Hurricane Irma
As we continue our recovery and cleanup efforts, please visit the Emergency website for the latest information on openings and closings in Miami-Dade County.
Construction / CSBE
Construction/CSBE projects and the review status of each are listed below. A Verification of Availability form is available below (when applicable) and may be submitted any time prior to the posting of the SBD Final Recommendation. Simply download form accompanying the applicable project and return as instructed. Comments on any project may be sent to [email protected].
Date Received |
Project Number |
Project Title |
Project Package |
Dept. RCMD |
SBD Project Breakout |
Additional Information |
Verification of Availability |
SBD Analysis & RCMD |
SBD Final RCMD |
Comments |
7/18/24 |
P20119 |
Various Wellfields and Pumping Facilities Multiple Roof Replacement |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/17/24 |
TP-0000018108 |
Metromover Fire Panel Upgrade |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
6/4/2024 |
S-973 |
GOB Basin 0107 (Wastewater Improvements) |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/28/24 |
C39520119001 |
North Trail Park - Splash Pad, Playground Replacement, and ADA Compliance
|
SBE/Cons - No Measure |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/21/24 |
C40180019002AA |
Concord Park Playground Renovation
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/7/24 |
RPQ No. HLMP-23-Shutter |
Hurricane Loss Mitigation Program (HLMP)
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/7/24 |
RPQ No. HLMP-2023-ROOF |
Hurricane Loss Mitigation Program (HLMP)
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/26/24 |
DRM-BBWQ2-2024 |
Biscayne Bay Water Quality Characterization and Pollution Reduction, Phase II
|
SBE/Cons - 1.4% Goal |
N/A | N/A | N/A | 1.4% Goal - SBE/Cons | Under Review | N/A | |
4/24/24 |
20240071 |
Intersection Improvements on SW 162nd Avenue & SW 104th Street
|
SBE/Cons - 11.63% Goal |
N/A | N/A | N/A | 11.63% Goal - SBE/Cons | Under Review | N/A | |
4/9/24 |
S-978 |
Central District Wastewater Treatment Plant Chlorination Facility Hardening
|
SBE/Cons - 9.48% Goal |
N/A | N/A | N/A | 9.48% Goal - SBE/Cons | Under Review | N/A | |
3/25/24 |
S-15152 |
WW Service to Commercial Properties - Green Tech Corridor - S-5 -Gravity, Force Mains and Water Mains
|
SBE/Cons - 2.66% Goal |
N/A | N/A | N/A | 2.66% Goal - SBE/Cons | Under Review | N/A | |
3/12/24 |
RPQ No. TP-0000021555 |
Traction Power Switchgear Replacement
Project Phase IV |
SBE/Cons - No Measure |
N/A | N/A | N/A | No Measure - SBE/Cons | Under Review | N/A | |
2/20/24 |
V008F-1 |
MIA Cc F Refurbishment - Checkpoint Relocation Imrpovement Works Demolition Scope
|
SBE/Cons - No Measure |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
2/14/24 |
20230196 |
North Miami Ave. Bridge No. 847035 Replacement Over C-8 Canal
|
SBE/Cons - 1.28% Goal |
N/A | N/A | N/A | 1.28% Goal - SBE/Cons | Under Review | N/A | |
10/23/23 |
20230146 |
Paving Markings Contract
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
10/18/23 |
RPQ No. MDFR-785-VAR-FA |
MDFR Fire Alarm System upgrades - 2023 Florida Legislative Funding
|
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
10/17/23 |
TAC-N-CA-124A |
AA MIA Next Gen Kiosk at Terminal D 2nd Floor
|
SBE/Cons - No Measure |
N/A | N/A | N/A | No Measure - SBE/Cons | Under Review | N/A | |
10/17/23 |
TAC-N-CA-030A |
The Bar Refurbishment and Extensions S Terminal Food Ct. Post Security
|
SBE/Cons - 14.00% Goal |
N/A | N/A | N/A | 14.00% Goal - SBE/Cons | Under Review | N/A | |
10/17/23 |
W-955 |
South West Wellfield Electrical Distribution Improvements for Raw Water Well
|
SBE/Cons - 12.25% Goal |
N/A | N/A | N/A | 12.25% Goal - SBE/Cons | Under Review | N/A | |
10/17/23 |
S-20076 |
Two-Year County-Wide Contract for Rehabilitation of Sanitary Sewer by the Cure-in-Place Pipe
(CIPP) Method with County Option to Renew for an Additional One-Year
|
SBE/Cons - No Measure |
N/A | N/A | N/A | No Measure - SBE/Cons | Under Review | N/A | |
10/17/23 |
20230169 |
Historic Bridge No. 874129 and 874130 Rehabilitation and Painting |
SBE/Cons - 3.5% Goal |
N/A | N/A | 3.5% Goal - SBE/Cons | Under Review | N/A | ||
10/13/23 |
TP-0000017936 |
Installation of Electrical Vehicle Charging Stations at the Lehman Center |
SBE/Cons - 17.2% Goal |
N/A | N/A | N/A | 17.2% Goal - SBE/Cons | Under Review | N/A | |
10/10/23 |
20230197 | Biscayne Shores Pump Station Retrofit Nos. 109 & 110 and MIC Stormwater Pump Station Trash Rack Repair |
SBE/Cons - 1.43% Goal |
N/A | N/A | N/A | 1.43% Goal - SBE/Cons | Under Review | N/A | |
9/29/23 |
W-16904 |
CDWWTP New Materials Management Building and Storage Areas |
SBE/Cons - 10.64% Goal |
N/A | N/A | N/A | 10.64% Goal - SBE/Cons | Under Review | N/A | |
9/25/23 |
LC-RENO-23 |
Roof Replacement, and New Impact Resistant Windows, Doors and Storefront at the Lemon City Branch Library |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review - SBE/Cons | Under Review | N/A | |
9/15/23 |
C23-MDPLS-02-ML-ESP |
Construction Services for Exterior improvements and Interior Renovation of the Miami Lakes Branch Library |
SBE/Cons - 27.33% Goal |
N/A | N/A | N/A | 27.33% Goal - SBE/Cons | Under Review | N/A | |
9/15/23 |
007-E15/02-NOVA |
Pre-Construction Assessment at the Amelia Earhart Park, located at 200 W 74 PL, on behalf of Parks, Recreation and Open Spaces (PROS) |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | Under Review | N/A | |
9/6/23 |
20233HBPSWR |
Homestead Bayfront Park - Sewage Treatment Replacement | SBE/Cons - Under Review | N/A | N/A | N/A | Under Review | Under Review | N/A | |
9/5/23 |
MCC-Y145A (MCC-9-18) |
Miami-Homestead General Aviation Aiport (Security Fence Gate) | DBE Goal - 54% | N/A | N/A | N/A | 54% Goal - DBE | Under Review | N/A | |
8/24/23 |
50030115001 |
Continental Park - Site Remediation Project |
SBE/Cons - 1.5% Goal |
N/A | N/A | N/A | 1.5% Goal - SBE/Cons | Under Review | N/A | |
8/24/23 |
601805-20-004 |
JL (Joe) and Enid W. Demps Park Playground Replacement Rebid |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | Under Review | N/A | |
8/23/23 |
Arena-8-23-2023-C |
Construction Manager at Risk Services - Removal and Replacement of Seating Bowl LED Displays and Broadcasting Enhancements Project |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/21/23 |
S-16302 |
Dredging of the Southwest Wellfield South Lagoon to Remove Calcium Carbonate Residual |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | No Measure | Under Review | N/A | ||
8/18/23 |
S-20074 |
Two-Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity mains, with County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons - 6% Goal |
N/A | N/A | 6% Goal - SBE/cons | Under Review | N/A | ||
8/15/23 |
C23-MDPLS-01-GOB-ESP |
Renovation of the South Dade Regional Libray |
SBE/Cons - 27% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/15/23 |
TAC-R #CA-074A |
AAR Hangar Expansion |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
8/15/23 |
TAC-N BA-021B |
FOF Red Road Tenant Improvement |
SBE/Cons - 12.21% Goal |
N/A | N/A | N/A | 12.21% Goal - SBE/Cons | Under Review | N/A | |
8/14/23 |
RPQ No. 20230159 |
Roadway Resurfacing - Multiple Sites |
SBE/Cons - Trade Set-Aside |
N/ | N/A | N/A | Trade Set-Aside - SBE/Cons | Under Review | N/A | |
8/14/23 |
RPQ No. 20230158 |
Roadway Resurfacing - Multiple Sites |
SBE/Cons - Trade Set-Aside |
N/A | N/A | N/A | Trade Set-Aside - SBE/Cons | Under Review | N/A | |
8/9/23 |
S-967 |
Site Preparation (NT-2B) North District Wastewater Treatment Plant |
SBE/Cons - 2.99% Goal |
N/A | N/A | 2.99% Goal - SBE/Cons | Under Review | N/A | ||
7/31/23 |
RPQ No. MDFR-776-VAR-GC |
MDFR Roof and OPenings Replacement (Stations |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A | No Meassure (Federally Funded) - SBE/Cons | Under Review | N/A | |
7/28/23 |
X010A |
Miami/Opa-Locka Executive Airport (OPF) Run Up Pad |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/28/23 |
X005A |
OPF Blast Fence |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
7/27/23 |
C23-MDPLS-01-GOB-ESP |
Request to Advertise for Construction Services for the Interior Renovation of the South Dade Regional Library |
SBE/Cons - 27% Goal |
N/A | N/A | N/A | 27% Goal - SBE/Cons | Under Review | N/A | |
7/21/23 |
2022-010 (under DB23SP01) |
Design-Build Services for the New Cruise Terminal G Program |
SBE/Cons - 8.92% Goal |
N/A | N/A | 8.92% Goal - SBE/Con | Under Review | N/A | ||
7/21/23 |
RPQ No. TP-0000017889 |
Upgrade Chiller Units at William Lehman Center |
SBE/Cons - 10% Goal |
N/A | N/A | N/A | 10% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-D (WA 2024-4HAC) |
Event Level Executive Rooms Refresh |
SBE/Cons - 13% Goal |
N/A | N/A | N/A | 13% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-C (WA 2024_3)
|
Event Level Restroom Refresh |
SBE/Cons - 9% Goal |
N/A | N/A | N/A | 9% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-B (WA 2024-2HAC)
|
Event Level Weight Room Refresh |
SBE/Cons - 13% Goal |
N/A | N/A | N/A | 13% Goal - SBE/Cons | Under Review | N/A | |
7/20/23 |
Arena-7-20-2023-A (WA 2024-1HAC)
|
Mez Level Offices Restrooms Refresh |
SBE/Cons - 11% Goal |
N/A | N/A | N/A | 11% Goal - SBE/Cons | Under Review | N/A | |
7/19/23 |
S-16030 |
Upgrade of Pump Station 0300 |
SBE/Cons - 2% Goal |
N/A | N/A | N/A | 2% Goal - SBE/Cons | Under Review | N/A | |
6/28/23 |
TAC-N CA-073A |
PS MIA at Bldg. 874 – The Private Suite MIA, LLC, Restoration of Old |
SBE/Cons - 10% Goal |
N/A | N/A | N/A | 10% Goal - SBE/Cons |
Under Review |
N/A | |
6/22/23 |
20230123 |
Drainage Improvements Multiple Sites |
SBE/Cons - Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
6/20/23 |
C50200121002 |
Ferguson Park - Fitness Court and Shelter |
SBE/Cons - 6.06% Goal |
N/A | N/A | N/A | 6.06%Goal - SBE/Cons |
Under Review |
N/A | |
6/16/23 |
MCC-AB050A |
MIA - Building 3050 Demolition - STE Enabling |
SBE/Cons - Trade Set-Aside |
N/A | N/A | N/A | Trade Set-Aside - SBE/Cons |
Under Review |
N/A | |
6/15/23 |
TAC-N-BA-088A |
Aero Miami 1/LATAM Secutiry Camera Update ar Bldg. 709 & 710 |
SBE/Cons - 16% Goal |
N/A | N/A | N/A | 16% Goal - SBE/Cons |
Under Review |
N/A | |
6/15/23 |
RPQ No. 20230118 |
Intersection Improvements Along NW 18th Ave. from NW 62nd St to NW 71 St. |
SBE/Cons - 14.49% Goal |
N/A | N/A | N/A | 14.49% Goal - SBE/Cons |
Under Review |
N/A | |
6/7/23 |
RPQ No. 284052 |
Multiple Parks Swimming Pool and Splashpad Repairs - North of Tamiami Trail |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
6/7/23 |
RPQ No. 284053 |
Multiple Parks Swimming Pool and Splashpad Repairs - South of Tamiami Trail |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/31/23 |
ZC2023ATBR |
Zoo Miami - Aviary Temple Building Renovations |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/30/23 |
592801-17-003 GOB ESP |
Chuck Pezoldt Park Recreation Center & Library |
SBE/Con - Trade Set-Aside |
N/A | N/A | N/A | Set-Aside | Under Review | N/A | |
5/24/23 |
P16062 |
Upgrade of Sewage Station #0064 & Installation pf 8inch FM From PS-0064 running north on Halissee St. |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/24/23 |
282487 |
Multiple Parks North of Tamiami Trail - Court Resurfacing |
SBE/Con – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
5/24/23 |
282488 |
Multiple Parks South of Tamiami Trail - Court Resurfacing |
SBE/Con – No Measure |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/23/23 |
P0272 |
LineStop for 42 Inch CIP at Pump Station No. 2 |
SBE/Con – No Measure |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/22/23 |
RPQ No. MDFRD-767-10-C |
Concrete Apron Removal and Replacement at MDFR Station 10 |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/17/23 |
401403-19-001 |
Boardwalk Renovation and Nature Center Signage |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure |
Under Review |
N/A | |
5/9/23 |
W-945 |
Alexander Orr Jr. Water Treatment Plant Lime Slaker Replacement Project |
SBE/Con – 2.20% Goal |
N/A | N/A | N/A | 2.20% SBE-Con Goal |
Under Review |
N/A | |
5/4/23 |
RPQ No. 20230013 |
Bridge Replacement at SW 136th St Over Canal C-100A (Bridge No. 874420) |
SBE/Con – 2.9% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/1/23 |
C2023CDESHR (50250120002) |
Charles Deering Estate – Stone House Repairs |
SBE/Cons – 10.48% SBE-Con |
N/A | N/A | N/A | 10.48% SBE-Con Goal | N/A | ||
4/27/23 | SURFWHLOAD-DOCK | Surfside Evidence Warehouse Loading Dock repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
4/20/23 | TAC-N-AC129B Con | KOPF Acquisitions Phase 1B |
SBE/Cons – 7.68% Goal |
