Solicitation Details - RPQ No C2026CCMWR
Back To Search SolicitationsTitle:
Country Club of Miami - Clubhouse and Cart Storage Buildings – Aluminum Impact Window and Doors Replacement
Opening Date:
3/20/2026 2:00:00 PM
Announcement Info:
(Contractor must obtain and submit all permits prior to performing any work.)
CONTRACTOR shall review all documents, specifications, plans, and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to:
1.1) CONTRACTOR shall review all documents, specifications, plans and scope of work provided by the Miami-Dade County Parks, Recreation and Open Spaces Department Construction & Maintenance Division Project Manager for work to be completed.
1.2) CONTRACTOR shall furnish all necessary supervision, labor, tools, materials, and safety equipment required to provide a complete installation of the Country Club of Miami Clubhouse and Cart Storage Buildings – Aluminum Impact Window and Doors Replacement in accordance with the following:
1.3) New Aluminum Impact Resistant Windows to replace existing Windows with approved Miami Dade County NOA or Florida Product Approval to meet Miami Dade County Building Code Requirements.
The Contractor acknowledges and agrees that this scope of work includes the complete replacement of all exterior aluminum impact windows and doors. The Contractor should adhere to the manufacturers’ requirements and installation guidelines; Contractor’s performance will be substantiated to include and provide the following:
• Any and all drawings (shop drawings, engineering, calculations, as-builds’, sketches, etc.).
• Documents, reports, etc. required by the building department for permitting.
• Product specifications, approvals, etc.
• Any and all permitting, and inspection fees required by the Authority Having Jurisdiction (AHJ).
• Written warranties and guarantees (1 year minimum on labor).
• Closeout documents.
• Any additional documentation that can be reasonably anticipated to be included when permitting and performing complete scope of work.
Contractor to submit shop drawings, etc. at Pre-Construction meeting. Once submittals are approved materials are to be ordered immediately. Contractor is fully aware of deadline established and is responsible for any necessary expedited delivery charges. Written delivery date confirmations are to be submitted on a bi-weekly basis.
Contractor to include all drawings, shop drawings, specifications, reports, plans required for permitting by the building department as reflected per owner’s drawings. Contractor will submit product approval and/or manufactures specifications upon pre-construction meeting.
Experience and Qualifications:
• Prime: General Building Contractor, Glass/Glazing
• Sub: Glass/Glazing.
• At least two other comparable completed projects.
Advertise 2/26/2026
Pre-bid Meeting 3/6/2026 at 10:00 AM, mandatory and in person at Country Club of Miami - 6801 NW 186th Street, Miami, FL
RFI Deadline 3/13/2026
Bid Opening 3/20/2026
Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification:
General Building Contractor, Glass/Glazing
Commodities
| Code | Description |
|---|---|
| 91447 | GLASS AND GLAZING |
| 96820 | BUILDING CONSTRUCTION |
Solicitation Package/Addendums
| Type | File Name |
|---|---|
| Package | RPQ_No_C2026CCMWR.pdf |