Permitting, Environment and Regulatory Affairs
Where am I? »
Important Global Message
Inspection Codes
| Building |
| 001 |
Final |
| 004 |
Foundation / Monolithic Slab |
| 005 |
Tie-Beam / Reinforcing / Columns |
| 006 |
Slab |
| 007 |
Framing / Fire Stopping / Windows |
| 011 |
Steel Main Drain |
| 057 |
Zoning / Landscaping |
| 071 |
Insulation Inspection |
| 072 |
Roof Truss/Perm Bracing/Sheathing |
| 073 |
Lathing / Fire Wall / Drywall |
| 076 |
Pool Barrier |
| 077 |
Final Zoning Inspection |
| 082 |
Fence Foundation |
| 084 |
Structural Panels In Progress
|
| 085 |
Structural Panels Final |
| 102 |
Buck and Fastener |
|
|
| Roofing |
| 001 |
Final |
| 009 |
Time of Installation |
| 010 |
Tile Placing
|
| 059 |
Tin Cap / Dry In / Base Sheet / Anchor Sheet |
| 063 |
Cap Sheet Inspection Hot Mop / In Progress |
| |
|
| Plumbing / LPGX |
| 001 |
Final |
| 002 |
Rough |
| 015 |
Ground Rough |
| 018 |
Sewer and/or Relay |
| 021 |
Pool Piping |
| 024 |
Solar Rough |
| 032 |
Solar Final |
| 029 |
Pressure Test |
| 064 |
Accessibility Inspection |
| 023 |
Underground |
| 012 |
Temp For Construction (Plum 005) |
| |
|
| Electrical |
| 001 |
Final |
| 002 |
Rough |
| 012 |
Temporary For Construction |
| 013 |
Temporary For Test |
| 023 |
Underground |
| 031 |
Work With |
| 006 |
Slab |
| 048 |
Rough / Slab (For Pools) |
| 074 |
Foundation Grounding |
| 064 |
Accessibility Inspection |
| 041 |
Shop Sign |
| |
|
| Mechanical |
| 001 |
Final |
| 002 |
Rough |
| 023 |
Underground |
| 029 |
Pressure Test
|
| 051 |
Smoke Test |
| 040 |
Initial Elevator Inspection Log |
| 036 |
Smoke Detector Test |
| 038 |
Smoke Evacuation Test |
| |
|
| Other Inspections |
| 030 |
T.C.O (Temp Cert Of Occupancy) Is For All Trades |
| 061 |
T.C.C. (Temp Cert Of Completion) For All Trades |
| 078 |
TCO / TCC Extension |
|
|
| |
|
| Fire |
| 200 |
Hydrants
|
| 201 |
Underground
|
| 202 |
Pressure Test
|
| 203 |
Fire Flow Alarm
|
| 204 |
Dump Acceptance Test
|
| 206 |
Fire Rough
|
| 207 |
Pump Performance Test
|
| 208 |
TCO Inspection
|
| 209 |
Final
|
| 210 |
Standpipe
|
| 211 |
Preliminary
|
| 215 |
Flush
|
Back to Top
Page Last Edited: Wed Sep 28, 2011 11:17:05 AM
building
sect_2