N/A | N/A |
7.68% SBE-Con Goal 10% CWP Goal |
N/A | |||
4/20/23 | MDFRD-757-23-RW | MDC Fire Rescue HMGP Wind Retrofit Project at Station 23 MDFRD-757-23-RW |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/19/23 | 20230072 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230071 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230070 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230069 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230068 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/19/23 | 20230067 | Pre-Event Contracts for Emergency Relief Contracts for 2023 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/18/23 | TAC-N-AC129A Con | KOPF Acquisitions Phase 1A |
SBE/Cons – 11.44% Goal |
N/A | N/A | N/A | 11.44% SBE-Con Goal | N/A | ||
4/17/23 | CIP227A-DTPW22-CT | South Miami-Dade Electric Bus Maintenance Facility |
SBE/Cons – 20.00% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
4/7/23 | RPQ No. MDFRD-757-23-RW | MDC Fire Rescue HMGP Wind Retrofit Project at Station 23 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
4/7/23 | 22230223001 | Haulover Park - Pickleball Courts |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | 20.44% SBE-Con Goal | N/A | |||
3/31/23 | IRP338-DTPW23-CT | Construction Services for the Third Rail Isolation Disconnect Switch Replacement |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
3/30/23 | TP-0000008233-R | Lehman Curve N41 Realighnment |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
3/28/23 | TAC-N-BA-086A | Aero Miami LATAM Fire Suppression and updates at Warehouse Bldg. 709 |
SBE/Cons – 9% Goal |
N/A | N/A | N/A |
9% SBE-Con Goal 10% CWP Goal |
N/A | ||
3/28/23 | 019-E15/03-SCS (E15-RER-03) | Tank Closure Assessment Report (TCAR) at the Coral Way Bus Maintenance Facility |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/27/23 | RPQ No. 2023GRPBR | Greynolds Park – Bridge Repairs |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
13.07% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
3/24/23 | RPQ No. 18497-23 | DSWM Repair of Hoppers, Chutes and Compactors at Northeast Transfer Station |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/24/23 | RPQ No. 18496-23 | DSWM Repair of Hoppers, Chutes and Compactors at Central Transfer Station |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/24/23 | 2022-MDFR-CR-OR-HQ | MDFR Crandon Park Ocean Rescue Headquarters |
SBE/Cons – 10% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/24/23 | 20220132 | Intersection Improvements to NE 2 Ave. and NE 36 St. |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
3/20/23 | RPQ No. 76986 | PHCD WORK-ORDER CONTRACT 2023 – South Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/20/23 | RPQ No. 76987 | PHCD WORK-ORDER CONTRACT 2023 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/20/23 | RPQ No. 76988 | PHCD WORK-ORDER CONTRACT 2023 – North Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/16/23 | RPQ No. 20230052 | Intersection Improvements Contract – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 and Trade Set-Aside 10.00% CWP Goal |
N/A | ||
3/16/23 | GS-35F-364BA | LCP Tracker for SBD |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/16/23 | S-976 | HVAC Improvements Package “D” – Main Switchgear Building #2 and Polymer Building |
SBE/Cons – 10.13% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
3/13/23 | WAP-056 | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
3/10/23 | DRM-MCH-2023 | Secondary Canal Maintenance Mechanical Harvesting of Drainage Canals |
SBE/Cons – 6% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
3/10/23 | 60060318001 GOB ESP | South ridge Park- Community Aquatic Center |
SBE/Cons – 11.80% Goal |
N/A | N/A |
11.80% SBE-Con Goal 10% CWP Goal |
N/A | |||
3/10/23 | 20220215 | Bridge Repair at SW 57 Avenue - Bridge No. 874251 |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | N/A | |||
3/8/23 | MDFRD-754-VAR | HMGP - MDFR Roof and Openings Replacement |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
3/8/23 | CIP271-DTPW23-CT | Metrorail Martin Luther King (MLK) Parking Garage Emergency Demolition |
SBE/Cons – 20% Goal |
N/A | N/A | N/A |
20% SBE-Con goal 10.00% CWP goal |
N/A | ||
3/7/23 | 20220176 | Bear Cut Bridge No. 874544 Rehab |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
2/21/23 | RPQ No. 20230030 | Guardrail – Multiple Sites |
No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
2/17/23 | S-20069 | CDWWTP – Plant 1 and 2 Primary Clarifiers Rehab (CD 2.07 and 2.08) |
SBE/Cons – 7.82% Goal |
N/A | N/A | N/A | 7.82% SBE - Con goal | N/A | ||
2/16/23 | TAC-N-AB-011A | Delta Air Lines Sky Club Expansion at Concourse H |
SBE/Cons – 15.11% Goal |
N/A | N/A |
15.11% SBE-Con Goal 10% CWP Goal |
N/A | |||
2/14/23 | TAC-N-BA-037A | Homestead Executive Jet Center at X51 New Aircraft Storage Hangar & Associated Ramp/Apron |
SBE/Cons – 15.11% Goal |
N/A | N/A |
16% SBE-Con Goal 10% CWP Goal |
N/A | |||
2/13/23 | WAP-055 | Weatherization Assistance Program |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
2/10/23 | MCC AC007A (MCC-9-18) | Building 3030 1st Floor D Wing Tenant Relocation MCC AC007A (MCC-9-18) |
SBE/Cons– Trade Set-Aside |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
2/3/23 | TAC-N-AB-081A | Johnston and Murphy Refurb Project |
SBE/Cons – 15% Goal |
N/A | N/A | 15% SBE-Con Goal | N/A | |||
1/31/23 | S-16376 | Lateral Expansion Program |
SBE/Cons – 16.34% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
1/27/23 | RPQ No. 20230013 | Bridge Replacement at SW 136TH St Over Canal C-100A |
SBE/Cons – 2.14% Goal |
N/A | N/A | N/A | 2.24% SBE-Con Goal | N/A | ||
1/26/23 | ZC2023MD | Zoo Miami – Monorail Removal and Renovation |
SBE/Cons – 5.80% SBE- Con Goal |
N/A | N/A | N/A | 5.80% SBE-Con Goal | N/A | ||
1/25/23 | RPQ No. 76721 | PHCD Vacant Unit Preparations 2023 – Contract 1 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
1/25/23 | RPQ No. 76722 | PHCD Vacant Unit Preparations 2023 – Contract 2 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
1/25/23 | DB23-PHCD-01 | Development of Senior Housing at the Westchester Regional Library Site |
SBE/Cons – 20% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
1/24/23 | W-951 | Alexander Orr Water Treatment Plant West High Service Pump Room Electrical Upgrade |
SBE/Cons – 10.42% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
1/24/23 | TAC-N-BA-110A | Enterprise Holdings – Signage Replacement and Wayfinding |
SBE/Cons – 0% Goal (Justification from the tenant) |
N/A | N/A | N/A | No Measure | N/A | ||
1/17/23 | W220034 | SBE/Cons – 5.96% Goal |
SBE/Cons – 5.96% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
1/13/23 | S-985 | Green Technology Corridor Wastewater Collection, Transmission and Water Distribution System Expansion for S-2 Basin; Phase 2, West side of NW 27th Avenue |
SBE/Cons – 6% Goal |
N/A |
7.50% SBE-Con Goal 10.00% SBE-CWP Goal |
N/A | ||||
1/12/23 | PDC-W22002 (FEMA No. 33489) | Roof Replacement/Waterproofing of MDPD Kendall Station 5 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
1/11/23 | RPQ No. 76609 | 100% SURTAX Funded Project New Construction of One CBS One Story Duplex (2 dwelling units) |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
1/5/23 | 2022-017 | Seaboard Cargo Yard Sewer Main Replacement |
SBE/Cons – 9.28% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
12/22/22 | 21300117001 GOB ESP | Amelia Earhart Park Recreation Center and Park Improvements |
SBE/Cons – 7.00% Goal |
N/A | N/A | N/A |
10.09% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
12/22/22 | TAC-N-AB-028A | Jackson Square/ Chick-Fil-A |
SBE/Cons – 25% Goal |
N/A | N/A | N/A |
25% SBE-Con Goal 10% CWP Goal |
N/A | ||
12/21/22 | TAC-N-AC-130A (AC-130A) | DHL MIA Hub Bonded holds Mezzanine Expansion at Bldg. 716 |
SBE/Cons – 4.37% Goal |
N/A | N/A | N/A | 4.37% SBE-Con Goal | N/A | ||
12/21/22 | WAP-054 | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
12/21/22 | S-949A | Ocean Outfall Legislation Program, Construction Package CT-3C-A, Electrical Distribution Building 2 (EDB-2) |
SBE/Cons – 7.35% Goal |
N/A | N/A | 7.35% SBE-Con Goal | N/A | |||
12/16/22 | RPQ No. TP 0000011620 | Roof Replacement at Passenger Transportation Regulatory Division Building |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
11/14/22 | RPQ 75085 | Biscayne Plaza Exterior Repairs and New Generator |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
10/31/22 | PDF-W20003 | High Security Vault for the Miami-Dade Police Department |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
10/25/22 | 20220180 | Joint Participation (JPA) between Miami-Dade County and the Village Key Biscayne for the Intersection Improvements of Crandon Boulevard |
SBE/Cons – 20% Goal |
N/A | N/A | N/A | 23.90% SBE-Con Goal | N/A | ||
10/25/22 | TAC-R-W057A | Miami International Airport Fuel Facility Tank 21 – Water Supply |
SBE/Cons – 16% SBE-Con 10% CWP Goal |
N/A | N/A |
16% SBE-Con Goal 10% CWP Goal |
N/A | |||
10/24/22 | X009A | Miami Opa-Locka Executive Airport (OPF) Runway 09L-27R Rehabilitation |
SBE/Cons – 7.11% DBE Goal |
N/A | N/A | 7.11% DBE Goal | N/A | |||
10/21/22 | P15703 | Installation of Protective Articulated Concrete Mats for Central District and North District and North District Plant Outfalls |
SBE/Cons – No Measure (Insufficient Availability) SBE/G&S – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
10/19/22 | TAC-N-AC-034A | The Rental Car Center – Stormwater Drainage Project |
SBE/A&E – 0.0% Goal |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
10/18/22 | MDAD-CIP-AA018B | MIA Concourse H Glazing, Curtain Wall Assessment & Corrective Action |
SBE/Cons – 17.46% SBE-Con Goal |
N/A | N/A | N/A |
17.46% SBE-Con Goal 10% CWP Goal |
N/A | ||
10/14/22 | P16141 | Alex Orr Wells 1 to 10 Transformer Upgrades |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | 9.98% SBE Cons Goal | N/A | ||
10/14/22 | TP-0000008807 | Metrorail Public Address System Replacement |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
10/7/22 | S-984 | Water and Wastewater Services to Commercial Properties - Green Tech Corridor – Basin S-2, Phase 1, East Side of NW 27th Avenue |
SBE/Cons – 10.89% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
10/7/22 | RPQ No. 376954-R | Installation of a Horizontal Fall Arrest System |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
10/7/22 | W-953 | Two-Year County Contract for WASD Pavement Restoration, with County Option to Renew for an Additional Year Project A (2023-2025 Year) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
10/5/22 | 412223 R1 | Car Cleaner Platform Replacement Project |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
10/4/22 | TWH-73420-D8 | 100% SURTAX Funded Project New Construction of One CBS One Story Duplex (2 dwelling units) |
SBE/G&S – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
9/12/22 | S-971 | Furnish and Install 16-inch Sanitary Force Main along W, N & E Country Club DR from William Lehman Causeway to Yacht Club Way |
SBE/Cons – 9.20% Goal |
N/A | N/A | 9.20% SBE-Con Goal | N/A | |||
8/17/22 | 20220141 | Intersection Improvement at SW 57 Ave. and SW 72 St., FM# 449752-1 |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
8/17/22 | 14973-22 | Construction Services with U.S. Department of Homeland Security Federal Emergency Management Agency (FEMA) Funds |
SBE/Cons– No Measure (Federally Funded) |
N/A | N/A | Under Review |
Under Review |
N/A | ||
7/27/22 | 20220136 | Culvert Replacement at SW 132 Avenue and C-100 Canal |
SBE/Cons – 4.5% Goal – Concrete, Paving Markings and Sodding |
N/A | N/A | N/A | 4.50% SBE-Con Goal | N/A | ||
7/25/22 | MDFRD-731-CAM | MDFR FIRE STATION INTEGRATED SECURITY MANAGEMENT SYSTEM |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
7/25/22 | BA-070A | Spirit Airlines Inc. requests approval to make minor modifications to spaces on the 3rd floor of Terminal G |
SBE/Cons – 24% Goal |
N/A | N/A | 24.49% SBE-Con Goal | N/A | |||
7/22/22 | TAC-N-BA-021AC | FOF Red Road Project Vacant Land on NW 57 Ave btwn NW 140 AND 142 St. at OPF |
SBE/Cons – 10.53% Goal |
N/A | N/A | N/A | 14.43% SBE-Con Goal | N/A | ||
7/20/22 | W-949 | John E Preston Water Treatment Plant High Service Pump Station Electrical Upgrades |
SBE/Cons – 3.60% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
7/19/22 | MCC-D105C-1A | MIA – Dolphin – Flamingo – 40 Year Re-Certification Repairs |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Packages A, C, and D Trade Set Aside Package B - No Measure 10% CWP Goal |
N/A | ||
7/18/22 | BA-004A | HMS Host Starbuck’s Refurbishment MIA Gate J7 |
