Solicitation Details - RPQ No PP-014-MC

Back To Search Solicitations

Title:
Peace and Prosperity Rehab Program
Opening Date:
8/14/2026 2:00:00 PM
Announcement Info:
Chavely Ruiz Hernandez 721 SW 97 Court Cir. Miami FL, 33179 305-380-0002 786-484-5038 Exterior Repairs: 1) Re-Roof Complete: Pitched Deck Roofing General Specification All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drips shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters, and all eves drip shall be backed with pressure treated 1X2 furring strips. NOTE #1 Include in your price the 1st 100 sf for replacement of any damaged or deteriorated sheathing or Framing members. NOTE #2 Roof ventilation as per FBC R806.1, R806.2. Replace existing soffit vents with new ones. Ventilation openings shall have a least dimension of 1/16 inch (1.6 mm) minimum and 1/4-inch (6.4 mm) maximum. Ventilation openings having at least dimensions larger Then 1/4 inch (6.4 mm) shall be provided with corrosion-resistant wire cloth screening, hardware cloth, perforated vinyl or similar material with openings having a least dimension of 1/16 inch (1.6 mm) minimum and 1/4-inch (6.4 mm) maximum. NOTE #3 Contractors are responsible for providing all necessary protection from the weather during a phases of roofing operation. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. NOTE #5 Plywood for roof overhang and sheathing, roof sheathing, the FBC R803.2.2 specifies a minimum nominal thickness of 19/32 inch (15 mm). For general roof sheathing, the minimum thickness is 7/16 inches. NOTE #6 Wood Structural Panel Soffits: (FBC) Section 1410.6 Must meet a minimum panel performance category of 3/8, use corrosion-resistant fasteners, and comply with installation guidelines outlined in the code and associated figures, such as placing the strength axis perpendicular to support. Grade and rating: The code requires roof sheathing plywood to be rated for "Exposure” 1," which indicates it is suitable for applications where it will be exposed to moisture during construction. A span rating label must also be present on the panels. Provide smooth face plywood for painting • SPECIFICATIONS FOR ROOF DECK REPAIRS: SPECIFICATIONS FOR SOFFIT AND FASCIA REPAIRS: Replacement of existing fascia and soffit to match existing. No splicing shall be less than 5 ft. in length. All joints shall fall on framing and must be mitered at 45 degrees on runs and corners, no but joints allowed. New wood to be primed and painted. Replace all continuous exhaust vents in soffits for roof ventilation. Contractor shall be responsible for obtaining exact dimensions of all soffits, fascia, and continuous exhaust vents to be replaced. DISCOVERY OF HIDDEN DAMAGE: For any additional or hidden damage discovered after the bid is awarded, the contractor is required to request or call for a joint meeting with the Project Manager to determine the actual quantities of plywood used. Alternatively, the contractor may provide detailed photographic documentation of every plywood sheet installed, clearly numbering each sheet. Re nail the entire deck according to code and replace defective or damaged sheathing with plywood or tongue and groove material as required by code. Include in your bid the first 100 sq. ft. of decking material. Include in your proposal the cost of replacing the first 100 sq. ft. of plywood roof deck. The Project Manager must be informed of the exact day the roof work is scheduled to begin. After installing or replacing plywood sheets, the Project Manager must be given the opportunity to inspect the roof deck before any roof underlayment is applied. 1a) Re-Roof, Complete: Pitched Deck SHINGLES: Remove existing roof cover including accessories and flashing and replace any damaged sheathing as per specifications below. Install two layers of # 30 felt nailed per Code, re-install required accessories, and vent stacks, flashings and edge drip. Install GAF Timberline HD architectural fungus resistant shingles carrying UL label on package and approved by MDC product Control Division; minimum pitch 2-1/2 /12. No Maximum. Install as per the Florida Building Code and manufactures specifications. Provide inspection approval, release of lien, and 1 year for warranty for materials, labor defects and workmanship, and 10-year warranty against defects in workmanship for the installation of the