Solicitation Details - RPQ No 18652-26

Back To Search Solicitations

Title:
Northeast Transfer Station Facility Improvements Phase II - Compactors Bldg Tipping Floor Roof
Opening Date:
7/20/2026 2:00:00 PM
Announcement Info:
Project Description The purpose of the project is to construct a new steel roof deck above the compactors building tipping floor, modify existing steel joists to support additional wind loads, and repair the concrete corbel and masonry wall cracks. Work to be performed includes, but is not limited to, the following: 1. Corbel Repair • Remove the steel travel beam for reuse • Remove the existing corbel • Add reinforcing steel • Form and place new concrete 2. South Façade Crack Sealing • Remove stucco in a limited area • Rake joints in the existing Concrete Masonry Unit (CMU) façade using gouging tools • Insert reinforcing steel and grout the joints • Repair stucco and paint the affected area from corner to corner 3. Retrofit Existing Roof Structure • Remove existing roofing materials • Clean all framing • Install new framing where noted • Prime and paint steel • Install the new roofing system DEADLINE FOR RECEIPT OF RFI QUESTIONS: By 3:00 P.M, EST., on 07/1/2026. Submit Request for Information (RFI's) to [email protected] with copy to [email protected] and [email protected] LICENSE QUALIFICATIONS OF CONTRACTORS: A) All Contractors must hold a current valid State of Florida Certified General Contractor License, as required by the Florida Building Code, for the types of Work covered by the Contract at the time of RPQ submission and maintain the same throughout the duration of the project. The certificate(s) is to be issued by: The State of Florida Construction Industry Licensing Board, pursuant to the provisions of Section 489.115 of the Florida Statute and registered with the Miami-Dade County Building Department or, The Dade County Construction Trades Qualifying Board, pursuant to the provisions of Section 10-3(a) of the County Code. Holders of Miami-Dade County Certificates of Competency must also hold Certificates of Registration issued by the State of Florida Construction Licensing Board, pursuant to the provisions of Section 489.115 or Section 489.117 of the Florida Statutes. B) Proof of such Certificate(s) must be submitted at the time of initial response and maintained current throughout the contract period. The County may request proof of continued certification at any time during the contract period. Failure to provide such proof within five (5) working days from notification by the County shall result in the removal from the contract and the rejection of any current or future RPQ bid submissions. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification:
General Building Contractor, Building Contractor

Commodities
Code Description
90638 GENERAL CONSTRUCTION SERVICES
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package RPQ_No_18652-26.pdf
Package BID_DOCS_18652-26_FINAL-compressed.pdf