SBE/Cons – 28.82% Goal |
N/A | N/A | 28.82% SBE-Con Goal | N/A | |||
7/18/22 | BA-006A | HMS Host Starbuck’s Refurbishment MIA Gate H4 |
SBE/Cons – 27.25% Goal |
N/A | N/A | 27.75% SBE-Con Goal | N/A | |||
7/18/22 | BA-007A | HMS Host Starbuck’s Refurbishment MIA Gate D10 |
SBE/Cons – 28.99% Goal |
N/A | N/A | N/A | 28.99% SBE-Con Goal | N/A | ||
7/15/22 | W-952 | Alexander Orr Water Treatment Plant Sodium Hypochlorite Feed & Storage Facility |
SBE/Cons – 7.99% Goal |
N/A | N/A | Under Review |
Under Review |
N/A | ||
6/29/22 | W200011 | Zelda Glazer Soundscape Project |
SBE/Cons – 18.84% Goal |
N/A | N/A | N/A | 18.13% SBE-Con | N/A | ||
6/24/22 | DRM-PILOT-2022 | Biscayne Bay Quality Characterization and Pollution Reduction |
SBE/Cons – NO Measure |
N/A | N/A | N/A | No Measure | N/A | ||
6/23/22 | HI-51060118003B | Hurricane Irma – Matheson Hammocks Wading Beach Renovations |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | NO Measure | N/A | ||
6/22/22 | 2022HOPC | Highland Oaks Park – Pickleball Court |
SBE/Cons – 3.76% Goal |
N/A | N/A | 3.76% SBE-Con Goal | N/A | |||
6/21/22 | RPQ No. 1847-22 | North Dade Landfill LFG System |
SBE/G&S – Under Review |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
6/17/22 | TP-0000008861 | Secondary Unit Substations A & B replacement at Metrorail Stations |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
6/13/22 | RFQ 22-19175-KG(r) | LTCC Lobby Restroom Renovation |
SBE/Cons – 100% Level 1 set-aside |
N/A | N/A | N/A | Level 1 Set Aside | N/A | ||
6/7/22 | S-961 | New Regional Fats, Oils, and Grease (FOG) Facility at the South District Wastewater Treatment Plant |
SBE/Cons – 5.05% Goal |
N/A | Under Review |
Under Review |
N/A | |||
6/1/22 | RPQ No. 2022MPB1 | Tamiami Park Sport Courts Renovations for Pickleball |
SBE/Cons – 19.51% Goal |
N/A | N/A | N/A | 19.51% SBE-Con Goal | N/A | ||
5/26/22 | MCC-T012A-3 | MIA – Concourse H Vertical Circulation Core Modifications |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Package (A - D, F&G) - Trade Set Aside Package E - No Measure 10% CWP goal |
N/A | ||
5/24/22 | MCC-X010A | Opa-Locka Executive Airport Engine Run-Up Pad |
DBE – 17% Goal |
N/A | N/A | 17% DBE Goal | 17% DBE Goal | N/A | ||
5/23/22 | C21230420001 | Jeb Estates Park – Playground and General Plan Build-Out Project |
SBE/Cons – 24.17% Goal |
N/A | 24.01% SBE-Con Goal | N/A | ||||
5/23/22 | TP-0000008233 | Lehman Curve N41 Realignment |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/23/22 | RPQ No. 71286 | PHCD Work-Order Contract 2022 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/23/22 | RPQ No. 71285 | PHCD Work-Order Contract 2022 – South Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/23/22 | RPQ No. 71291 | PHCD Work-Order Contract 2022 – North Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/20/22 | I190086 | LightSpeed – Re-Roof and HVAC Replacement |
SBE/Cons – Under Review |
N/A | N/A | Under Review |
Under Review |
N/A | ||
5/20/22 | RPQ No. 71184 | Arthur Mays Brick Up 2 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | N/A | |||
5/11/22 | 18310-21 | Department of Solid Waste Management’s (DSWM) West Transfer Station Tipping Floor and Improvements |
SBE/Cons – Under Review |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
5/11/22 | RPQ No. 70899 | PHCD Boiler Inspections, Preventive Maintenance & Repair Services & Parts |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/9/22 | RPQ No. 20220084 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings and signage: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American Disabilities (ADA) items) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/9/22 | RPQ No. 20220085 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings and signage: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American Disabilities (ADA) items |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
5/9/22 | W-945 | Alexander Orr Jr. Water Treatment Plant Lime Slaker Replacement Project |
SBE/Cons – 2.20% Goal |
N/A | N/A | N/A | 2.20% SBE-Con Goal | 2.20% SBE-Con Goal | N/A | |
5/4/22 | S-981 | HVAC Improvements – Package “C” Effluent Pump Station Back Up Chiller Addition, North Filter Building Substation 23 and 24, and South Filter Building Substation 27 and 28F. |
– SBE/Cons – 9.50% Goal |
N/A | N/A | 15.29% SBE-Con Goal | N/A | |||
5/4/22 | MCC AA046A | MIA – Lower Concourse E and Satellite E 3rd Floor APMPlatform Annunication |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Package A & B Trade 10% CWP Goal |
N/A | ||
5/3/22 | RPQ No. 18297-22 | DSWM Central Transfer Station Tipping Floor Project – Phase II |
SBE/G&S – Under Review |
N/A |
Under Review |
Under Review |
N/A | |||
5/3/22 | 259734-A | Multiple Parks Swimming Pool and Splashpad Repairs – North of Tamiami Trail |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/2/22 | TAC-N-BA-021A | FOF Red Road Project Vacant Land on NW 57th Ave btwn NW 140 and 142 St. at OPF |
SBE/Cons – TBD |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/14/22 | 2021-010 | Construction Contract Services for Shore Power For Terminals |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/6/22 | 20220040 | Roadway improvements to NE 151 Street from East of Railroad Tracks to Bay Vista Boulevard |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/6/22 | 20210092 | Roadway improvements to NE 151 Street from East of Railroad Tracks to Bay Vista Boulevard |
SBE/Cons – 6.36% Goal |
N/A | N/A | N/A |
6.11% SBE-Con Goal |
N/A | ||
4/5/22 | BA-016A | Frontier Airlines build out their crew rooms on 2nd and 3rd floor of CC F |
SBE/Cons – 30.89% |
N/A | N/A | N/A |
30.89% SBE-Con Goal 10% CWP Goal |
N/A | ||
3/28/22 | AC-100A | HMS Host – Peet’s Coffee – MIA North Terminal CcD Gate 51 Hold room |
SBE/Cons – 18.64% Goal |
N/A | N/A | N/A |
0.00% SBE-A&E 15.35% SBE-Con 10% CWP Goal |
N/A | ||
3/28/22 | TAC-N-AB023A | OPF – Off-Lease Only LLC Lot “I” Install 2-Security Booth and 2-Fuel Tanks |
No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/28/22 | TAC-N-AA175A | OPF – Off-Lease Only-Interior Renovations to Building “J” |
20% SBE-Con Goal |
N/A | N/A | N/A |
20% SBE-Con Goal |
N/A | ||
3/28/22 | TAC-N-AA175B | OPF – Off-Lease Only LLC Building. “J” Dent Wizard – Paint Booth |
25.14% SBE-Con Goal |
N/A | N/A | N/A |
25.14% SBE-Con Goal |
N/A | ||
3/2/22 | E22-DTPW-01 | Construction Engineering and Inspection Services & Resident Compliance Specialist Services for Florida Department of Transportation Local Agency Program Projects |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/18/22 | 20220030 | Safe Route to Schools Locations, Phase 22 FM #439895-1 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/18/22 | 20220010 | SW 87 AVENUE BRIDGE OVER CANAL C-100 |
SBE/Cons – 3.60% Goal |
N/A | N/A | N/A |
3.60% SBE-Con Goal
|
N/A | ||
2/18/22 | 20220017 | Intersection Improvements to Old Cutler Rd at SW 136th Street and SW 67th Avenue |
SBE/Cons – 11.59% Goal |
N/A | N/A | N/A |
11.57% SBE-Con Goal |
N/A | ||
2/16/22 | RPQ No. MDCR Boilers | Boiler and Water Heater Maintenance and Repairs |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/16/22 | 999999-21-023 | Multiple Parks - Sport Courts Renovations for Pickleball |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/16/22 | RFQ 22-19175-KG | LTCC Lobby Restroom Renovation |
SBE/Cons – 100% Level 2 set-aside |
N/A | N/A | N/A |
Level 1 Set-Aside |
N/A | ||
2/16/22 | 20220032 | PTP Vision Zero Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Asides 2 10.00% CWP Goal |
N/A | ||
2/14/22 | RPQ No. 68859 | PHCD WORK-ORDER CONTRACT 2022 - NORTH AREA |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
2/14/22 | RPQ No. 68856 | PHCD WORK-ORDER CONTRACT 2022 - SOUTH AREA |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/14/22 | RPQ No. 68855 | PHCD WORK-ORDER CONTRACT 2022 - CENTRAL AREA |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/14/22 | RPQ No. 69003 | PHCD VACANT UNIT PREPARATIONS - CONTRACT 1 - NORTH SECTOR 2022 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/14/22 | RPQ No. 69002 | PHCD VACANT UNIT PREPARATIONS - CONTRACT 2 - SOUTH SECTOR 2022 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
2/11/22 | 20210224 | Roadway Improvements to SW 268 St from SW 139 Ave to SW 119 Ave |
SBE/Cons – 8.83% SBE-Con Goal |
N/A | N/A | N/A |
8.83% SBE/Con Goal |
N/A | ||
2/3/22 | 2022-MDFR-CR-OR-HQ | Miami Dade Fire Rescue Crandon Park Ocean Rescue Headquarters |
SBE/Cons – 11.50% Goal |
N/A | N/A | N/A |
11.50% -SBE-Con Goal |
N/A | ||
1/28/22 | TAC-N-135A | Aero Miami I/LATAM Lan Cargo ULD Handling System Demolition & Installation of Caster Deck & High-Speed Doors at MIA Bldg. 709 |
SBE/Cons – 7.01% |
N/A | N/A | N/A |
7.01% SBE- Con Goal |
N/A | ||
1/25/22 | 32080117002-A | Pelican Harbor Marina – Dredging around D Dock Rebid |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/24/22 | 20220013 | Intersection Improvements to Old Cuttler Rd at SW 152nd Street and SW 184th St |
SBE/Cons – 10.21% Goal |
N/A | N/A | N/A |
10.21% SBE-Con Goal |
N/A | ||
1/21/22 | 005-E15/02-NOVA | Soil and Groundwater Sampling at the Pump Station #002 Property, on behalf of Water & Sewer Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/14/22 | 045-E14/03-ARC | Phase 2 Environmental site Assessment at the Goulds 5 Acre Property, located in the vicinity of 12821 SW 232 St., on behalf of the Department of Parks, Recreation & Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/13/22 | R-237491 | CDWWTP PLANT 2 CLARIFIER BASIN No. 4 STRUCTUAL REHABILITATION |
SBE/Cons – Trade Set Aside 100% |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
1/13/22 | 037-E14-01-NOVA | Environmental site Assessment at the Future Miami Heights Park Facility, located in the vicinity of SW 117 Ave. and SW 172 St., on behalf of the Department of Parks, Recreation & Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/5/2022 | 006R1-E14-03-ARC | Monitoring Well Installation and Additional Groundwater Assessment at the County Club of Miami, located near 6801 NW 186 St., on behalf of the Department of Parks, Recreation & Open Spaces |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/27/21 | 20210253 | Intersection Improvements-Multiple Sites |
SBE/Cons – Trade Set-Aside(s): Traffic Stripes and Markings and signage: Painted and/or Thermoplastic Concrete: Sidewalk and/or Curb and Gutter, including American with Disabilities (ADA) items |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/14/21 | S-932 | Clarifiers and HLD (ST-2B) South District Wastewater Treatment Plant |
SBE/Cons – 6.47% Goal |
N/A | N/A | N/A |
6.47% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
12/14/21 | S-933 | Clarifiers and HLD (ST-2B) South District Wastewater Treatment Plant |
SBE/Cons – 1.43% Goal |
N/A | N/A | N/A |
1.43% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
11/29/21 | RPQ No. 67284 | Edison Plaza full capacity generator-windows-doors replacement |
SBE/G&S – No Measure (Federally Funded) |
N/a | N/A | N/A |
No Measure |
N/A | ||
11/24/21 | P0260 | One-Year County-Wide Contract for Rehab of Manholes, Inflow and Infiltration Repair |
SBE/Cons – No Measure (Qualifications of Bidders/Single-Trade/No opportunity for sub-contracting) |
N/A | N/A |
No Measure |
N/A | |||
11/16/21 | Mech-051-HVAC | Weatherization Assistance Program (WAP) |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/16/21 | RPQ No. WAP-051-B | Weatherization Assistance Program (WAP) |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/4/21 | AC-089A | Remodeling of DFA Store 701 at Gate D15 |
SBE/Cons – 23.03% Goal |
N/A | N/A | N/A |
23.03% SBE-Con Goal |
N/A | ||
11/3/21 | TAC-R-AC-067A | Bridge Point BP Gratigny |
SBE/Cons – 9% Goal |
N/A | N/A | N/A |
9% SBE-Con Goal |
N/A | ||
11/1/21 | AC-081A | Swissport Cargo Building Cooler Expansion |
SBE/G&S – 38.32% Goal |
N/A | N/A | N/A |
38.32% SBE-Con Goal |
N/A | ||
10/29/21 | 422003-18-010 | Hobie Island North Side Shoreline Roadway Protection on Rickenbacker Causeway |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65 % DBE Goal |
N/A | ||
10/27/21 | AC-062A | Tampa Cargo BUP Infrastructure Bldg 708 |
SBE/Cons – 9.00% Goal |
N/A | N/A | N/A |
0.9% SBE-Con Goal |
N/A | ||
10/25/21 | AC069A | Signature Flight Support Remodel to Main Lobby and Bathrooms |
SBE/Cons – 10% Goal |
N/A | N/A | N/A |
10% SBE-Con Goal |
N/A | ||
10/25/21 | RPQ No. 65847 | PHCD Vacant Unit Securing – Arthur Mays |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
0.00% SBE-Con Goal |
N/A | ||
10/15/21 | 20210077 | Roadway Improvements to SW 328 Street from SW 187 Avenue to US-1 |