roofing system, shingle color selection by owner. Note: In your cost for repairs and or replacement of damaged fascia, soffit, and attic venting. $ __________ 2) Exterior Door Replacement: Remove existing front entry door. Furnish & Installation of a new, 6 panel, steel, insulated, pre-hung door, with all needed hardware, trim, and lockset. Including the handle/knob and the lock, door to be painted. Owner to select color • Doors must have NOA approved by Miami-Dade County and/or Current FBC approval. • Provide Peep hole as required at front entrance door as per code. • The door is to swing out with code required security hinges. • Provide industry standard trim on outside and inside (casing mold) Miami Dade County, industry-standard trim (molding) for residential construction uses moisture-resistant materials • Patch stucco surface around door to match existing finish. • Paint Door and trim to match existing paint color and finish. NOTE: CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING DOOR OPENINGS FOR SIZES AND EXISTING STRUCTURAL CONDITIONS BEFORE ORDERING AND INSTALLING THE NEW DOORS. Locations: South side: 60” x 80” OS (Code Approved) $ ___________ 3) Window Replacement: * Furnish & install: New horizontal roller, full lite windows with impact resistant glass and gray tint in existing window openings. * The windows shall be made of aluminum with insect screens and locking mechanism. * Windows are to be approved by Miami Dade County “NOA” and or the state of Florida Building Code. * Installed as per manufacturer specifications. * Patch all work and finishes to match existing finishes, on both interior and exterior surfaces. * Remove all debris including “iron bars” and dispose of at an approved site. * Provide approved Building Permit card. Total Window Openings: 8. Front Side East: 53” x 50”, 37” x 26”, 74” x 50” Left Side South: 74” x 50”, 72” x 80” SGD, 53” x 38” Right Side North: N/A Rear Side West: 72” x 80” SGD, 72” x 80” SGD NOTE: CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING WINDOW OPENINGS FOR SIZES AND EXISTING STRUCTURAL CONDITIONS BEFORE ORDERING AND INSTALLING THE NEW WINDOWS. $____________ 4) Exterior Painting Provide Materials and labor to touch-up any paint damage from the installation of new, windows doors, light fixtures, and electrical service. Safely remove all iron security bars from windows. Contractor shall repair all holes left by iron security bar anchors and finish patched areas to match the existing wall surface and texture. All work shall be performed in compliance with applicable safety standards and without causing damage to existing wall surfaces. Pressure clean all surfaces to be painted to remove oil, dirt, grease, fungus, and mold. Fill all holes, cracks, and seams to match the existing finish on all walls, overhang soffits, fascia, and trim surfaces. Apply one coat of primer to all walls, overhang soffits, fascia, and trim surfaces. Follow with two coats of eggshell acrylic latex paint on the same surfaces. Use semi-gloss paint for all wood trims to ensure a durable and attractive finish. Ensure all finished painted surfaces are smooth and even. Use Premium grade brands quality, color to be selected by client Sherwin-Williams Benjamin Moore PPG Behr Farrow & Ball ECOS Paints Rust Oleum 1 Coat of primer, 2 finish coats unless otherwise specified by manufacturer specifications Color Selection: The owner has the option of choosing between two colors for the walls and trim. Locations: All exterior painted surfaces, including but not limited to: Doors Walls Overhang soffits Fascia Trim Contractor Responsibilities: The contractor is responsible for verifying all existing conditions and ensuring proper preparation and application of paint. The contractor shall work in a clean, organized, and professional manner, maintaining the safety and security of the site during the painting process. Contractors are responsible for protecting the surrounding areas while painting a house, both under general construction standards and specific local regulations. $______________ Total Cost: $________________
Technical Certification:
General Building Contractor

Commodities
Code Description
90638 GENERAL CONSTRUCTION SERVICES
96820 BUILDING CONSTRUCTION
96842 GENERAL CONSTRUCTION
Solicitation Package/Addendums
Type File Name
Package RPQ_No_PP-014-MC.pdf