Solicitation Details - RPQ No 18623-25
Back To Search SolicitationsTitle:
Electrical Service Design For Site Utility Relocation At Resource Recovery
Facility
Opening Date:
2/9/2026 2:00:00 PM
Announcement Info:
Project name: Electrical Service Design for Site Utility Relocation at the Resource Recovery
Facility
Site Address: 6990 NW 97 Ave, Miami, FL 33178
Site Hours of Operation: Monday – Saturday, 7am-5pm
• The contractor shall submit for approval to the Project Manager any requests to work
outside the hours of operation.
Project Overview:
This project involves re-energizing several sites within the Resource Recovery Facility grounds
due to the impending demolition of the existing power plant, which currently supplies power
to all systems. A new electrical service from FPL is required, either from 97th Avenue or 66th
Street. Contractor shall coordinate the primary connection with FPL.
Electrical Power Requirements:
The total estimated power requirement for the entire system is approximately 1,200 amps at
480 volts. This represents the combined demand for all sites within the facility to be
energized.
Electrical Power Distribution for Site Re-Energization
The contractor shall be responsible for the following:
• Coordinate a new FPL electrical service to the site from either 97th Avenue or 66th
Street, including all necessary plans, documentation and permits. FPL contacts will be
given to the awarded contractor.
• Distribute power from the new service point to the following locations, all requiring
480 volts:
a. Lift Station No. 938: Provide a 400-amp connection.
b. Transportation Trailer (North Side of Building): Provide approximately 400
amps, 480 Volts of power.
c. Scale Houses No.1 & No. 2 & Security Station (at plant entrance): Provide a
combined 200-amp, 480 Volts connection.
d. Reworld Maintenance Building: Provide temporary power as needed. (250
amps at 480 Volts)
Additional Requirements:
• All work shall comply with FPL standards and local electrical codes.
• The system must be designed to ensure reliable and safe operation of all connected
facilities.
• Awarded Contractor must coordinate with Reworld, FPL, and County personnel to
establish temporary power requirements as needed to ensure that the installation
work does not affect the plant’s operation. Vendor contacts will be provided upon
award.
Minimum Qualifications and Requirements
Prime Contractor is highly preferred to have the following:
• Highly preferred to have completed five (5) previous projects similar in nature, size
and extent to this project in the last five (5) years.
• Demonstrate that it has full-time personnel with the necessary experience to perform
the projects Scope of Work.
• Provide complete description of capability and history of the Contractor.
• Proof of experience documentation must accompany bid submittal. Any prior
experience of the Prime Contractor’s key personnel will also be considered in meeting
such minimum experience specifications.
DEADLINE FOR RECEIPT OF RFI QUESTIONS: By 4:00 P.M, EST., on 01/26/2026.
Submit Request for Information (RFI's) to [email protected] and
[email protected] with copy to [email protected]
PRIME CONTRACTOR MUST BE ABLE TO PULL MASTER PERMIT.
Contractor must refer to the Request for Price Quotation (RPQ) and associated project
documents for the detail Scope of Work.
Technical Certification:
Electrical Contractor
Commodities
| Code | Description |
|---|---|
| 92531 | ELECTRICAL, PROFESSIONAL SERVICES |
Solicitation Package/Addendums
| Type | File Name |
|---|---|
| Package | RPQ_No_18623-25.pdf |
| Package | BID_DOCS_18623-25_FINAL1.8.26.pdf |
| Package | DRAWINGS_ATTACHMENT_NO.1.pdf |
| Package | PRE-BID_SITE_VISIT_SIGN-IN_SHEET.pdf |