Sewage Treatment Plant Permit
A Sewage Treatment Plant Permit is required under the permitting process delegated to Miami-Dade County's Department of Regulatory and Economic Resources Department through the Specific Operating Agreement (SOA) existing with the Florida Department of Environmental Protection (FDEP). This includes the responsibility to determine if a connection, modification, repair, etc., requires a permit.
This permit is necessary for the construction or renewal of the operating permit of sewage treatment plants, including the sewage collection systems and the appurtenant pump stations, located within Miami-Dade County.
Phone Number(s)
-
Permit Assistance

Regulatory and Economic Resources
Lourdes M. Gomez, Director
Stephen P. Clark Center
111 NW 1st Street,
11th Floor
Miami, FL 33128
Herbert S. Saffir Permitting and Inspection Center
11805 SW 26 Street,
Miami, FL 33175
