Home > Government > Departments > Strategic Procurement > Projects Under Review > Architectural & Engineering / CBE Projects

Architectural & Engineering / CBE

Listed below are Architectural & Engineering projects and the status of the review for small business measures. A Verification of Availability form is available below (when applicable) and may be submitted any time prior to the posting of the SBD Final Recommendation. Simply download form accompanying the applicable project and return as instructed. Additionally, comments on any project may be sent to [email protected]. SBD reviews all comments and may use information when making goal recommendations as applicable.

Date Received Project Number Project Title Project Package Dept. RCMD SBD Project Breakout Additional Information Verification of Availability SBD Analysis & RCMDs SBD Final RCMD Comments
4/22/25 TAC-N EA-048A Areas USA MIA LLC Corona Neach House Refurbishment at North Termimal D-23 PDF SBE/A&E - No Measure N/A N/A N/A No Measure - SBE/A&E No Measure N/A
4/16/25 20240256 Replacement Bridge No. 874178 Along NE 10 Ave. PDF SBE/A&E - Under Review N/A N/A N/A Under Review 1.50% SBE-A&E goal N/A
4/2/25 A25CR01 Master Plan Replacement Jail - Site 1 PDF SBE/A&E - 100% Goal N/A N/A N/A 100% Goal - SBE/A&E 20% SBE-A&E goal N/A
2/13/25 E25SP01 (2025-001) North Bulkhead Berths 1-6 Realignment Program – Seaport PDF SBE/A&E - 10% Goal N/A N/A N/A 10% Goal - SBE/A&E 10% Goal - SBE/A&E N/A
1/17/25 DB25PR01 (402202-23-002) Tropical Park Multi-Use Recreational Facilities and Equestrian Complex PDF SBE/A&E - 10% Goal N/A N/A N/A 10% Goal - SBE/A&E 15.00% SBE-A&E Goal N/A