SBE/Cons – 37.06% Goal |
N/A | N/A | N/A |
28.85% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
10/12/21 | RFQ 21-20030-CW | General Interior Construction Tasks |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 1 Set-Aside |
N/A | ||
10/12/21 | R-233514 | CDWWTP PLANT 2 CLARIFIER No.5 |
SBE/Cons –100% Trade Set Aside |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
10/12/21 | R-233518 | CDWWTP PLANT 2 CLARIFIER No.6 |
SBE/Cons –100% Trade Set Aside |
N/A | N/A | N/A |
100% Trade Set Aside |
N/A | ||
10/7/21 | RFQ 21-21243-HO | Jackson North General Construction Tasks |
SBE/Cons – 100% Level 2 Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/6/21 | Y145A | Security Fencing - Homestead Airport - Enhancements |
60% DBE Goal |
N/A | N/A | N/A |
60% DBE Goal |
N/A | ||
10/6/21 | 003-E14-03-AECOM | Source Removal located within the Vizcaya Museum and Gardens |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/5/21 | 65360 | James E Scott Building Rehabilitation |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
10/5/21 | 20210203 | FDOT Traffic Signals Preventative Maintenance |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
9/28/21 | C21-SMDCAC-BAS | Building Automation System Replacement and Related I |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/23/21 | 20210190 | Roadway Resurfacing - Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set-Aside 2 10% CWP Goal |
N/A | ||
9/23/21 | 20210191 | Roadway Resurfacing - Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set-Aside 2 10% CWP Goal |
N/A | ||
9/22/21 | SD-17168-21 | South Dade Regional Library Roof Replacement and Impact Resistant Windows & Storefront |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/16/21 | AB-052A-2 | Implementation of Oil Change Program at the Rental Car Center |
SBE/Cons – 5.23% Goal |
N/A | N/A | N/A |
5.23% SBE-Con Goal |
N/A | ||
9/16/21 | M2020-004 | Administration Buildings 1001 - 1015 - Generator |
SBE/Cons – 6.86% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/13/21 | AC-052A | Swissport Building 711 Office Renovation |
SBE/Cons – 15% SBE-Con Goal |
N/A | N/A | N/A |
15% SBE-Con Goal |
N/A | ||
9/9/21 | RFQ 21-19118-KG | Central Building Pipe Insulation |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 3 Set-Aside |
N/A | ||
9/7/21 | E14-RER-03-025R1-APTIM | Source (Soil) Removal at the Future World Literacy Center Site |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/2/21 | S-930A | ST-2D-A ELECTRICAL DISTRIBUTION BUILDING 3 SOUTH DISTRICT WASTEWATER TREATMENT PLANT |
SBE/Cons – 10.10% Goal |
N/A | N/A |
SBE-Con 10.16% Goal 1.34% SBE-Goods Goal |
N/A | |||
9/1/21 | 32080117002 | Pelican Harbor Marina – Dredging around D Dock |
SBE/Cons – No Measure (Grant Requirements) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/23/21 | DB21-DTPW-08 | Design-Build Services for Roadway Signs in the Vicinity of Metrorail Stations |
SBE/Cons– No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/11/21 | 035-E14/03-CEI | Source Removal at the BLDG 1 – Location J site, located within the Miami Opa-Locka Executive Airport, on behalf of MDAD |
SBE/Cons– No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/10/21 | 20210096 | Sweeping and Cleaning Operations |
SBE/Cons – Under Review |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/2/21 | I190203 | Dade County Courthouse Basement Column/Slab Remediation |
SBE/Cons – 16.55% Goal |
N/A | N/A |
16.55% SBE-Con Goal 3.00% SBE-Goods 10.00% CWP Goal |
N/A | |||
7/30/21 | 20210089-R | Push-Button Contract for Traffic Signal Improvements – North |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/29/21 | V006A | Demolition of Bldg. 3039 at Miami International Airport |
SBE/Cons – 47.2% Goal |
N/A | N/A | N/A |
47.2% DBE Goal |
N/A | ||
7/29/21 | AC-050A | Tampa Cargo Pharma Center MIA Bldg 708 |
SBE/Cons – 5% Goal |
N/A | N/A |
11.7% SBE-Con Goal |
N/A | |||
7/22/21 | AA005A | E Satellite Lower E and DE Connector |
SBE/Cons– 20.64% Goal |
N/A | N/A | N/A | 20.64% SBE-Con Goal | N/A | ||
7/21/21 | 210601-19-001 | Lake Stevens Splashpad and Park Development |
SBE/Cons – 18.12% Goal |
N/A | N/A | N/A |
23.31% SBE-Con Goal |
N/A | ||
7/21/21 | 221801-19-002 | Oak Grove Park – Turf Conversion, Lighting and ADA Compliance |
SBE/Cons – 9.11% Goal |
N/A | N/A |
9.11% SBE-Con Goal 10.00% CWP Goal |
N/A | |||
7/19/21 | TAC-N-AC021A | MIA Safegate Terminal D (A-VDGS) Replacement |
SBE/Cons– No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/19/21 | RPQ NO. WAP-050 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/6/21 | S-915R | CD 2.15(3) PLANT 2 CLUSTER 3 DIGESTER UPGRADES |
SBE/Cons – 6.75% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
7/2/21 | RFQ 21-19085-KG | Red Garage Pipe Hangers |
SBE/Cons – 100% Level 2 Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/1/21 | 031-E14/03-CEI | Soil and Groundwater Sampling at the NDLF Maintenance Shop, on behalf of ISD |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/28/21 | CMBJPA-2021.01 | Joint Participation Agreement (JPA) between Miami-Dade County and the City of Miami Beach for Interception Improvement of Pine Tree Drive and 46th Street |
SBE/Cons – Landscaping 6.2% |
N/A | N/A |
15.00% SBE-Con Goal |
N/A | |||
6/28/21 | RFP-01982 | Develop, Maintain and Operate Rickenbacker and Venetian Causeways |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/17/21 | ITB-21-20874-SW | JHS North Campus Elevator Modernization Program |
SBE/Cons – No Measure (Insufficient Availability) |
N/A |
No Measure |
N/A | ||||
6/15/21 | P0254 | CD 2.26 Actuator Platforms at Oxygenation Trains CDWWTP |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
6/14/21 | 2020-003.01 | Cruise Terminal G Bollard Phase II (Bay 8.5) |
SBE/Cons – 6.84% Goal |
N/A | N/A | N/A |
6.84% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
6/11/21 | 2011-045.05 | Cargo Gates Modifications and Traffic Improvements (Phases 2 – 5) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/10/21 | RFQ 21-19071-KG | LTCC AHU Replacement |
SBE/Cons – Level 2 Set-Aside |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
6/4/21 | MDPDW21006 |
Roof Replacement of the MDPD Off-Site Maintenance Shop |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
6/3/21 | S-964 |
NW 27 Ave Waste Collection Transmission System Expansion and Water Distribution System Improvements D2-A-1 Phase 2 |
SBE/Cons – 14.09% |
N/A | N/A |
14.56% SBE-Con Goal 10.00% CWP Goal |
N/A | |||
6/3/21 | S-969 |
Emergency Sludge Line Repair in Biscayne Bay |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
6/2/21 | AC-035A |
MIA T-Mobile Fiber Optic Installation Flamingo & Dolphin Garage |
SBE/Cons– No Measure (Due to dollar value) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/1/21 | DB21-DTPW-06 |
Replacement of Existing Span-Wire Signalized Intersections for Mast-Arm Configuration |
SBE/Cons – 8.61% Goal |
N/A | N/A | N/A |
SBE-Cons 8.61% Goal 10% CWP Goal |
N/A | ||
5/27/21 | 229115 (RTQ-01055) |
2020 Saltfront Wells |
SBE/Cons – No Measure |
N/A | N/A |
No Measure |
N/A | |||
5/24/21 | 20210082 |
Safe Routes to Schools Locations, Phase 23 |
DBE – 10.65% Goal |
N/A | N/A |
DBE 10.65% Goal |
N/A | |||
5/21/21 | 222302-17-005 |
Boat Ramp and Parking Lot Renovation |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A |
No Measure |
N/A | |||
5/20/21 | DB21-DTPW-05 |
Roadway Improvements to Bay Vista Blvd. from NE 151 Street to Gwen Margolis Blvd |
SBE/Cons – 9.27% |
N/A | N/A |
9.27% SBE-Con Goal |
N/A | |||
5/14/21 | TOMLJPA-2021.01 |
Joint Participation Agreement (JPA) between Miami-Dade County and the Town of Miami Lakes for Roadway Extension of NW 59 Avenue over the C-8 Canal South to NW 151 Street |
SBE/Cons – Concrete – 7.06% |
N/A | N/A |
7.31% SBE-Con goal 3.56% SBE-Services Goal |
N/A | |||
5/14/21 | 048-E14/03-ARC |
Groundwater Sampling at Macy's Property, on behalf of Water & Sewer Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/11/21 | AC-036A |
QTA Fire Suppression System Modification at RCC |
SBE/Cons– 100% Goal |
N/A | N/A | N/A | 100% Set Aside | 100% Set Aside | N/A | |
5/10/21 | DB21-DTPW-04 |
Roadway Improvements to NW 84th Avenue between NW 58th Street and NW 74th Street |
SBE/Cons – 20.90% Goal |
N/A | N/A | N/A | 20.90% SBE/Cons Goal | 20.90% SBE/Cons Goal | N/A | |
5/10/21 | RPQ No. NMOFSMWINDOWS |
OFARRILL SOUTH MIAMI HEAD START IMPACT STORE FRONT WINDOW AND DOORS PROJECT |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
5/10/21 | RPQ No. MDFR-687-TRPOOL |
MDFR Training Facility Pool Repair and Renovation |
SBE/Cons – No Measure |
N/A | N/A | No Measure | No Measure | N/A | ||
5/10/21 | RPQ No. Mech 048- HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/10/21 | RPQ No. WAP-048 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/4/21 | P0223R |
Upgrade Sewage Pump Station No. 0014 |
SBE/Cons – 9.0% Goal |
N/A | N/A |
9.00% SBE-Con Goal 1.36% SBE-Goods |
N/A | |||
4/30/21 | 20210093 |
Roadway Improvements to NW 37th Avenue from NW 36 St to NW 79th Street |
SBE/Cons – 6.83% Concrete; 1.06% Pavement Marking & Signage |
N/A | N/A | N/A |
7.89% SBE-Con Goal 2.00% SBE-G&S Goal 10.00% CWP Goal |
N/A | ||
4/28/21 | P0244 |
Mural Restoration Alexander Orr Jr. Water Treatment Plant |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
4/26/21 | 20210071 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210072 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210073 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210074 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210075 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/26/21 | 20210076 |
Emergency Response for Street Lighting Restoration |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/19/21 | AC-011A |
Interior Build Out for Bldg. |
SBE/Cons– 4.68% Goal |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/19/21 | AC-005A |
Tenant Interior Build Out for MIA2 |
SBE/Cons– 9.42% Goal |
N/A | N/A | N/A | 9.42% SBE-Con Goal | 9.42% SBE-Con Goal | N/A | |
4/19/21 | S-930B |
ST-2D-B SOUTH DISTRICT WASTEWATER TREATMENT PLANT SUBSTATIONS 5-6 & 15-16 |
SBE/Cons – 11.85% Goal |
N/A | N/A |
11.85% SBE-Con Goal 1.00% SBE-Goods |
N/A | |||
4/13/21 | M2020-024 |
General Construction Services (Portwide) |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
100% Trade Set Aside 10.00% CWP Goal |
N/A | ||
4/13/21 | 227208 |
CDWWTP MIT 2021 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
4/9/21 | RPQ No. WAP-047 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
4/9/21 | RPQ No. 20210067 |
Drain Cleaning Contract |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/9/21 | RPQ No. 20210068 |
Drain Cleaning Contract |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
4/9/21 | RPQ No. 20210069 |
Drain Cleaning Contract |
DBE – 10.65% Goal |
N/A | N/A | N/A | DBE – 10.65% Goal | DBE – 10.65% Goal | N/A | |
4/5/21 | RPQ NO. I190167-R |
SPCC Exterior Ceiling Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | No Measure | No Measure | N/A | ||
3/31/21 | 60993 |
PHCD Boiler Inspections, Preventive Maintenance & Repair Services at & Parts. |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/29/21 | DB21-DTPW-01 |
Design Build Services (RDBS) for a Project with Disadvantaged Business Enterprise Goals |
SBE/Con – No Measure DBE Goal - 10.65% |
N/A | N/A | N/A |
SBE/Con - No Measure DBE Goal - 10.65% |
N/A | ||
3/29/21 | S-955 |
Two-Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity Mains, With County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons – 22.97% Goal |
N/A | N/A |
22.97% SBE-Con Goal 4.00% SBE-G&S Goal |
N/A | |||
3/29/21 | S-962 |
Two-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Cured-In-Place Pipe Lining Method for Well Protection Areas |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
3/26/21 | RPQ No. Mech 046-HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/25/21 | OLC-19341-21 |
Lemon City Library ADA Renovations and Impact Resistant Storefront and Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/25/21 | 17032-21 |
DSWM South Dade Landfill Gas System Expansion |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
5.00% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
3/25/21 | 028-E14/03-CEI |
Soil and Groundwater Sampling at Gwen Cherry Park, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/25/21 | RPQ No. WAP-046 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/23/21 | RPQ No. 20210057 |
Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set-Aside 2 10.00% CWP Goal |
N/A | ||
3/23/21 | 20210062 |
Joint Participation Agreement - Roadway Improvements W 76 St from W 36 Ave to W 20 Ave - Phase V |
