Solicitation Details - MCC 7360 RPQ C24-CUA-CALEB-AMR
Back To Search SolicitationsTitle:
Asbestos Material Removal at the Joseph Caleb Auditorium
Opening Date:
5/28/2024 2:00:00 PM
Announcement Info:
Scope of Work:
(Contractor must obtain and submit all permits prior to performing any work).
The work includes the removal and disposal of friable and non-friable materials containing asbestos for the Joseph Caleb Auditorium Front of House Project, as indicated and specified within the reports and the incidental procedures and equipment required to protect workers from contact with airborne asbestos fibers.
The Contractor shall obtain all required permits and shall furnish all labor, materials, services, insurance, and equipment required for the removal and disposal of asbestos-containing materials in accordance with the guidelines or regulations of the responsible state agency, the local agency, EPA, and/or OSHA. The work includes, but is not necessarily limited to the following:
- All preparation of the work areas and areas outside the work areas prior to beginning asbestos removal work.
- Obtain applicable Permitting.
- The Contractor shall be required to remove and reconnect fire alarm and voice control panels located inside the administrative office. The fire
alarm panel shall be active during demolition.
- Removal and disposal of all asbestos materials and waste materials contaminated with asbestos during the process of the work and any other debris generated by this project. Asbestos containing or contaminated material includes but may not be limited to the locations, types and quantities shown in the Bid Form.
- Existing conditions to be verified by the contractor. All footage and locations are approximate. See attached asbestos surveys dated January16, 2015, February 24, 2023, and December 14, 2023.
- Complete cleaning and decontamination of all work areas and contents thereof.
- The selected Contractor will be solely responsible for meeting all Local, State and Federal requirements for the protection of his personnel and the environment during demolition activities. Disposal of hazardous waste is the sole responsibility of the Contractor. Disposal and chain of custody manifests shall be provided to the Owner at the completion of the project.
RFP/RFQ Stipulations:
- Potential bidders shall participate in a mandatory site walk-through.
- Bidders will provide two (2) current references, consisting of existing customers, shall be listed in the proposal. The references listed must be
customers that are currently receiving or have recently received from the bidder the products and services described in this solicitation within
a maximum period of three (3) years. The references must include the customer’s company name, and the name, title, e-mail address, and t
telephone number of the contact person who can verify that the bidder has successfully provided the products and services.
The bidder shall comply with laws, ordinances, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials.
Awarded bidder shall comply with the applicable requirements of the current issue of the following regulatory agencies:
- Title 29, Code of Federal Regulations, Section 1926.1101 (OSHA) Occupational Safety and Health Administration, U.S. Department of
Labor.
- Florida Department of Environmental Protection; Florida Occupational Safety and Health State Plan.
- Title 40, Part 61, Subparts A and B. Regional National Emissions Standards for Hazardous Air Pollutants. (EPA) U.S. Environmental
Protection Agency.
- 40 CFR Part 763 Subpart E , Appendix D.
Technical Certification:
Asbestos
General Building Contractor
Commodities
Code | Description |
---|---|
96820 | BUILDING CONSTRUCTION |
96842 | GENERAL CONSTRUCTION |
Solicitation Package/Addendums
Type | File Name |
---|---|
Package | MCC_7360_RPQ_C24-CUA-CALEB-AMR.pdf |