Solicitation Details - MCC 7360 RPQ MDFRD-821-45-GC

Back To Search Solicitations

Title:
MDFR Fire Station No 45 New Battalion Dorm Bathroom and New Kitchen Remodeling
Opening Date:
9/26/2024 10:00:00 AM
Announcement Info:
Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). CONTRACTOR TO FURNISH THE NECESSARY MATERIALS, EQUIPMENT AND LABOR TO ACCOMPLISH THE FOLLOWING: SCOPE OF WORK: The work, in general consist of One entire Project divided in to 3 Phases – Contractor is required to include in project estimate cost the rental fees of (2) FortsUSA space (20’x20’) for the entire project duration to accommodate MDFR Fire Station staff during construction. Phase 1 consists of complete ADA Bathroom/Battalion Dorm remodeling. The new Dorm/ Bathroom area remodeling inclusive of demolition, fabrication and installation of new partition walls, new doors, & flooring etc. inclusive of new Plumbing, Electrical, Mechanical and Fire Sprinkler work as mentioned and described herein noted on the Project contract drawings FS #45 - Bath & Dorm Plans Phase 1 consisting of six (6) Sheets D-1.0, A-1.0, A-3.0, E-1.0, P-1.0, and FP-1.0. The contractor shall protect active Fire Station with proper visqueen or construction material, for dust & noise protection/control, for each of the Project Phases. Phase 2 consists of complete Kitchen remodeling as mentioned above. The proposed Interior Kitchen space will be totally remodeled to receive a complete makeover with new Terrazo flooring & baseboard, Electrical, Plumbing, Mechanical components as well as (16 Ga.) Stainless Steel cabinets, counter tops and backsplash full height inclusive of New Kitchen equipment’s & appliances as mentioned and described herein noted on the project contract drawings FS #45 – Kitchen Phase 2 consisting of four (4) Sheets D-2.0, A-2.0, A-3.1 and MEP-2.0. The contractor shall protect active Fire Station with proper visqueen or construction material, for dust & noise protection/control, for each of the Project Phases. During this project phase, MDFR will provide usage of temporary movable kitchen for station use. Phase 3 consist of the removal and disposal of existing floor tiles & baseboard, located in the Lobby area, interior corridor and dining/day room to be replaced with new Terrazo flooring and baseboard. FS #45 – Flooring Phase 3 consisting of one (1) Sheet A-3.2. prepared in-house by MDFR-Miami-Dade Fire Rescue, Design & Construction Division. The project Station is located at 9710 NW 58th Street, Fl. 33178. Layout of Work: “Battalion dorm & bathroom, Kitchen Replacement/Construction sequence and schedule is Key in this project. Contractor cannot demolish existing Kitchen space without having the New Kitchen cabinets, equipment’s and appliances lined-up and on scheduled, to be delivered to project site. Existing Kitchen shall be active at all time, except when cabinets and appliances are ready for delivery and installation.. Contractor shall coordinate with kitchen manufacturer/ cabinets, equipment’s and appliances to schedule the delivery and installation at the project site”. Dimensions and specifications indicated on the subject project contract drawings mentioned above, shall be verified by the contractor. The contractor shall notify Miami-Dade Fire Rescue immediately of any deviations or conditions encountered which are contrary to those indicated on the project contract documents. Failure to make notifications shall place responsibility upon the contractor to carry out the work in a satisfactory and workmanlike manner. Contractor to provide labor, material, transportation and equipment and perform all operations required to achieve the completion of the New Interior Kitchen remodeling, Dorm area contract herein specified. Contractor to follow and comply with the requirements listed on the RPQ and contract project plans at all times. Contractor is responsible and required to comply with the Authority Having Jurisdiction (AHJ) and all requirements according to the Miscellaneous Construction Contractor MCC-7360. The work shall be sequenced as necessary to coordinate the work of all subcontractors and suppliers in the most effective manner to diligently complete the work and meet the project schedule as well as the Contract completion deadline. Work required to be accomplished during off hours and weekends as necessary to meet the project schedule or sequence of the work shall be performed by the contractor at no additional cost to owner. If contractor disturbs existing adjacent areas to the proposed scope of work, it will be their responsibility to restore the affected areas accordingly, to its original state. The work includes, but not limited to: The complete Kitchen’s remodeling as noted on the project contract drawings, as well as partial Dorm demolition/ remodeling; need protection and seal off with visqueen plastic all adjacent interior spaces. New partitions are required at new kitchen area and Dorm area. New Kitchen Stainless Steel wall cabinets top/ bottom as well as Stainless Steel (SS) counter tops with Stainless Steel backsplash. Make reference to the Kitchen Equipment schedules and electrical light fixtures as noted on the contract project drawings. All associated