SBE/Cons – Concrete 17.21% |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/23/21 | RPQ No. 20210056 |
Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set-Aside 2 10.00% CWP Goal |
N/A | ||
3/22/21 | S-960 |
One-Year Countywide Contract for Rehabilitation of Sanitary Sewers by the Sectional Lining Method with County Option to Renew for an Additional Three Years on a Yearly Basis |
SBE/Cons – Set Aside |
N/A | N/A |
Level 1 Set Aside 100% Goal
|
Level 1 Set Aside 100% Goal | N/A | ||
3/18/21 | DB21-DTPW-03 |
Design-Build Services for the Dadeland South Intermodal Station |
SBE/Cons – 8.22% SBE-Con Goal |
N/A | N/A | N/A | SBE/Cons – 8.22% SBE-Con Goal | SBE/Cons – 8.22% SBE-Con Goal | N/A | |
3/18/21 | 023-E14/03-CEI |
Groundwater Monitoring Plan Implementation for the Ludlam Trail Corridor project, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/18/21 | 033-E14/03-APTIM |
Site Assessment at the Miami-Dade Fire Rescue Training Facility, on behalf of Miami-Dade Fire Rescue |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/18/21 | RPQ No. SAPARKS21 |
Senior Housing Assistance Program |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/18/21 | RPQ No. SABRUNSON21 |
Senior Housing Assistance Program |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/18/21 | RPQ No. SAMCCRAY21 |
RPQ No. SAMCCRAY21 |
SBE/Cons – Under Review |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
3/11/21 | P0246 |
Alexander Orr Jr. WTP Radiator Installation for Engine No.6 |
SBE/Cons – 12.89% Goal |
N/A | N/A | 12.89% SBE-Con Goal | 12.89% SBE-Con Goal | N/A | ||
3/9/21 | 2021-MDFR-68 |
Miami Dade Fire Rescue Station No. 68 Dolphin |
SBE/Cons – 13.43% Goal |
N/A | N/A |
13.42% SBE-Con 3.77% SBE-Goods 10.00% CWP Goal |
N/A | |||
3/9/21 | 2017-035.03R |
North Cruise Boulevard Extension Phase III |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/9/21 | RPQ NO. 60440 |
PHCD Annie Coleman 014 Vacant Unit |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/8/21 | P0226RR |
CD 1.11 - EMERGENCY GENERATORS 1 THROUGH 4 REHAB SOUTH DISTRICT WASTE WATER TREATMENT PLANT |
SBE/Cons – 16.49% Goal |
N/A | N/A |
16.49% SBE-Con 3.02% SBE-Goods |
N/A | |||
3/5/21 | KN-21194-21 |
Kendall Library Impact Resistant Storefront and Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
3/3/21 | RPQ No. 420224 |
Park & Ride Lot at SW 112 Avenue and SW 204 Street Busway |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | 10.65% DBE Goal | 10.65% DBE Goal | N/A | |
2/25/21 | RPQ NO. 60110 |
WORK ORDER CONTRACT 2021 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/24/21 | RPQ No. 60108 |
PHCD WORK ORDER CONTRACT |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/24/21 | RPQ NO. 60109 |
WORK ORDER CONTRACT 2021 – Central Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
2/24/21 | RTQ-01055 |
Well Drilling Services |
SBE/Cons – Bid Preference |
N/A | N/A | N/A | Under Review | Under Review | N/A | |
2/17/21 | 20200297-R |
Emergency Culvert Replacement NW 57 Ave and NW 186 St - Tropical Storm ETA |
SBE/Cons – 7.22% Goal |
N/A | N/A | N/A | 7.22% SBE/Con Goal | 7.22% SBE/Con Goal | N/A | |
2/11/21 | P0247 |
Installation of 96-Inch Butterfly Valve on Hialeah WTP Raw Water Main |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | No Measure | No Measure | N/A | ||
2/5/21 | 502501-17-002 |
Charles Deering Estate - Courtyard Drainage and Structural Improvements |
SBE/Cons – 17.53% Goal |
N/A | N/A | N/A |
17.53% SBE-Con Goal |
17.53% SBE-Con Goal | N/A | |
2/4/21 | S-935 |
Ocean Outfall Legislation Program Construction Package ST-1B Oxygenation Trains 1-7 Rehab and Electrical Buildings |
SBE/Cons – 12.06% Goal |
N/A | N/A | N/A |
10.95% SBE-Con Goal 1.02% SBE-Goods Goal |
N/A | ||
2/3/21 | 20210015 |
Push Button Intersection Improvements – North |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
2/2/21 | DB21-DTPW-02 |
Roadway Improvements to NE 2 Ave from NE 20 Street to NE 36 Street |
SBE/Cons – 7.7% Goal |
N/A | N/A | N/A |
5.43%-SBE-Con Goal 0.63% Services Goal 10.00% CWP Goal |
N/A | ||
1/29/21 | ITB 21-20057-TC |
Jackson Memorial Freestanding Emergency Department |
SBE/Cons – 23.20% Goal |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/26/21 | P0245 |
Furnish and Install 16-inch PVC 14-inch HDPE Force Main at NE 183 RD ST. & Island Blvd. |
SBE/Cons – 6.4% Goal |
N/A | N/A | N/A |
6.38% SBE-Con Goal 7.34% SBE-Goods Goal |
N/A | ||
1/19/21 | RPQ No. 57925 |
PHCD Vacant Unit Preparations - 2021 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/15/21 | RPQ No. WAP-045 B |
Weatherization Assistance Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/14/21 | 2020-005 |
FPL Substation Expansion In fracture Relocation and Improvements (Phase I) |
SBE/Cons – 8.32% Goal |
N/A | N/A | N/A |
8.32% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
1/14/21 | S-956 |
NDWWTP Municipal Injection Wells (NE-2) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/11/21 | H2019-034 |
RCCL Replacement of Light Posts and Luminaires |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/8/21 | 2020-003 |
Cruise Terminal G Bollards |
SBE/Cons – 7.55% Goal |
N/A | N/A | N/A |
7.55% SBE-Con Goal |
N/A | ||
12/30/20 | RPQ No. HLMP21-ROOF-2 |
Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Funded by the State of Florida) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/30/20 | RPQ No. HLMP21-ROOF |
Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Funded by the State of Florida) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/30/20 | AA-0171B | OPF Bridge Aviation Warehouse Bldg. MIA2 |
SBE/Cons– 5% Goal |
N/A | N/A | N/A |
5.34% SBE-Con goal |
N/A | ||
12/23/20 | AB-074A |
IFC New FBO Building & Storage Hangars |
SBE/Cons– 9% Goal |
N/A | N/A | N/A |
10.02% SBE-Con Goal |
N/A | ||
12/18/20 | E20-WASD-08 |
Integrated Master Plan and Engineering Technical Support Services |
SBE/Cons –15% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
12/17/20 | 2017-001.03 |
SFCT Facilities Demolition |
SBE/Cons – 19.92% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/10/20 | 20200297 |
Emergency Culvert Repair at NW 57 Ave and NW 186 St – Tropical Storm ETA |
SBE/Cons – 12.26% Goal |
N/A | N/A | N/A |
11.63% SBE-Con Goal |
N/A | ||
12/9/20 | AB-070A |
Amazon Parcel Sorter Machine Installation at OPF MIA1 Facility |
SBE/Cons– No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/4/20 | 014R1-E14/03-APTIM |
Limited Soil Assessment and Survey for the Amelia Earhart Park, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/3/20 | RPQ No. 412034 |
Traction Power Switchgear Replacement Project Phase III Update |
SBE/Cons – No Measure |
N/A | N/A |
No Measure |
N/A | |||
11/23/20 | W-942 |
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 5.47% Goal |
N/A | N/A |
N/A |
5.47% SBE-Con Goal 2.90% SBE-Goods Goal |
N/A | ||
11/17/20 | RQMT000006 |
Modernization, Maintenance, and Repair Services for Conveyance Equipment |
SBE/Cons– Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/17/20 | DB-20-LIB-01 |
Design and Construction of new 20,000 SQ.FT. Doral Branch Library |
SBE/Cons – 26% Goal |
N/A | N/A | N/A |
30.00% SBE-Con Goal |
N/A | ||
11/17/20 | S-958 |
D2-C-2, Proposed 16-inch, 12-inch, and 8-inch DI Water Main and 10-inch and 8-inch Gravity Sewer along NW 22nd Avenue from NW 79th Street to NW 90th Street and 8-inch Force Main along NW 87th Street |
SBE/Cons – 30% Goal |
N/A | N/A |
30.00% SBE-Con Goal No Measure- SBE Goods No Measure - SBE Services No Measure - CWP Goal |
N/A | |||
11/17/20 | HI-229378 |
Hurricane Irma – Redland Fruit and Spice Park Roof Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/16/20 | AA-084A |
Sky Harbour Hangars at OPF |
SBE/Cons– 9.65% Goal |
N/A | N/A | N/A |
9.65% SBE-Con Goal |
N/A | ||
11/16/20 | AB077A |
Amazon COVID-19 Work Station Separation Curtains |
Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/13/20 | 20200304 |
Drainage Improvements to C-100 Canal Outfalls Retrofit between SW 98 Ave. and SW 106 Ct. |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
11/12/20 | S-963 |
Installation of 10” HDPE Sewage Force Main Canal Crossing at NW 16 Ct. and NW 155 Terrace and Cut-In of 60” Plug Valve at NE 10 Ave. & NW 159 Street |
SBE/Cons – 3.00% Goal |
N/A | N/A |
3.00% SBE-Con Goal 0.50% SBE-Goods Goal 10.00% CWP Goal |
N/A | |||
11/9/20 | AB055A |
MIA Duty Free of the Americas Mont Blanc Boutique |
16.7% SBE-Con Goal | N/A | N/A | N/A |
16.7% SBE-Con Goal |
N/A | ||
11/9/20 | AB-055B |
MIA Duty Free of the Americans Lego Store |
SBE-Con 16.3% |
N/A | N/A | N/A |
16.3% SBE-Con Goal |
N/A | ||
11/6/20 | RPQ No. WAP-044 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/6/20 | RPQ No. Mech 044-HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
11/4/20 | DB20-PROS-01 |
Design- Build Services for the Country Club of Miami Golf Course Reconfiguration |
SBE/Cons – 4.05% Goal |
N/A | N/A | N/A |
4.05% SBE-Con Goal |
|
N/A | |
11/4/20 | 20200296 |
Drainage Improvements and F&I 12” D.I. Water Main at NW 18 Ave from NW 62 St to NW 71 St |
DBE– 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
10/29/20 | 20200289 |
Push-Button Contract for Safety Improvements |
DBE– 10.65% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/29/20 | 20-18935-KG |
Trauma Building AHU #202 Coil Replacement |
SBE/Cons – 100% Level-3 Set Aside |
N/A | N/A | N/A | Level 3 Set-Aside | N/A | ||
10/28/20 | 2017-001.01 |
Berth 9 Environmental Mitigation |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
10/27/20 | EDP-HD-S-JAMES-E. SCOTT |
James E Scott Building Revitalization |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Unde Review |
Under Review |
N/A | |
10/26/20 | S-931 |
Ocean Outfall Legislation Program Construction Package ST-2A Headworks 3, Oxygenation Trains 9 & 10, and Substation 57/58 |
SBE/Cons – 10.65% Goal |
N/A | N/A |
SBE/Cons – 10.65% Goal |
N/A | |||
10/14/20 | W-942 |
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 2.49% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
10/14/20 | RPQ No. MDFR-DIRCON |
Direct Connect/Source Capture System |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/8/20 | RFQ 20-18920-KG |
Jackson North Building Signage |
SBE/Cons – 100% Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside |
N/A | ||
10/7/20 | TEMP-LB-210 | Design and Construction of new 20,000 SQ. FT. Doral Branch Library |
SBE/Cons – Set-Aside |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
10/7/20 | 2017-001.02 |
Environmental Mitigation Project Berths 9 and H |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/6/20 | AB-052A |
Implementation of Oil Change Program at the Rental Car Center |
10% A/E Goal |
N/A | N/A | N/A |
10% A/E Goal |
N/A | ||
10/1/20 | 20200159 |
Safe Route to Schools Locations, Phase 22 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
9/29/20 | RPQ No. WAP-043 B |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/29/20 | RPQ No. Mech 043-HVAC |
Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/28/20 | 026-E14-RER-03-WOOD |
Site Assessment at Future Embassair, Opa-Locka Airport, on behalf of MDAD |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/28/20 | DB20-WASD-02 |
Design-Build Services for the North District Wastewater Treatment Plant Oxygen Trains and Oxygen Production Facility Consent Decree |
SBE/Cons – 5.1432% Goal |
N/A | N/A | N/A |
SBE-Con - 5.143% Goal SBE-Goods - 1.00% Goal |
N/A | ||
9/28/20 | AB-058A |
Meek DFM9 Project (TAC N) |
3.33% SBE-A/E Goal |
N/A | N/A | N/A | 3.33% SBE-A/E Goal | N/A | ||
9/28/20 | W-942 |
72-Inch Water Main in West 2nd Avenue Between 11th Street and 13th Street |
SBE/Cons – 2.49% Goal |
N/A | N/A | N/A |
5.47% SBE-Con goal
|
N/A | ||
9/23/20 | RPQ No. MDFR-666-OR-B |
Crandon Ocean Rescue Headquarters |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
32.61% SBE-Con Goal |
N/A | ||
9/21/20 | 2011-045.04 |
Cargo Gates Modification and Process Improvements – Secondary Electrical Service |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
SBE/Cons - 100% Trade Set Aside SBE/Goods - 2.97% goal SBE/Service - No Measure CWP - 10% goal |
N/A | ||
9/18/20 | ZC2020BIBR |
Zoo Miami – Black & Indian Rhino Barn Renovations |
SBE/Cons – 2.96% Goal |
N/A | N/A | N/A |
SBE/Cons – 2.97% Goal |
N/A | ||
9/18/20 | 016-E14/01-NOVA |
OPF ACTC Site Assessment, on behalf of Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/18/20 | RPQ No. 20200255 |
Traffic Circle Improvements at SW 97th Ave. and SW 120th St. |
SBE/Cons – 10.17% Goal |
N/A | N/A |
10.17% SBE-Con Goal
|
N/A | |||
9/17/20 | S-951 |
Water and Wastewater Services to Commercial Properties Green Tech Corridor S-8 – Gravity Basin 30-0073 |
