Solicitation Details - MCC 7360 RPQ No. MDFRD-858-HAZ-R

Back To Search Solicitations

Title:
RE-ROOFING AND STORE FRONT REPLACEMENT AT MIAMI DADE FIRE RESCUE HAZMAT WAREHOUSE
Opening Date:
9/4/2025 10:00:00 AM
Announcement Info:
SCOPE: 1. Remove and replace approximately 21,000 square feet of built-up roofing. 2. Contractor is responsible for any and all field measurements required to perform the Scope of Work (SOW) herein attached. 3. Contractor will make reference to the asbestos report dated October 20, 2023 (Project #: Project # 20-21102) as part of this SOW and ultimately a condition of the contract with MDFR and permit with the Authority Having Jurisdiction (AHJ). 4. The Contractor is responsible for all cost associated in the performance of the SOW; to include but not limited to labor, materials, equipment, transportation, permitting, insurances, and related engineering required to complete the work and obtain a final inspection with the Authority Having Jurisdiction (AHJ). No provision will be made for price escalation. 5. Contractor to verify slope of deck before tear off of existing roof. Contractor will ensure that new system applied will provide positive drainage to floor drains, thru-the-walls and/or over-flows. 6. Contractor to remove and properly dispose of the existing roofing system and any debris produced in the completion of this contract. 7. Contractor to install new EverGaurd Extreme TPO 60 mil roofing system (see attachment 1) and replace store front (see attachment 2). DESCRIPTION OF ROOFING SYSTEM 1. Remove and properly dispose of the existing roofing system. Prepare the roof deck to receive new insulation (if required) and roof covering. 2. Install insulation as required. Roofing system installed will be in an effort to achieve an R-6 value and a slope of no less the ¼"pr 1’ slope throughout the flat roof area. a. Install new EverGaurd Extreme TPO 60 mil White roofing system by GAF, or approved equal (see attachment 1). b. Energy-efficient, Cool Roof cap sheet or reflective coating will be applied to meet Miami Dade County resolution R-54-18 “Cool Roof.” 3. Acceptable alternatives include Polyglass, Johns Manville and Soprema. Follow manufacturer specification, attached, for cleaning, product attachment application and guarantee/warranty requirements. 4. Roof assembly shall meet UL Class A Fire Rating. 5. New roof drains and strainer cover to be reinstalled after the re-roofing. 6. Remove existing and install new counter flashing at the wall supported decks and roof edges. 7. All counter flashing and edge flashing will be stainless steel. 8. Remove, dispose of and install new gutters and downspouts as needed. DESCRIPTION OF STORE FRONT 1. See Notes and General Notes on attachment 2. 2. Contractor will provide shop drawings for approval before manufacturing. BIDDERS QUALIFICATIONS: a. Bidding contractor is to be pre-approved by the roofing manufacture to install the specified 30-year warranted roofing assembly. Acceptable manufacturers as described above in Section C of this RPQ. b. Bidders must submit a signed letter on the roofing products' manufacturers letterhead with sealed bid submission, stating the applicator/contractor is capable of purchasing material, providing installation as an approved installer, and providing the required warranty at project completion and acceptance. Acceptable manufacturers as described above in Section C of this RPQ. c. Bidders must complete the attached Bidder's Qualifications form and submit a minimum of three (3) satisfactory roofing installations performed by the applicator using the materials and method similar to those specified with bid submission. MANDATORY PRE-BID MEETING / SITE VISIT: Pre-bid meeting has been scheduled for Wednesday, August 13, 2025, at 10 a.m. at Miami Dade Fire Rescue Hazmat Warehouse located at 8010 NW 60 Street, Doral FL 33166. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification:
Building Contractor, General Building Contractor

Commodities
Code Description
90930 BUILDING CONSTRUCTION (NOT OTHERWISE CLASSIFIED)
96820 BUILDING CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package FR_ITB_RPQ_MDFRD-858-HAZ-R.pdf