Mechanical, Electrical and Plumbing work, to accomplish the New finished kitchen remodeling and Battalion Dorm area. Electrical - Contractor to provide and install All Electrical work associated with the proposed project contract drawings for the Kitchen and Dorm area remodeling. Contractor shall be familiar with the project contract drawings as well as the project site. All Electrical installation work shall comply and meet All standard requirements of the NEC, FBC, and any other applicable Federal, State and local codes, such as local electric utility and telephone company. Mechanical – Contractor to provide and install All Mechanical work associated with the proposed contract project drawings for the Kitchen and Dorm area remodeling. Contractor shall be familiar with the project contract drawings as well as the project site. Plumbing/Piping - Contractor to provide and install All Plumbing work, Fire Sprinkler work/ Propane or Natural Gas work associated with the approved project drawings for the Interior Kitchen Remodeling and Battalion Dorm area. Contractor shall be familiar with the project contract drawings as well as the project site. Plumbing Installation work shall comply and meet all standard requirements of the NFPA, IFGC and NFGC. Shop Drawing’s approval required by MDFR, prior to any fabrication or ordering materials and installation, as well as Notice of Acceptance NOA. The awarded contractor shall provide (5) copies of the proposed Shop Drawings with calculations for review and approval no later than 5-days after receipt of Contract Award & Purchase Order. It is the intension of the Contract Project drawings “Phase 1, 2 and 3, New Kitchen and Battalion Dorm Remodeling”; thereto require that all materials be used in the manner intended by the manufacturer, and that all work be performed by the standards adopted by appropriate trade associated. To this objective, where a particular system, product, material or services is specified, the applicable current standard specifications or recommendations of the manufacturer are thereby incorporated. All construction related debris shall be removed by the contractor daily, as construction debris piling WILL NOT be considered unless properly placed in a construction dumpster. Construction dumpster will be used for loos debris and construction, unless contractor removes the construction debris daily and immediately after each construction phase. Grounds during and after construction shall be clean of ALL related construction debris including nails, scrap materials, etc. Contractor is responsible and shall include the dumpster(s) and /or debris removal (hauling) as part of their project bid. For all other work not listed within this scope, the contractor shall refer to the plans and specifications. Contractor storing of material will only be allowed by contractor written request and MDFR Construction written approval. If grounds are used for storing material, equipment, working area, etc., contractor to return grounds, grass areas to its original conditions; this include any damage occurring during construction phase process. Contractor is responsible for all Interior and Exterior wall paint damage as well as painting new scope of work areas, at the cost of the contractor, including cost of paint and labor to match existing paint colors. Contractor shall provide MDFRD with a three (3) years labor warranty after the FINAL acceptance approval by the Miami-Dade Fire Rescue Department, Project Construction Manager. MDFR Fire Rescue Facility #45 is NOT allowed for contractor’s use, therefore contractor shall consider portable toilets; service & maintain port-o-let and other temporary equipment for contractor’s use. Contractor and their employees are not allowed inside the fire station for No reason other than emergency purposes. MDFR emergency vehicles have the Right-Of-Way at all times. Contractor’s and or Subcontractors are not to block or interfere with MDFR daily operations. Safety and Security Precautions – All on-site contractor’s personnel, shall have identification and or company business attire according to the rules and regulations set by the Miscellaneous Construction Contract7360. Contractor shall be responsible for the storage and protection of materials & equipment’s. Contractor shall provide barriers/ barricades etc. as necessary to prevent entry and protect construction employees/ personnel at all times. Contractor shall be responsible for all safety precautions and accident preventive provisions of OSHA and all applicable safety codes; Including no claims shall be made against (MDFR) by reason of any act of an employee or trespasser. Environmental Protection – Contractor shall be responsible for the prevention of environmental pollution including but not limited to: Dust control to protect and seal off with visqueen plastic all adjacent interior spaces; etc. as a result of construction operations under this project contract.
Technical Certification:
General Building Contractor; Air Conditioning Unlimited; Electrical Contractor; Plumber, Master

Commodities
Code Description
91438 ELECTRICAL
91468 PLUMBING
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package MCC_7360_RPQ_MDFRD-821-45-GC.pdf