SBE/Cons – 15.54% Goal SBE/G&S – 6.12% Goal |
N/A | N/A | N/A |
16.79% SBE-Con Goal 6.12% SBE - Goods Goal |
N/A | ||
9/15/20 | 16704-DSWM20-CT |
Construction Services for Landfill Closure and Remediation at Virginia Key Landfill |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
9/11/20 | 20200251 |
Roadway Improvements to SW 22 Ave from US-1 to Coral Way |
SBE/Cons – 29.53% Goal |
N/A | N/A |
25.63% SBE-Con Goal |
N/A | |||
9/10/20 | 016R1-E14/03-WOOD |
Phase 2 Environmental Site Assessment at Briar Bay Linear Park, Parcels 13, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/10/20 | 017R1-E14/03-WOOD |
Phase 2 Environmental Site Assessment at Briar Bay Linear Park, Parcels 13, on behalf of Parks, Recreation and Open Spaces Department |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/10/20 | 018R1-E14/03-WOOD |
Phase 2 Environmental Site Assessment at Briar Bay Linear Park, Parcels 13, on behalf of Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/8/20 | R-218877 |
CD 2.08(3) Plant 2 Clafier #7 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
SBE/Cons - 100.00% Trade Set Aside |
N/A | ||
9/2/20 | RPQ NO. 17032-20 |
DSWM's South Dade Landfill Gas System |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
SBE/Cons - No Measure SBE/Goods - No Measure SBE/Services -1.73% Goal 10% CWP Goal |
N/A | ||
9/2/20 | RPQ No. 55634 |
Little River Terr. Lift Station Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/31/20 | 033-D14/01-NOVA |
Phase 2 Environmental Site Assessment at the Urbanistica Property, located at 830 NE 89 Street, on behalf of Miami-Dade Parks, Recreation & Open Spaces Department (PROS) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/31/20 | X-032C |
RTR M2, LLC Road Course and Supporting Facility (Comfort Station) |
11.21% SBE-Con goal |
N/A | N/A | N/A |
11.21% SBE-Con goal |
11.21% SBE-Con goal | N/A | |
8/27/20 | HI 50250118004 |
Hurricane Irma – Charles Deering Estate - Peoples Dock Reconstruction |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/25/20 | AL-18459-20 |
Allapattah Branch Library |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/20/20 | AA-037A (5) |
DHL Expansion Project MIA Building 716 (Sorting Equipment) |
No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | 014-D14/01-NOVA |
Site Assessment at OGA Bldg. 101/102, on behalf of Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | AA-037A (4) |
DHL Expansion Project MIA Building 716 (Rapiscan X Ray Equipment) |
SBE/Cons - No Measure | N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | 030-D14/03-APTIM |
Supplemental Soil Assessment at the South Dade Community Park, |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/11/20 | RPQ No. 14973-20 |
DSWM South Dade Landfill Facility Roofing Project (Roof Deck Waterproofing and Partial Roof Repairs) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/7/20 | DFM9- TAC N |
Meek DFM9 Project (TAC N) |
Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
8/7/20 | HI 51060120003 |
Hurricane Irma – Matheson Atoll Pool Restoration |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
8/6/20 | RPQ No. 53840 |
Helen Sawyer Full Capacity Generator |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
8/5/20 | RPQ No. 20200231 |
Push Button Intersection Improvements – South |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
7/30/20 | CIP168-DTPW20-CT2 |
Metrorail Acoustical Barrier Replacement- Phase 3 |
SBE/Cons – No Measure SBE/Goods - No Measure SBE/Services - No Measure 10% CWP Goal
|
N/A | N/A | N/A |
SBE/Cons – No Measure SBE/Goods - No Measure SBE/Services - No Measure 10% CWP Goal |
N/A | ||
7/28/20 | RPQ No. 20200223 |
Traffic Signals and Signs Division Complex Roof Replacements |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
7/27/20 | 014R1-D14/03-WOOD |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 015-D14/03-WOOD |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 006-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 007-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure
|
No Measure | N/A | |
7/27/20 | 015R1-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 016-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/27/20 | 018-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
7/27/20 | 022-D14/03-CEI |
Site Assessment at Multiple Locations, on behalf of Miami-Dade |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 022R1-D14/03-WOOD |
PFAS Assessment at the Miami International Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
7/25/20 | 006-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 022-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 023R1-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 024-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
7/25/20 | 025-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 026-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 028-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/20 | 039-D14/03ARCADIS |
Site Assessment at Multiple Locations, on behalf of Miami-Dade |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | RPQ No. 418861 |
Metrorail Platform Cabling Replacement |
SBE/Cons – Under Review |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
7/21/20 | 001R2-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | 025-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | 026-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/21/20 | 026R1-D14/03-APTIM |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
7/20/20 | 012-D14/03-AECOM-A |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 014-D14/03-AECOM |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 013-D14/03-AECOM |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 011-D14/03-AECOM |
Site Assessment at the Annie Coleman 14 Site Locations on behalf of the Public Housing & Community Development Department (PHCD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | RPQ No. 20190289-R |
SW 42nd Avenue over Coral Gables Canal Bridge No. 874275 Beams |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 0020-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 024-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 026-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 028-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | 029-D14/01-NOVA |
Site Assessment at Multiple Locations, on behalf of Miami-Dade County User Departments |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/20/20 | RPQ No. 16899-20 |
DSWM Gas Collection and Control System Expansion North Dade Landfill |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure - SBE/Con No Measure - SBE/Goods 1.73% - SBE/Services Goal No Measure - CWP Goal |
N/A | ||
7/17/20 | 015-D14-01-NOVA |
Limited Site Assessment, Remedial Documents Preparation & Construction Oversight at MIA Bldg. 2120, on behalf of Miami-Dade Aviation Department (MDAD) |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/17/20 | 025-D14/03-WOOD |
Site Assessment at the Doral Vacant Lot, located at 3500 NW 78 |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 021R2-D14-03-APTIM |
Supplemental Groundwater Assessment at the Former Haven School, located at 11300 SW 80 Terrace, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 040-D14-03-ARCADIS |
Groundwater and Soil Assessment at the Brothers to the Rescue Park site, located at 2470 SW 72 AVE, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 030R1-D14-01-NOVA |
Supplemental Soil Assessment at the WASD Pump Station #002 site, located in the vicinity of 925 Biscayne Blvd, on behalf of the Parks, Water & Sewer Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | 012R2-D14-03-CEI |
Supplemental Soil Assessment at Post Hurricane Debris Staging sites at Tamiami and Homestead Air Reserve Parks located at 11201 SW 24 ST and 26751 SW 127 AVE respectively, on behalf of the Parks, Recreation and Open Spaces Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/16/20 | NC-18810-20 |
North Central Library Impact Resistant Windows and Storefront, Interior & Exterior Flooring |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/15/20 | W-948 |
Water Service Conversion from Rear Water Services to Front Water Services |
SBE/Cons – Level 3 Set-Aside |
N/A | N/A |
Tier III Set Aside - SBE/Cons No Measure - SBE/G&S |
N/A | |||
7/14/20 | 79050319001 | South Dade Park – Playground Improvements and Re-stripe parking lot |
SBE/Cons – 13.74% Goal |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
7/7/20 | RPQ NO. MIA-AA1412A | Perimeter Intrusion Detection System |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/30/20 | ND-18838-20 | Impact Resistant Storefront and Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/8/20 | MDPDW20019 | Roof Replacement of the MDPD Professional Compliance Bureau |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/3/20 | 20200197 | Roadway Improvements to SW 268 St from SW 139 Ave to SW 119 Ave |
9.15% SBE-Con Goal 0.52% SBE- Services Goal 10.00% CWP Goal |
N/A | N/A | N/A |
9.15% SBE-Con Goal 0.52% SBE- Services Goal 10.00% CWP Goal |
N/A | ||
6/26/20 | S049896 | South Miami Heights Trailer Installation |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/25/20 | RPQ No. 20200203 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
6/19/20 | RPQ No. W180003 | Coral Gables Interior Renovation, Roof Replacement and Impact Resistant Windows |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/17/20 | S-955 | Two-Year Countywide Contract for Removal and Replacement of Sanitary Sewer Gravity Mains, With County Option to Renew for an Additional Two Years on a Yearly Basis |
SBE/Cons – 2.27% Goal |
N/A | N/A | N/A |
20.27% SBE- Con Goal 2.00% SBE - Goods Goal |
N/A | ||
6/16/20 | 0000206606 | SMH Pre-Engineered Building |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/11/20 | P0238 | Improvements to RA Pipeline (ST-2E) South District Wastewater Treatment Plant |
SBE/Cons – 3.22% Goal |
N/A | N/A | N/A |
3.72% SBE-Cons Goal 2.00% SBE-Goods Goal |
N/A | ||
6/5/20 | RPQ No. 16888 | Re-Roofing Project for DSWM’s 58th Street Truck Wash Building |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
6/4/20 | RPQ No. 19M026 | Re-Roofing Projects for the Department of Solid Waste Management’s Mosquito Control and Home Chemical Buildings |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | No Measure | N/A | |
5/29/20 | R-213356 | CD 1.12(2) SDWWTP Chlorine Contact Chamber 2 Rehabilitation |
SBE/Bid Preference |
N/A | N/A | N/A | Trade Set Aside | Trade Set Aside | N/A | |
5/15/20 | AB-029A | MDAD BLDG. 863 Aerothrust Holdings Signage Replacement |
SBE/Cons – No Measure |
N/A | N/A | N/A | No Measure | N/A | ||
5/13/20 | 31110618001 | Arcola Lakes – Bioretention Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/13/20 | RFQ 20-18262-KG | Receiving Area Building Painting |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A | Level 1 Set Aside | N/A | ||
5/12/20 | 20200142 | Safe Routes to School |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | Under Review |
Under Review |
N/A | |
5/8/20 | TAC-N-AA-111A | WFS Bldg 716 C & D Office Remodel |
SBE/Cons – 8.2% Goal |
N/A | N/A | N/A | 12.40% SBE- Cons Goal | N/A | ||
5/8/20 | RPQ No. 51635 | Helen Sawyer Generator Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
5/5/20 | C2020RACBA1 | Multiple Parks - Racquetball Court Resurfacing |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A | No Measure | N/A | ||
5/1/20 | MCC-U010F-7.1 | MIA – New Elevator at E Satellite |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
100% Trade Set Aside 10% CWP Goal |
N/A | ||
5/1/20 | MCC-U010A-1 | MIA – Concourse E Structural Repairs |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A | 100% Trade Set Aside | N/A | ||
4/28/20 | RPQ No. 20200113 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/28/20 | RPQ No. 20200112 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A | 10.65% DBE Goal | N/A | ||
4/28/20 | RPQ No. 20200111 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | RPQ No. 20200110 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | RPQ No. 20200109 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | RPQ No. 20200108 | Emergency Relief Contracts for 2020 Hurricane Season |
DBE – 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/28/20 | AA171A | OPF Bridge Aviation Warehouse Bldg 4 – M |
SBE/Cons – 10.18% Goal |
N/A | N/A | N/A |
10.18% SBE/Cons Goal |
N/A | ||
4/28/20 | AA170A | OPF Bridge Aviation Warehouse Bldg 2 - KP |
SBE/Cons – 10.00% Goal |
N/A | N/A | N/A | 10.00% SBE/Cons Goal | N/A | ||
4/28/20 | AA169A | OPF Bridge Aviation Warehouse Bldg 3 - L |
SBE/Cons – 10.22% Goal |
