears or equivalent, with 8” minimum depth, with single handle faucet delta or equivalent, including basket strainers, supply and drain lines, shut off valves chrome plated brass and all necessary plumbing.
Ceiling mounted LEED light fixture: furnish and install new LED light fixture to include all required mounting hardware and wiring. Unit to provide suitable lighting for the kitchen area.
Provide New Range Microwave Installation:
• Microwave must be vented through the exterior wall.
• Install the new range microwave according to manufacturer specifications.
• Securely mount the unit to the wall or cabinetry.
• Install and properly seal all ductwork to ensure correct exterior venting.
• Connect electrical wiring to a dedicated circuit, as required by code and manufacturer guidelines.
• Ensure all duct joints and connections are fully sealed for optimal performance.
$____________
2) Exterior Door Replacement:
Remove existing front entry door. Furnishing & Installation of a new, 6 panel, steel, insulated, pre-hung door, with all needed hardware, trim, and lockset. Including the handle/knob and the lock, door to be painted. Owner to select color
•Doors must have NOA approved by Miami-Dade County and/or Current FBC approval.
•Provide Peep hole as required at front entrance door as per code.
•The door is to swing out with code required security hinges.
•Provide industry standard trim on outside and inside (casing mold) Miami Dade County, industry-standard trim (molding) for residential construction uses moisture-resistant materials
•Patch stucco surface around door to match existing finish.
•Paint Door and trim to match existing paint color and finish.
NOTE: CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
EXISTING DOOR OPENINGS FOR SIZES AND EXISTING
STRUCTURAL CONDITIONS BEFORE ORDERING AND
INSTALLING THE NEW DOORS.
Locations:
Front (South): 36” x 80” RH OS (Code Approved)
Side door (East) 36” x 80” LH, OS (Code Approved)
$__________
3)Window Replacement:
* Furnish & install: New horizontal roller, full lite windows with impact resistant glass and gray tint in
existing window openings.
* The windows shall be made of aluminum with insect screens and locking mechanism.
* Windows are to be approved by Miami Dade County “NOA” and or the state of Florida Building
Code.
* Installed as per manufacturer specifications.
* Patch all work and finishes to match existing finishes, on both interior and exterior surfaces.
* Remove all debris including “iron bars” and dispose of at an approved site.
* Provide approved Building Permit card.
Total Window Openings: 8.
East Side: 53” x 16” OBS Glass, 74” x 50”
North Side: 37” x 38”, 53” x 50” x 3ea opening 158” x 50”, 53” x 50” x 3ea opening 158” x 50”
South Side: 37” x 63”, 53” x 50”, 53” x 50”
West Side: N/A
NOTE: CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING WINDOW OPENINGS
FOR SIZES AND EXISTING STRUCTURAL CONDITIONS BEFORE ORDERING AND INSTALLING
THE NEW WINDOWS.
$_____________
4)Bathroom Rehab, Complete.
Tub to shower pan conversion
Provide materials and labor needed to rehab bathroom completely. This work includes but is not limited to the following: demo down to the framing, repair any damaged framing, repair existing plumbing and electrical, install new sheet rock on ceiling and walls, new tile on walls and floor, new plumbing fixtures, paint all exposed wall and ceiling. All work to follow ADA standards.
•Demo: Furnish Materials and labor required to remove existing walls, floor, and ceiling covering to permit rehab of bathroom. Remove all fixtures and temporarily cap off drain and cold/hot water pipes accordingly. Remove ceramic tiles on walls and floor. Remove all sheet rock, plaster board, tile backer board and any other type of wall covering down to studs. Remove existing tub to be converted into a shower.
•Framing Repairs: Furnish Materials and Labor to repair and or place any damaged furring, studs, floor joist, rafters, fire stops, and backer boards needed to install grab bars, medicine cabinet, and wall hardware. Perform an inspection of existing plumbing components and repair or replace any damaged or not in compliance with current codes.
•Mixing Valve: Furnish materials and labor to install new shower valve with anti-scold protection at appropriate height and connect shower and spout lines to valve and stub out.
•Exhaust Fan; Provide and install a new 70 CFM exhaust fan in the ceiling with new switch and wiring. Remove any attic insulation from around the fixture. Provide metal exhaust duct to well and/or roof vent with bird screen. Materials and methods must comply with Miami-Dade County regulations.