N/A | N/A | N/A |
10.22% SBE/Cons Goal |
N/A | ||
4/22/20 | RQID2000096 | Maintenance and Repair Services for Conveyance Equipment |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/22/20 | 49350119001 | Kendall Soccer Park – Turf Replacement Phase 1 |
SBE/Cons – 5.07% Goal |
N/A | N/A |
5.07% SBE-Cons Goal |
N/A | |||
4/20/20 | 60220115002 | Black Point Park& Marina – Dock Reconstruction |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/15/20 | RPQ No. 412223 | William Lehman Center Car Cleaner Platform |
SBE/Cons – Set Aside |
N/A | N/A | N/A |
SBE/Cons-Set Aside |
SBE/Cons - Set Aside |
N/A | |
4/7/20 | AA-047A | OPF Embassair FBO (Fixed Based Operation) |
SBE/Cons – 15% Goal |
N/A | N/A | N/A |
15% SBE/Cons Goal |
N/A | ||
4/6/20 | DB20-DTPW-01 | Additional Elevators at Dadeland North Metrorail Station Parking Garage Project |
SBE/Cons – 10.65% DBE Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
4/6/20 | CIP168-DTPW19-CT1 | Construction Services for the Acoustical Barrier Replacement Phase 3 (Part 1 of 2) |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/31/20 | RPQ No. NMJACKELEC | Jackson Dade Head Start Electrical Meter Upgrade |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
3/30/20 | 20200106 | Roadway Resurfacing-Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | |||
3/30/20 | 20200107 | Roadway Resurfacing-Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
3/30/20 | 20200140 | Improvements to Downtown Mobility |
SBE/Cons – 35% Pavement Marking & Signage |
N/A | N/A |
35.00% SBE Con Goal No Measure - SBE Goods No Measure - SBE Services 10% CWP Goal |
N/A | |||
3/23/20 | RPQ No. 49680 | Work Order Contract 3 - South Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/23/20 | S-948 | CD 1.10 Odor Control Scrubber Buildings S0606 and S0608 Upgrade |
SBE/Cons – 7.11% Goal |
N/A | N/A | N/A |
7.61% SBE- Con Goal 2.00% SBE- Goods Goal |
N/A | ||
3/23/20 | RPQ No. 49676 | Work Order Contract 1- North Area |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/23/20 | RPQ No. P0240 | CD 1.04 South District Wastewater Treatment Plant Chlorine Building Improvements |
SBE/Cons – 14.0% |
N/A | N/A | N/A |
14.00% SBE - Con Goal |
N/A | ||
3/6/20 | RPQ No. 49678 | Work Order Contract 2 - Central |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
3/5/20 | 20200096 | Push Button Roadway Resurfacing – North |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
3/5/20 | 20200097 | Push Button Roadway Resurfacing – South |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/27/20 | RPQ No. 48805 | PHCD Vacant Unit Preparation Contract 2 |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/27/20 | RPQ NO. 48641 | PHCD Vacant Unit Preparation Contract 1 |
SBE/Cons - No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/25/20 | C60060116001 | Quail Roost – Playground Expansion |
SBE/Cons – 8.79% Goal |
N/A | N/A | N/A |
8.79% SBE - Con Goal |
N/A | ||
2/25/20 | 20200098 | Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue |
SBE/Cons – 10.10% Goal |
N/A | N/A | N/A |
14.32% SBE - Con goal 0.11% SBE - Services goal |
N/A | ||
2/24/20 | AAA-02-24-2020 | Ice Replacement Water Filter Cartridge |
No Measure |
N/A | N/A | N/A |
No Measure |
|||
2/21/20 | RPQ No. 49489 | Wynwood Elderly |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/18/20 | RPQ NO. W200008 | Electrical Contractor Assist |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/14/20 | AA-006A | Aero Miami III LLC/LATAM Façade Renovation Bldg. 709 |
SBE/Cons - No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/13/20 | C31100419002 | Gwen Cherry Park – Playground Renovation |
SBE/Cons – 6.61% Goal |
N/A | N/A | N/A |
6.61% SBE-Con Goal 10.00% CWP Goal |
|
N/A | |
2/13/20 | CIP097-DTPW20-CT2 | Construction Services for State Road 836 Express Bus Park & Ride Terminal (Panther Station) |
DBE – 17.00% Goal |
N/A | N/A | N/A |
17.00% DBE Goal |
N/A | ||
2/13/20 | RPQ No. 20200081 | Guardrail Improvements Multiple Sites A and B |
SBE/Cons - No Measure CWP Workforce Goal - 10% |
N/A | N/A | N/A |
No Measure 10.00% CWP Goal |
N/A | ||
2/13/20 | RPQ No. 20200090 | Guardrail Improvements Multiple Sites A and B |
SBE/Cons - No Measure 10.00% CWP goal |
N/A | N/A | N/A |
SBE/Cons - No Measure 10.00% CWP goal |
N/A | ||
2/11/20 | AB-006B | Aero Miami III LLC/LATAM ULD Rack at Bldg. 709 |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/11/20 | RFP-01515 | Development of Vizcaya Station Property |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/10/20 | RPQ No. 49128 | Palm Court elevators replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/10/20 | AA-159A | Installation of IDS, CCTV and ACS Systems |
SBE/Cons – No Measures |
N/A | N/A | N/A |
No Measures |
N/A | ||
2/10/20 | RPQ No. 49134 | Parkside 1 & 2 elevators replacement |
SBE/Cons– No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/10/20 | RPQ No. 20200079 | Bicycle Facilities on SW 136th Street from US-1 to Old Cutler Road |
DBE– 10.65% Goal |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
2/10/20 | ABO14A | Duty Free Americas (DFA) Refurbishment Store 727 (H – J Connector at MIA) |
SBE/Cons – 10% Goal |
N/A | N/A | N/A |
25% SBE-Con Goal |
N/A | ||
2/7/20 | RPQ No. W170082 | Animal Services Department ASD Latent Defects |
SBE/Cons – 8.33% SBE - Con Goal |
N/A | N/A | N/A |
8.33% SBE-Con Goal |
N/A | ||
2/7/20 | RPQ No. 20190339 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - Trade Set Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
2/5/20 | RPQ No. 20200028 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/20 | RPQ No. 20190286 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/20 | RPQ No. 20200029 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/5/20 | RPQ No. 20200030 | Roadway Resurfacing – Multiple Sites |
SBE/Cons - No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
2/4/20 | CIP168-DTPW19-CT | Construction Services for the Acoustical Barrier Replacement |
SBE/Cons – No Measure |
N/A | N/A | N/A |
No Measure 10% CWP Goal |
N/A | ||
2/4/20 | C40180019002 | Concord Park - Playground Renovation |
SBE/Cons – 5.69% Goal |
N/A | N/A | N/A |
5.69% SBE- Con Goal |
5.69% SBE-Con Goal | N/A | |
2/4/20 | C79040419001 | Modello Park - Playground Renovation |
SBE/Cons – 5.33% Goal |
N/A | N/A | N/A |
5.33% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
2/4/20 | C40310119002 | Kendall Indian Hammocks Park - Playground Renovation |
SBE/Cons – 7.06% Goal |
N/A | N/A | N/A |
7.07% SBE- Con Goal |
7.07% SBE - Con Goal | N/A | |
1/30/20 | 422003-18-010 | Hobie Island North Side Shoreline Roadway Protection of Rickenbacker Causeway |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
10.65% DBE Goal | N/A | |
1/28/20 | RPQ No. 48539 | Manor Park, Orchard Villas and Buena Vista Scattered Sites Roofs Replacement and Exterior Paint |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/27/20 | RPQ No. 47633 | Victory Homes Roofs Replacement and Exterior Paint |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/24/20 | RPQ No. 20200031 | Intersection Improvements |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/24/20 | 422003-17-003 | Rickenbacker Causeway Green Bike Lanes Segment A - Phase 1 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/24/20 | S-945 | 60-INCH FORCE MAIN (NL-1A) (WEST SEGMENT) ALONG NW 162ND STREET FROM NW 6 AVENUE TO NE 8 AVENUE |
SBE/Cons – 4.73% Goal |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20-Roof-01 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20-Roof-02 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20-Roof-03 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20Shutter01 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20Shutter02 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/23/20 | RPQ No. HLMP20Shutter03 | Hurricane Loss Mitigation Program (HLMP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/22/20 | RPQ No. 48517 | Peters Plaza Elevator Replacement Fla 5-39 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/17/20 | S-947 | Furnish and Install 24-Inch Sanitary Force Main Along NW 170 St from NW 97 Ave to NW 75 Place |
SBE/Cons – 12.73% Goal |
N/A | N/A |
Under Review |
Under Review | N/A | ||
1/17/20 | AAA-01-17-2020-A | Corner Guards Replacement |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/17/20 | AAA-01-17-2020-B | Exterior Delaminated Glass Replacement |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/17/20 | AAA-01-17-2020-C | Facility Doors Replacement – Interior/Exterior |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Under Review |
Under Review | N/A | |
1/17/20 | RPQ No. 48366 | Wynwood, Liberty and Grove Homes Scattered Sites Roofs Replacement and Exterior Paint |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/13/20 | RPQ No. SADORSETT | Single Family Home Rehabilitation Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
No Measure | N/A | |
1/13/20 | RPQ No. SAPEARLMUTTER-R | Single Family Home Rehabilitation Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/13/20 | RPQ No. SASNIPES | Single Family Home Rehabilitation Program |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
1/13/20 | RPQ No. 20200011 | Roadway Improvements to NW 82nd Avenue from NW 7th Street to NW 12th Street |
SBE/Cons – 15.47% Goal |
N/A | N/A | N/A |
0.26% SBE-Services Goal 15.20% SBE - Con Goal 10.00% CWP Goal |
N/A | ||
1/9/20 | RPQ No. 20190277-R | Drainage Improvements to C-100 Canal Outfalls Retrofit between SW 98 Ave. and SW 106 Ct. |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure 10% CWP Goal |
N/A | |||
1/6/20 | V-056-A | MIA – Cc D Mechanical Rooms Mildew Remediation |
SBE/Cons – Trade Set-Aside |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
1/6/20 | S-957 | Improvements to RAS Pipeline (ST-2E) South District Wastewater Treatment Plant |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A |
Under Review |
Under Review |
N/A | ||
12/31/19 | 593602-18-001 | RV CAMPGROUND & FACILITIES UPGRADES |
SBE/Cons – 8.84% Goal |
N/A | N/A | N/A |
11.18% SBE- Con Goal 4.00% SBE- Services Goal |
N/A | ||
12/30/19 | RPQ No. 47422 | Three Round Tower Bldg. B Fla 5-62 |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/30/19 | RPQ No. 20190280 | Roadway Surfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/24/19 | RFQ 19-17851-KG | ACC-East Duct Heaters Replacement |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside |
N/A | ||
12/20/19 | 20190279 | Caribbean Boulevard Bridge (874431) over Canal C1-N Replacement |
SBE/Cons – 2.81% Goal |
N/A | N/A | N/A |
2.65% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
12/18/19 | RQMT2000007 | 60’ Battery-Electric Articulated Buses and Charging System |
SBE/Cons - 7.40% Goal SBE/Goods - 4.00% Goal |
N/A | N/A | N/A |
SBE/Cons - 7.40% Goal SBE/Goods - 4.00% Goal |
N/A | ||
12/18/19 | 20190289 | SW 42nd Avenue over Coral Gables Canal Bridge Construction |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
12/18/19 | 2017-035.03 | North Cruise Boulevard Extension Phase III |
SBE/Cons – 9.76% Goal |
N/A | N/A | N/A | No Measure | N/A | ||
12/10/19 | 20190238 | Bridge Replacement at SW 136th St Over Canal C-100A (Bridge No. 874420) |
SBE/Cons – 2.24% Goal |
N/A | N/A | N/A |
2.24% SBE-Con Goal |
N/A | ||
12/10/19 | 20190315 | Roadway Improvements to NW 7th St from NW 79th Ave, to NW 76th Ave. |
SBE/Cons – 9.41% Goal |
N/A | N/A | N/A |
8.22% SBE- Con Goal 0.34% SBE - Services Goal 10.00% CWP Goal |
N/A | ||
12/9/19 | RPQ No. P0236 | Replacement of 48-Inch Butterfly Valve and Actuator on Hydrotreaters (Softeners) 9, 10 and 12 at the Alexander Orr Jr. Water Treatment Plant |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/6/19 | R-207187 | CDWWTP PLANT 2 CLARIFIER BASIN No.4 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
12/6/19 | R-207079 | CDWWTP PLANT 2 CLARIFIER BASIN No.10 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/27/19 | RFQ 19-17782-HO | Jackson North Medical Center Asphalt Repairs |
SBE/Cons – 100% Level 1 Set-Aside |
N/A | N/A | N/A |
Level 1 Set Aside 100% - SBE- Con |
N/A | ||
11/19/19 | RPQ No. 46813 | Palm Court Fla 5-65 |
SBE/G&S – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
11/14/19 | Z208510 | Pygmy Hippo Enclosure |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
11/5/19 | RPQ No. 46437 | Peters Plaza |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/29/19 | RPQ No. 46147 | PARKSIDE 1 & 2 ELEVATOR REPLACEMENT |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/23/19 | RPQ No. 20190276 | Roadway Resurfacing – Multiple Sites |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
10/21/19 | 20190519 | Franjo Road Improvements from SW 184 Street to Old Cutler Road |
SBE/A&E – 34.16% Goal
|
N/A | N/A | N/A |
34.16% SBE-A&E Goal 13.11% SBE-Con Goal 4.00% SBE-Services Goal |
N/A | ||
10/17/19 | RFQ 19-17595-KG | ACC-West Doors Refurbishments |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 1 Set-Aside 100% SBE-Con Goal |
N/A | ||
10/17/19 | A19-MDAD-02 | Facility Design and Construction Inspection Services (CIS) |
DBE – 28% Goal |
N/A | N/A | N/A |
28% DBE Goal |
N/A | ||
10/17/19 | RPQ No. 20190257 | Safe Route To Schools Locations Phase 18 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/17/19 | RPQ No. 20190263 | Safe Route To School Locations Phase 19 |
DBE – 10.65% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/17/19 | E19-DTPW-08 | Professional Services for Bridge Inspection and Structural Analysis |
DBE – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
10/10/19 | 005R1-D14/03-AECOM | Source Removal at the BLDG 35 site, located within the Miami Opa-locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/10/19 | 007R1-D14/03-AECOM | Source Removal at the BLDG 9 site, located within the Miami Opa-locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/10/19 | 001-D14/01-AECOM | Source Removal & Additional Assessment at the BLDG 119 site, located within the Miami Opa-locka Executive Airport, on behalf of the Miami-Dade Aviation Department |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
10/3/19 | RFQ 19-17560-KG | Perdue AHU Replacements |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set-Aside |
N/A | ||
10/3/19 | DB19-DTPW-03 | Roadway Improvements to NE 2 Avenue from NE 20 Street to NE 36 Street |
SBE/A&E – 100% Goal |
N/A | N/A | N/A |
100.00% SBE-A&E Goal Tier 3 Set-Aside |
N/A | ||
9/24/19 | 422003-19-003 | Hurricane Irma – West Bridge Bicycle – Pedestrian Underpass Fence Replacement |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/20/19 | 20190209 | FDOT Traffic Signals Preventive Maintenance |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
10.65% DBE Goal |
N/A | ||
9/20/19 | HPEDREN18-R | Edison Community Resource Center Renovation |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/19/19 | 701601-12-004 | Homestead Bayfront Park – Boat Launch Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
9/5/19 | RPQ NO. 20190236 | Push Button Intersection Improvements South |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
9/4/19 | RFQ 19-17438-KG | West Wing – DTC Doors Replacements |
SBE/Cons – 100% Level 3 Set-Aside |
N/A | N/A | N/A |
Level 3 Set Aside 100% SBE-Con Goal |
N/A | ||
9/3/19 | RPQ No. 490901-05-002 | TREE ISLAND PARK - PHASE 1 PARK DEVELOPMENT |
SBE/Cons – 25.22% Goal |
N/A | N/A | N/A |
25.22% SBE- Con Goal 4.00% SBE-Services |
N/A | ||
8/30/19 | RPQ No. HI-199855 | Hurricane Irma – Multiple Parks Roof Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/30/19 | RPQ No. HI-199856 | Hurricane Irma – Multiple Parks Roof Repairs- North |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/28/19 | DRM-FCC-2019 | Florida City Canal Outfall and Equalizer Improvements |
SBE/Cons – 0.4% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/28/19 | DRM-PLG-2019 | South Miami-Dade Salt Intrusion Barrier |
SBE/Cons – 1.5% Goal |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/27/19 | RPQ No. Samiranda | Single Family Home Rehabilitation Project - Juan Miranda |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/27/19 | RPQ No. Sabethel-R | Single Family Home Rehabilitation Project – Laura Bethel |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/19/19 | RPQ No. 20190211 | Push Button – North Roadway Resurfacing |
SBE/Cons – Trade Set Aside 1 Trade Set Aside 2 |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 10.00% CWP Goal |
N/A | ||
8/19/19 | RPQ No. 20190212 | Push Button – South Roadway Resurfacing |
SBE/Cons – Under Review |
N/A | N/A | N/A |
Trade Set-Aside 1 Trade Set Aside 2 0.00% CWP Goal |
N/A | ||
8/19/19 | 2017-035.02B | North Cruise Boulevard Extension – Phase II B |
SBE/Cons – 18.26% Goal |
N/A | N/A | N/A |
18.26% SBE-Con Goal 2.20% SBE-Goods Goal 10.00% CWP Goal |
N/A | ||
8/13/19 | AAA-08-13-2019 | XFINITY EAST PLAZA EXISTING FLOORING EXTENSION/UPGRADE |
SBE/Cons – 33.58% SBE-Con |
N/A | N/A | N/A |
33.58% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
8/13/19 | RPQ No. Mech 042 HVAC | Weatherization Assistance Program (WAP) |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/13/19 | RPQ No. WAP-042 B | Weatherization Assistance Program (WAP) |
No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/7/19 | RFQ 19-17326-HO | Time & Materials Contract for General Contractor Services |
SBE/Cons – 100% Level 1 Set-Aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
8/6/19 | AAA-08-06-2019 | New Era Store Refresh |
SBE/Cons – 24.66% SBE/Cons Goal |
N/A | N/A | N/A |
24.66% SBE/Cons goal |
N/A | ||
8/6/19 | RPQ No. HI-Z203970 | Hurricane Irma – Zoo Miami Tiger Temple Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A | No Measure | N/A | ||
8/6/19 | RPQ No. HI-Z203420 | Hurricane Irma – Zoo Miami Park Wide Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
8/2/19 | RFQ 19-17302-KG | Heat Pump AHU Replacement |
SBE/Cons – 100% Level 1 set-aside |
N/A | N/A | N/A |
100% Level 1 Set Aside |
N/A | ||
8/1/19 | RPQ NO. HPEDMOD19 | Edison Community Resource Center Modernization |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/29/19 | RFQ 19-17297-KG | Replace AHU 16 |
SBE/Cons – 100% Level 2 Set-Aside |
N/A | N/A | N/A |
100.00% Level 1 Set Aside |
N/A | ||
7/26/19 | RPQ No. 41785-R | Inspection & Repair and Installation Services to Liquefied Petroleum Gas (LPG) and Natural Gas (NG) Systems for PHCD |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/25/19 | AAA-07-25-2019 | Restroom Refresh |
25.00% SBE-Con Goal 10.00% CWP Goal |
N/A | N/A | N/A |
25.00% SBE-Con Goal 10.00% CWP Goal |
N/A | ||
7/19/19 | 2017-035.02A | N. Cruise Blvd. Extension Phase 2A – FPL Vaults Relocation |
SBE/Cons – 12.99% Goal |
N/A | N/A | N/A |
21.71 SBE-Con Goal 10.00% CWP Goal |
N/A | ||
7/19/19 | 2019-001.02 | Cruise Terminal D and 1500 Building Tenant Relocation |
SBE/Cons – 12.65% Goal |
N/A | N/A | N/A |
20.73% SBE-Con Goal 1.97% SBE-Goods Goal 10.00% CWP Goal |
N/A | ||
7/17/19 | S-943 | CD 2.01(7) ELECTRICAL IMPROVEMENTS - SUBSTATIONS 7A, 8A, 9A, 10A |
SBE/Cons – 11.51% Goal |
N/A | N/A |
13.01% SBE- Gon Goal 3.02% SBE-Goods Goal |
N/A | |||
7/9/19 | S-914R | CD 1.11 GENERAL ELECTRICAL DESIGN – SUBSTATIONS 9, 10, 11, AND 12 |
SBE/Cons – 13.43% Goal |
N/A | N/A | N/A |
14.15% SBE-Con Goal 4.00% SBE-Goods Goal |
N/A | ||
7/8/19 | w-943 | Furnish and Install 36-Inch D.I. Water Main Along NW 106 St., from NW 107 Ave. to NW South River Dr. |
SBE/Cons – 15.65% Goal |
N/A | N/A |
15.65% SBE-Con 4.00% SBE-Goods |
N/A | |||
7/1/19 | RPQ NO. MECH 041- HVAC | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
7/1/19 | RPQ NO. WAP-041 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
7/2/19 | RPQ NO. MDADTF-005 | Terrazzo Flooring Service Contract |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/28/19 | RPQ P0226 | CD 1.11 - EMERGENCY GENERATORS 1 THROUGH 4 REHAB SOUTH DISTRICT WASTE WATER TREATMENT PLANT |
SBE/Cons – 17.21% Goal |
N/A | N/A |
18.00% SBE-Con Goal 4.00% SBE- Goods Goal |
N/A | |||
6/24/19 | MCC-W-016-B | MIA Employee Parking Lot Improvements |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Set-Aside - SBE-Con 10.00% CWP Goal |
N/A | ||
6/21/19 | 2019-001.01 | Video Wall and LAN Room Relocation |
SBE/Cons – 11.90% Goal SBE/G&S – 2.00% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/18/19 | 199676 | CD1: 12(2) C12 CONTACT CHAMBER 4 |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
6/18/19 | 199428 | CD 2.06 CDWWTP Plant 2 Train4 Rehab |
SBE/Cons – Bid Preference |
N/A | N/A | N/A |
Trade Set Aside |
N/A | ||
6/18/19 | 199661 | CD1: 12(2) C12 CONTACT CHAMBER 3 |
SBE/Construction – Bid Preference |
N/A | N/A | N/A |
Trade Set Aside 10.00% CWP Goal |
N/A | ||
6/14/19 | RPQ NO. 41785 | Inspection & Repair and Installation Services to Liquefied Petroleum Gas (LPG) and Natural Gas (NG) Systems for PHCD |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/3/19 | RFP-00945 | Development of Property Adjacent to the Miami Intermodal Center |
No Measure (Revenue Generating) |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
6/3/19 | RPQ No. 41485 | REAC Repairs |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/3/19 | RPQ No. Mech 040-HVAC | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
6/3/19 | RPQ No. WAP-040 B | Weatherization Assistance Program (WAP) |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/28/19 | RFP-0499 | LED Smart Lighting and Smart County System |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside |
N/A | ||
5/25/19 | S-944 | 60-INCH FORCE MAIN (NL-1A) BETWEEN THE INTERSECTIONS OF NE 151 STREET & BISCAYNE BOULEVARD AND NE 163 STREET & NE 8 AVENUE |
SBE/Cons – 6.82% Goal |
N/A | N/A |
6.83% SBE-Con Goal 1.98% SBE-Goods Goal 10% CWP Goal |
N/A | |||
5/23/19 | RPQ NO. 380827-R | Hurricane Irma Related Repairs at the Tri-Rail Station Ceiling Slats and Lighting |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/21/19 | RPQ NO. 365027-R | HURRICANE IRMA RELATED - REPAIR OF DAMAGED FENCE |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/20/19 | 591001-16-004 | CAMP MATECUMBE -NEW PLAYGROUND AND PARKING LOT |
SBE/Cons – 10.96% Goal |
N/A | N/A | N/A |
10.96% SBE-Con Goal 10.00% SBE-Services Goal |
N/A | ||
5/17/19 | DB19-DTPW-01 | Design-Build Services - South Corridor (South-Dade Transitway) Rapid Transit Project |
DBE – 24% Goal |
N/A | N/A | N/A |
5.00% DBE Goal |
N/A | ||
5/13/19 | RPQ No. 20190116 | Street Lighting Maintenance |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/13/19 | RPQ No. 20190115 | Street Lighting Maintenance |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/13/19 | RPQ No. 20190122 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/13/19 | RPQ No. 20190121 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/13/19 | RPQ No. 20190120 | Roadway Resurfacing |
SBE/Cons – Trade Set-Aside |
N/A | N/A | N/A |
Trade Set Aside 1 Trade Set Aside 2 10% CWP Goal |
N/A | ||
5/13/19 | RFQ-19-16997-SW | Purchase/Install Two (2) Boilers at JMH Behavioral Health |
SBE/Cons – Set-Aside |
N/A | N/A | N/A |
100% Level 3 Set-Aside |
N/A | ||
5/10/19 | W-947 | Furnish and Install 36-lnch D.I.P. Water Main along NW/NE 135 Street, from NW 7 Avenue to NE 16 Avenue and FOOT State Road 916/NW/NE 135 Street Improvements |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
5/9/19 | RFP No. 01258 | Baggage Handling System Operation and Maintenance |
SBE/Cons – 26% Goal |
N/A | N/A | N/A |
30.00% SBE-Con Goal No Measure - SBE-G&S 10.00% CWP Goal |
N/A | ||
5/9/19 | X-032B | OPF RTR M2C Road and Facilities-Construction |
SBE/Cons – 7% |
N/A | N/A | N/A |
9.63% SBE-Con Goal No Measure- SBE-G&S |
N/A | ||
5/1/19 | RPQ No. P0225 | Hialeah Water Treatment Plant Chemical Building Lime Slakers and Structural Rehabilitation |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A | N/A |
No Measure - SBE/Con No Measure - SBE/G&S 10.00% CWP Goal |
N/A | ||
4/30/19 | MCC-W-120-A | MIA – NTD D41 Road Guardrail & Access Ladder |
SBE/Cons – Trade Set Aide |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/24/19 | RPQ No. 381460 | RENOVATION OF NORTHEAST BUS TRANSPORTATION BUILDING AND OPERATORS BATHROOMS |
SBE/Cons – No Measure (Federally Funded) |
N/A | N/A | N/A |
No Measure |
N/A | ||
4/19/19 | P0223 | Downtown Doral PS0014 Reconstruction Sanitary Sewage pump Station |
SBE/Cons – 15.5% Goal |
N/A | N/A | N/A |
Under Review |
Under Review |
N/A | |
4/18/19 | RPQ No. MDFRD-MOLDRRR | Mold Remediation and Repair/Restoration Services |
SBE/Cons – Under Review |
N/A | N/A |
Trade Set Aside |
N/A | |||
4/17/19 | RPQ No. MDFRD-AIRHK | AirHawk Air Cleaning Devices Email Notification System lnstallation |
SBE/Cons – Trade Set Aside 10.00% CWP Goal |
N/A | N/A | N/A |
SBE/Cons – Trade Set Aside 10.00% CWP Goal |
N/A | ||
4/17/19 | ITB No. MDAD-02-17 | Hazardous Material Removal Services |
SBE/Cons – 5% Goal |
N/A | N/A | N/A |
5.00% SBE-Con Goal 0.37% SBE-Goods Goal 0.63% SBE-Services Goal 10% CWP Goal |
N/A | ||
4/15/19 | RPQ 422801-17-004 | Crandon Marina – Boat Slip 2 Dredging |
SBE/Cons – No Measure (Insufficient Availability) |
N/A | N/A |
No Measure |
N/A | |||
4/15/19 | RPQ No. MDFRD-581OPHGRR | MDFR ST 25 HELICOPTER HANGAR - REBID |
SBE/Cons – 24.00% |
N/A | N/A |
24.00% SBE-Con Goal |
N/A | |||
4/15/19 | MCC-V-089-B | MIA - Building 716 Restroom Upgrade and Renovation- Concourses F, G, H |