•Grab Bar; Provide and install, as per manufacture instructions and Building Code requirements. Provide necessary framing and repair the wall surface if damaged during installation of grab bar. Grab bar must be fabricated out of 18 gauge (.049) stainless steel, 1.5-inch tube diameters, brushed, satin stainless-steel finish, 36" by 24" corner unit, mounting flanges welded to the tube to form an integral
unit, and the round cover plate to snaps over the flange to conceal the mounting Snap-On cover plate is fabricated from 22-gauge stainless steel, with a 1-1/2” inch diameter. Must support no less than 250lbs.
•Tile Backer Board; Furnish and install duroc or other approved cementations backing board around shower area from tub to ceiling. Install as per FBC code.
•Sheet Rock; furnish and install 1/2" mold and moisture resistant drywall over furring strips on exterior walls and on wood or metal studs on partition walls outside shower area. Finish drywall or other backing board by tapping, bedding, and sanding new walls.
•Ceramic wall and floor Tile; furnish and install ceramic tiles of US Standard quality, grade 3 on walls to ceiling height in tub and/or shower enclosure area. Include 4'' wainscot on the rest of the walls. Use
matching ceramic bull nose on every visible edge including around the perimeter of window in shower/tub area. Provide slip resistance on floor area. Contractor must coordinate selection of color and type with homeowner. Workmanship includes properly aligned surfaces, grouted, and caulked joints respectively throughout the area.
•Bathroom wall mount fixtures: Furnish and install 5-piece accessory set. Standard fixtures to be Towel bar, toothbrush holder, paper holder, corner soap holder in shower area and soap holder in vanity area. Contractors must coordinate selection with the homeowner. Mid-grade.
•Toilet: Furnish and install a new 17” ADA High Efficiency toilet with a maximum 1.28 gallons per flush manufactured by American Standard, Kohler, Eljer, Briggs or equivalent. Include a plastic or pressed wood seat, plastic supply pipe, shut –off valve, flap valve, metal flush handle, flange, and wax seal.
Unit must have Water Sense Seal. Top of toilet tank to be no more than 1” from back wall. The contractor must coordinate color selection with the owner.
•Shower Pan with faucet and hardware:
Provide and install new American Standard Faucet with all required hardware and fittings. Include relocation of plumbing and drain. All work to comply with the FBC. Contractor to obtain plumbing permits.
•Vanity with top, sink, faucet, and hardware:
Furnish and install Vanity sink with all plumbing components to make unit operational including supply lines, angle stops with flange, and fittings Include set of faucets, ADA Compliant, Lever Handles, Water Sense 1.5 Gallon per Minute, Spout reach minimum 6”, finish to be determined by owner American Standard Kohler, Moen or equal. Provide every plumbing component to make the unit
operational including supply lines and shut-off valves. The contractor is responsible for any additional materials and modifications needed to install this fixture.
•Medicine Cabinet: Replace existing medicine cabinet with a recessed mount Aluminum mirrored cabinet with silver interior 1/2 in. beveled frameless door. Rust-free aluminum construction includes two 1/4 in. glass adjustable shelves, a left or right-hand door hinge as applicable, Minimum dimensions 26 26-inchx 30-inch W x 5 inch. D, to be installed on the side wall.
•Light Fixture: Furnish Materials and labor to install new LED type fixture. New fixture to be mounted at existing location. Provide all the hardware and wiring required to complete installation.
•Painting:
Furnish materials and labor to paint all walls, and ceiling in bathroom area. Make sure to clean all surfaces to be painted. Fill all holes, cracks, and repair any damage to sheetrock. Surface is to be sanded smooth and level before painting. Use paint with an eggshell sheen on walls and satin sheen on wood trim.
Color choice, by owner
$__________
Total Cost: $____________
Technical Certification:
General Building Contractor
Commodities
| Code | Description |
|---|---|
| 90638 | GENERAL CONSTRUCTION SERVICES |
| 96820 | BUILDING CONSTRUCTION |
| 96842 | GENERAL CONSTRUCTION |
Solicitation Package/Addendums
| Type | File Name |
|---|---|
| Package | MCC_7360_RPQ_No_PP-015-MC.pdf |